* * *
3. TARGET (FREIGHT STOCKS)
| No.2017/M(N)/951/18 | Target of ROH outturn for Freight Stock in 2025-26 | 03.02.2025 |
| No.2017/M(N)/951/18 | Freight Stock Performance targets for 2024-25 | 26.04.2024 |
|
2017/M(N)/951/18 |
Revision of Freight Stock Performance Targets for 2023-24 | 24.07.2023 |
| 2017/M(N)/951/18 | 08.06.2023 | |
| 2017/M(N)/951/18 | 06.06.2022 | |
| 2017/M(N)/951/18 | 02.03.2020 | |
| 2017/M(N)/951/18 | 27.03.2019 | |
| 2008/M(N)/951/15 | 22.10.2018 |
* * *
4. FREIGHT TRAINS EXAMINATION
* * *
5. POH/ROH / Deferment INSTRUCTIONS
| 2013/M(N)/951/24 Pt. 2 | Deferment of-- ROH, POH and condemnation of over aged Select Freight Stock till 31.07.2025 | 08.05.2025 |
| 2017/M(N)/951/14 | Revision of ROH and POH periodicity of BOM/DBKM Wagons | 12.11.2024 |
| 2021/M(N)/951/14 | Tyre turning of wheel during ROH of Wagons | 30.08.2024 |
| 2021/M(N)/951/14 Part(1) | Deferment of ROH & POH of Freight stock (All Variants) till31.03.2024 | 26.02.2024 |
| 2017/M(N)/951/14 | 17.01.2024 | |
|
2017/M(N)/951/23
|
21.12.2023
|
|
| 2021/M(N)/951/14 | 14.12.2023 | |
| 2017/M(N)/951/14 | 09.01.2024 | |
| 2018/M(N)/951/33 | 16.08.2023 | |
| 2021/M(N)/951/24 | 10.10.2022 | |
| No.2021/M(N)/951/14
|
Wagon maintenance instructions for fitment of Auxiliary reservoir in freight stock |
10.10.2022 |
| 2021/M(N)/951/14 | 18.08.2022 | |
| 2022/M(W)1/814 |
Warranty on Quality of POH during POHof Rolling Stock at Workshop |
13.06.2022 |
| 2013/M(N)/951/24 pt.2 | 18.04.2022 | |
| No.2022/M(N)/951/34 Pt.2 |
Measure to be taken improvising mobility of BOXN/BOXNL/BOBRN Wagons |
14.04.2022 |
| 2013/M(N)/951/24 pt 2 | 01.02.2022 | |
| .2021/M(N)/951/14 | 31.12.2021 | |
| 2021/M(N)/951/14 | 23.11.2021 | |
| 2021/M(N)/951/14 |
Improvement required in ROH depot during Examination and maintenance of freight stocks |
23.11.2021 |
| 2013/M(N)/951/24 Pt.2 | 27.04.2021 | |
| 2017/M(N)/951/37 | 15.02.2021 | |
| 2006/M(N)/951/28 |
Identification and Sanction of Projects related to Freight Maintenance aligning with Vision 2024 |
24.12.2020 |
| 2019/M(N)/509/5 | 26.11.2020 | |
| 2018/M(N)/60/8 | 15.10.2020 | |
| 2018/M(N)/951/30 | 14.08.2020 | |
| 2015/M(N)/951/1 |
Maintenance of Bogie Mounted Brake System in POH shops and ROH depots. |
28.02.2019 |
| 2018/M(N)/951/30 | 14.02.2019 | |
| 2015/M(N)/951/1 | 10.01.2019 | |
| 2018/M(N)/951/30 |
Rationalization of POH field : Regional arrangements of POH arisings and capacities. |
21.12.2018 |
| 2017/M(N)/951/14 | 10.10.2018 | |
|
2016/M/(N)/951/24
|
20.09.2018 | |
|
2016/M/(N)/951/24
|
05.09.2018 | |
| No. 2015/M(N)/951/17 | 22.04.2018 | |
| 2016/M(N)/951/22 |
Trial Running of BTPGLN rakes on close circuit & premium Examination basis. |
27.02.2018 |
| 2008/M(N)/951/28 | 14.11.2017 | |
| 2016/M(N)/951/24 | 16.08.2017 | |
| 2008/M(N)/951/21 Pt.III | 19.07.2017 | |
| 2016/M(N)/951/24 | 13.02.2017 | |
| 2013/M(N)/951/24 | 23.08.2016 | |
| 2009/M(N)204/4 Pt. |
Examination Pattern and ROH POH periodicity of Road Railer type BAFRDR Rolling Stock |
10.08.2016 |
| 2016/M(N)/172/1 | 27.05.2016 | |
| 2013/M(N)/951/24 | 19.05.2016 | |
| 2013/M(N)/951/24 | 30.12.2015 | |
| 2013/M(N)/951/24 | 21.08.2015 | |
| 2013/M(N)/951/24 |
Measures to be taken for increasing availability of wagons during oncoming peak season |
17.08.2015 |
| 2008/ M(N)/951/21 Pt.III |
Acceptance of debits against the wagon NPOHrepairs through the Railway PSUs |
25.06.2015 |
| 2008/M(N)/951/21 Pt.III |
Repairs of accumulated Ineffective wagons through Railway PSUs. |
31.03.2015 |
| 2013/M(N)/951/24 | 25.02.2014 | |
| 2013/M(N)/951/23 |
Committee to examine issues of wagon maintenance facilities. |
23.10.2013 |
| 2013/AM(ME)/HK-2)Misc. | 18.07.2013 | |
| 2003/M(N)/951/22 |
Report on Must-Change Items in Freight Stock during POH & ROH. |
16.01.2013 |
| 2008/M(N)/951/21 | 06.12.2012 | |
| 2007/M(N)/951/45 | 05.12.2012 | |
| 2007/M(N)/951/45 | 17.09.2012 | |
| 2012/M(N)/951/5 |
Defects observed on air brake stock marked sick within 90 days of POH ROH. |
16.07.2012 |
| 2008/M(N)/951/21 Pt. | 02.07.2010 | |
| 2007/M(N)/951/45 | 25.06.2010 | |
| 2005/M(N)/951/13 Pt. Vol-1 |
Strengthening of infrastructure for maintenance of freight stock. |
19.08.2007 |
| 2005/M(N)/951/13 | 19.08.2007 | |
|
2002/M(N)/951/21 |
23.06.2003 |
***
6. CONTAINERS/PRIVATE WAGONS
| 2023/TC(FM)/4/30 | Calculation of Maintenance Charge on GPWIS Wagons. | 09.09.2025 |
| 2022/M(N)/951/34 | Recommendations of RDSO on the Investigation of Incident Involving Toppling of Double Stack Containers on Wagon No. 62250633346 (BLCBM) | 02.06.2025 |
| 2018/M(N)/951/5Pt.1 | Loading of steel coils in container wagon. | 04.04.2025 |
| 2007/M(N)/204/3 |
Approval of Wagon Design under previous policy |
14.10.2024 |
| 2015/M(W)/814/18E | Maintenance charges towards rolling stock owned by Ministry of Defence |
25.06.2024
|
| 2023/M(N)/951/7 | Yard examination and repair during examination of NRC wagons at locations other than IR maintenance depots. | 24.06.2024 |
| RDSO-MW0WD(CONT)/2/2020-O/o PED/SW/RDSO | New Documents (Technical Pamphlet no G-117) for safe operation of containers over Indian Railways/DFCCIL. | 02.05.2024 |
| No.RDSO-MW0WD(CONT)/2/2020-O/o PED/SW/RDSO | TECHNICAL PROCEDURE/GUIDELINES FOR GENERAL INSPECTION DURING ROH/POH, REPAIR OF CRITICAL WELD JOINTS, REPAIR OF CENTRE SILL, CENTRE GIRDER & SOLE BAR CRACKS & STRENGTHENING OF UNDERFRAME OF BLC/BLCM/BLCS (A-CAR & B-CAR) WAGONS | April 2024 |
| No.2018/M(N)/951/5 | 12.03.2024 | |
|
2007/M(N)/204/3.-Part (2) |
New Wagon Design Approval Policy – Revision 2.0 (NWDAP-Rev.2.0) | 07.02.2024 |
| 2018/M(N)/951/5 |
Availability and Proper functioning of Automatic Twist Locks (ATLs) in container wagons |
01.08.2023 |
| 2018/M(N)/60/8951/34 Pt.3 |
Rationalisation of CC examination system of Containers Rakes:- Twining of depots on trails basis |
08.02.2023 |
| No.2018/M(N)/951/5 | 06.12.2022 | |
| 2007/M(N)/204/3.-Part(2) | 10.08.2022 | |
| -- | Guidelines for safe operation of containers over Indian Railways network | 07.07.2022 |
| No.2007/M(N)/204/3.-Part(2) | 29.06.2022 | |
| No.2007/M(N)/204/3.-Part(2) | 27.12.2021 | |
| No.2007/M(N)/204/3.-Part(2) | 24.12.2021 | |
| 2018/M(N)/951/5 | 30.04.2021 | |
| 2014/M(N)/951/4 | 02.03.2021 | |
| 2018/M(N)/951/5 |
Rationalization of CC examination system of container rakes: Twinning of depots on trial basis. |
15.02.2021 |
| 2020/TT-III/73/23 | 13.01.2021 | |
| 2018/M(N)/951/5 | 22.06.2020 | |
| 2018/M(N)/951/7 |
Maintenance of wagons inducted under General purpose wagon investment scheme. |
06.05.2020 |
| 2018/M(N)/951/5 | 30.12.2019 | |
| 2019/M(N)/951/4 |
Planning maintenance depots for incressing operation of BCACBM wagons. |
30.12.2019 |
| 2018/M(N)/951/7 | 21.11.2019 | |
| 2018/M(N)/951/5 | 28.02.2019 | |
|
2014/M/(N)/951/4
|
06.12.2018 | |
| 2015/M(N)/951/2 |
|
10.10.2018 |
|
2013/M/(N)/951/7
|
Planning maintenance depots for increased operation of BCACBM Wagons |
20.09.2018 |
| 2013M(N)/951/7 |
Policy for maintenance of private wagons : General purpose Wagon investment Scheme (GPWIS) |
03.07.2018 |
| 2018/M(N)/951/5 |
Examination of container trains : Rakes with expired / about to expire BPCs. |
03.05.2018 |
| 2008/M(N)/204/2/Vol.I | 03.05.2018 | |
| 2013/M(N)/951/7 |
Policy for maintenance of private wagons : General Purpose Wagon Investment Scheme (GPWIS) |
03.07.2018 |
| 2018/M(N)/951/5 |
Examination of container train: Rakes with expired / about to expire BPCs |
03.05.2018 |
| 2014/M(N)/951/4 | 21.04.2017 | |
| 2014/M(N)/951/1 Millrail |
Maintenance charges towards rolling stock owned by Ministry of Defence. |
12.01.2017 |
| 2014/M(N)/951/4 | 21.06.2016 | |
| 2013/M(N)/951/5 | 04.11.2015 | |
| 2014/M(N)/951/4 | 03.11.2015 | |
| 2010/M(N)/951/5 | 10.09.2015 | |
| 2015/M(N)/951/2 |
Distribution of maintenance charges for BLC container flats for the period Apr. 2015 to Sept 2015 |
13.07.2015 |
| 2013/M(N)/951/5 | 16.04.2015 | |
| 2006/M(N)/951/1 Vol.I | 20.02.2015 | |
| 2013/M(N)/951/7 | 12.09.2014 | |
| 2013/M(N)/951/5 | 23.07.2014 | |
| 2000/M(N)/60/2/Wagon Census | 23.07.2013 | |
| 2011/M(N)/960/1 |
Nomination of ROH depots & POH workshop for BLC rakes maintenance. |
11.09.2012 |
| 2006/AC-II/45/13 |
System of Accountal of Maintenance Charges of Container (BLC) Wagons. |
03.07.2012 |
|
2010/M(N)/951/5 |
Nomination of ROH depots and POH workshops for BLC rakes maintenance |
25.06.2012 |
|
2008/M(N)/204/2/Vol.1 |
Maintenance of Private Wagons - appointment of maintenace charges. |
25.11.2011 |
|
2010/M(N)/951/5 |
Derailment of BLC wagons owned by M/S Arshiya Rail Infrastructure Ltd. In RNC division on 13/07/10 |
26.07.2011 |
|
2008/M(N)/204/2Vol.1 |
03.05.2011 |
|
|
2007/M(N)/951/67 |
29.10.2009 |
|
| 2009/TT-III/73/8 | 30.09.2009 | |
|
2007/M(N)/951/67 |
19/20.11.2008 |
|
|
2002/M(N)/204/10/Vol.1 |
30.07.2009 |
|
| .2007/M(N)/951/4 | Maintenance charges of rolling stock( coaches, wagons etc ) owner by other Government departments like M/o Defence |
14/17.02.07 |
| .2001/M(N)/951/4 | Maintenance charges of freight stock owned by Non Railway Customers / capital cost calculation. | 10.03.10 , 26.12.2003 , 09.04.2003 |
***
7. TANK WAGONS
| 2019/M(N)/951/17 | Infrastructural facility in yards for examination of Tank wagons. | 06.07.2025 |
| 2019/M(N)/951/17 | Maintenance of Master Valves BTPN Wagon | 26.07.2024 |
| No.2007/M(N)/951/66 | Operation of freight trains carrying liquid oxygen | 09.05.2021 |
| No.2007/M(N)/951/66 | Operation of freight trains carrying liquid oxygen | 09.05.2021 |
| 2015/M(N)/951/17 | Modification to prevent cracks in centre sill of BTPN Wagons |
17.12.2018
|
| 2015/M(N)/951/17 | Barrel leakage in tank wagon | 25.05.2017 |
| 2015/M(N)/443/6 | Carrying Capacity of BTAP Wagons | 16.03.2017 |
|
2005/M(N)/951/41 |
11.07.2012 |
|
|
2007/M(N)/951/6 |
11.07.2012 |
***
8. BRAKE VANS/ 4-WHEELERS
| MW/BVZI/RDSO | Failure of Center Pivot pin of BVZI wagon | 08.05.2024 |
| No.2007/CEDO/SR/11 | 16.06.2023 | |
| 2019/M(N)/951/19 |
Drive for proper maintenance of Guard Brake Vans (BVZI/BVZC/BVCM) |
30.12.2022 |
| 2002/M(N)/443/5 | 20.05.2016 | |
| 2006/M(N)/60/9 | 06.11.2012 | |
|
2003/M(N)/951/17 |
30.03.2011 |
***
9. CTRB / Hot Axle
| MW/WAD/ADPT | Improper/ incorrect fitment of adapters in freight bogies. | 14.10.2024 |
| 2018/MN)/951/35 Pt.1 | Recommendations of the committee constituted to examine CTRB issues of freight Rolling Stock. | 16.02.2024 |
| 2018/M(N)/951/35 |
Measures to be taken for controlling cases of CTRB failures in Wagons |
06.01.2023 |
| 2018/M(N)/951/35 | 30.07.2019 | |
|
2018/M(N)/951/32 |
Preventive measures for hot axles : Derailment at Balamau/NR |
03.01.2019 |
| 2016/M/(Safety)/7/6/4 | 24.12.2018 | |
|
2018/M/(N)/951/35
|
31.10.2018 | |
| 2015/M(N)/951/32 | 20.03.2018 | |
| 2015/M(N)/951/32 | 09.10.2017 | |
| .2015/M(N)/951/32 | 04.10.2017 | |
| 2015/M(N)/951/32 | 04.10.2017 | |
| 2015/M(N)/951/32 | 28.08.2017 | |
| 2015/M(N)/951/32 | 27.03.2017 | |
| 2015/M(N)/951/32 | 10.03.2017 | |
| 2015/M(N)/951/32 | 12.01.2017 | |
| 2015/M(N)/951/32 | 04.11.2016 | |
| 2015/M(N)/951/32 | 29.08.2016 | |
| 2015/M(N)/951/32 | 03.08.2016 | |
| 2015/M(N)/951/32 | 30.06.2016 | |
| 2015/M(N)/951/32 | 30.05.2016 | |
| 2015/M(N)/951/32 |
Overhauling particulars of CTRBs: Investigation after hot axle and accident cases |
04.02.2016 |
| 2015/M(N)/951/32 | 13.05.2016 | |
| 2015/M(N)/951/32 | 26.02.2016 | |
| 2015/M(N)/951/32 | 02.11.2015 | |
| 2015/M(N)/951/32 | 28.10.2015 | |
| 2015/M(N)/951/32 | 28.10.2015 | |
| 2015/M(N)/951/32 | 05.10.2015 | |
| 2012/M(N)/951/26 |
Marking of overhauling particulars on out cup of CTRB during POH |
11.09.2015 |
| 2012/M(N)/951/26/Pt. | 20.01.2015 | |
| 2005/M(N)/951/49 | 06.12.2012 | |
| 2003/M(N)/951/22 |
26.11.2012 |
|
|
2005/M(N)/951/49 |
06.07.2012 |
|
|
2005/M(N)/951/49 |
05.10.2011 |
***
10. CONDEMNATION OF WAGONS
| 2007/M(N)/60/7 | 28.07.2025 | |
| 2016/M(N)/951/28 |
Guidelines for considering extension of codal life of wagon beyond the prescribed period |
03.08.2023 |
| 2017/M(N)/951/14 Pt.2 | 08.02.2023 | |
| 2016/M(N)/951/28 | 15.01.2023 | |
| 2016/M(N)/951/28 |
Guideline for considering extension of codal life of wagons,beyond the prescribed period |
01.08.2022 |
| No.2022/ACII/2/1 | 06.06.2022 | |
| No.2004/M(N)/951/2 |
Extension of codal life of Freight wagons over Indian Railways |
10.01.2022 |
| 2018/M(N)/60/8 |
Processing of condemnation proposal for approval of offering of condemnation approval for disposal |
14.10.2020 |
| 2018/M(N)/60/4 |
Collection , uses and disposal of excluded fitting of condemned wagons |
14.11.2019 |
| 2007/M(N)/60/7 |
|
26.09.2018 |
|
2011/M/(N)/60/8
|
17.08.2018 | |
| 2011/M(N)/60/8 | 02.04.2018 | |
| 2004/M(N)/60/8/Vol.I(Pt.) |
Policy for condemnation of wagons: Condemnation of surplus MG Stock. |
18.12.2017 |
|
2007/M(N)/60/7
|
24.11.2017 | |
| 2007/M(N)/60/7 | 24.11.2017 | |
| 2004/M(N)/60/8 Vol.I(Pt.) | 06.07.2017 | |
| 2004/M(N)/60/8 Vol.I | 13.08.2015 | |
| 2011/M(N)/60/8 | 27.01.2015 | |
| 2014/M(N)/951/1 | 10.11.2014 | |
| 2006/M(N)/60/9 | 28.10.2013 | |
| 2006/M(N)/60/9 | 05.08.2013 | |
| 2010/M(N)/60/5 | 15.05.2013 | |
| 2006/M(N)/60/9 | 15.11.2012 | |
| 2010/M(N)/60/5 | 10.10.2012 | |
|
2010/M(N)/60/5 |
17.04.2012 |
|
|
2007/M(N)/951/5 |
Policy for use of Overaged/Condemnable wagons for departmental purpose |
11.11.2011 |
|
2007/M(N)/60/7 |
21.10.2010 |
|
|
2010/M(N)/60/5 |
17.09.2010 |
|
|
2004/M(N)/60/8 Vol.I |
12.07.2010 |
|
| 2004/M(N)/60/8 Vol.I | Disposal of Surplus MG Wagons-Premature Condemnation | 08/12.07.2010 |
|
2007/M(N)/60/7 |
04.03.2010 |
|
| 1970/M(N)/951/19 | Condemnation of wagons | 07.06.1972 |
***
11. ROLLING STOCK PROGRAMME
|
Letter to PCME All ZRs. Reg. Upgradation of 81017 wagons for 100 kmph @ 38461/- per wagon, (PB itemno. 1321/21-22, 896/23- 24, 456/24-25, 506/25-26). dated 06.11.2025 |
06.11.2025 | |
| Requirement of Additional Fund for Wagon maintenance | 01.11.2023 | |
|
2019/M(N)/60/7-pt2 |
Distribution of 144000 friction wedges PB item No 941/2021-22 | 08.10.2021 |
|
No.2019/M(N)/60/7 |
26.02.2021 |
***
12. BCN / BOXN/BRN WAGONS
***
13. MEETINGS/TOUR NOTE
| 2022/M(N)/951/Wagon Door |
Minutes of the meeting on Door Repair by MT&RS with PCME/ECR Held On 08.01.2024 THROUGH V.C. |
10.01.2024 |
***
14. Wagon Master / IRWMS
* * *
15. NEUTRAL CONTROL ORGANIZATION - NCO
16. Equipment Failure / Damages to Wagons/ Train Parting / Load Detachment / Punctuality
| 2015/M(N)/951/63 | Damages to wagons during loading and unloading. | 02.05.2025 |
| 2012/M(N)/951/35 | Guidelines to prevent uncoupling cases of freight trains | 04.09.2024 |
|
012/M(N)/951/32 |
En-route detachment of Brake Van | 08.02.2024 |
|
2012/M(N)/951/35 |
Joint inspection report on train parting of MVAA/BLCM at BTTR station in BZA division | 30.01.2024 |
| 2012/M(N)/951/35 | 15.01.2024 | |
| 2012/M(N)/951/35 | Special drive for controlling train parting cases | 21.08.2023 |
| 2012/M(N)/951/35 | 08.02.2023 | |
| 2015/M(N)/951/63 | 28.04.2022 | |
| 2022/M(N)/951/34 Pt.I | 11.04.2022 | |
| 2015/M(N)/951/63 | 06.04.2022 | |
| 2015/M(N)/951/63 | 06.04.2022 | |
| 2015/M(N)/951/63 |
Monitoring of Damages of Wagons in siding at the time of Loading/Unloading |
31.12.2020 |
| 2012/M(N)/951/35 | 01.09.2020 | |
| 2015/M(N)/951/63 | 28.02.2020 | |
| 2012/M(N)/951/35 | 22.11.2019 | |
| 2019/M(N)/951/36 |
Strategy / action plan for achieving Operating Ratio( OR) of 95% / 90% in 2019-20 |
25.09.2019 |
| 2012/M(N)/951/35 | 01.08.2019 | |
| 2015M(N)/951/63 | 19.06.2019 | |
|
2015/M(N)/951/63
|
06.06.2019 | |
| No.2015/M/(N)/951/63 | 21.05.2019 | |
|
2015/M/(N)/951/63
|
17.12.2018 | |
| 2008/M(N)/951/15 |
Short term and long term plan for reducing Freight Ineffective. |
13.06.2018 |
| 2014/M(N)/951/8 Pt | 25.05.2018 | |
| 2008/M(N)/951/5 | 18.05.2018 | |
| 98/M(N)/951/9 Pt.I |
Damages to wagons in private sidings: Execution of standard sidings. |
11.04.2018 |
| 2014/M(N)/951/8 Pt | 25.02.2018 | |
| 2008/M(N)/951/15 |
Discrepancy in FOIS Report (RB-527) and daily position given to Railway Board |
11.02.2016 |
| 2012/M(N)/951/35 | 29.10.2015 | |
| 2010/TT-IV/9/1 | 18.09.2015 | |
| 2008/M(N)/951/15 | 20.08.2015 | |
| 2013/M(N)/951/17 | 15.04.2015 | |
| 2015/M(N)/951/7 | 03.02.2015 | |
| 2008/M(N)/951/15 Pt. | 06.08.2014 | |
| 2013/M(N)/951/17 | 11.04.2014 | |
| 2010/TT-IV/9/1 | 08.10.2012 | |
| 2007/M(N)/951/45 | 17.09.2012 | |
| 98/M(N)/951/12/Pt.I | 14.09.2012 |
***
17. Reports
***
18 CRS SANCTION
| 2018/M(N)/172/1 | Subject line to be used for display – Guidelines for simplification of operating Speeds of Different types of Wagons | 14.06.2025 |
| No.2015/M(N)/951/31 | 28.04.2022 | |
| No.2015/M(N)/951/31 | 14.05.2021 | |
|
2014/M/(N)/204/2
|
10.08.2018 | |
| 2014/M(N)/204/2 | 15.05.2017 | |
| 2015/M(N)/951/31 Pt. | 06.02.2017 | |
| 2007/M(N)/204/8 Vol.I |
Railway Board's sanction for running of BOXNHAM (CC+8+2t) having maximum axle load of 22.82t. |
07.06.2012 |
| 2002/M(N)/204/7 Vol.1 | 15.02.2012 | |
| 2002/M(N)/204/7 Vol.I |
Railway Board's sanction letters for running of various types of wagons. |
19.10.2011 |
***
19- Freight Maintenance Manager - FMM
| 2018/M(N)/951/33 | 16.01.2024 | |
| 2018/M(N)/951/33 |
FMM functionality- Railway owned Weighbridge details and status |
23.12.2020 |
| 2018/M(N)/951/33 | 05.10.2020 | |
| 2018/M(N)/951/33 | 05.10.2020 | |
| 2019/CRIS/NDLS-ITPI/RFID/POLICY/0151/PT-I |
Guidelines for using Data of RFID Tags of the Indian Railway (V3.1) |
22.08.2019 |
| MW/RFID | 18.04.2019 | |
| MW/Lock Bolt | 01.04.2019 | |
| 2018/M/(N)/951/33 | 13.11.2018 | |
| 2018/M(N)/951/23 Pt. | 03.05.2018 | |
| No.2015/M(N)/951/33 |
Implementation of ROAMS-FMM(Yard Application) in all yards of Indian railways. |
05.04.2018 |
| 2015/M(N)/951/33 |
Implementation of ROAMS-FMM (Yard Application) in all Yards of Indian Railways |
06.04.2016 |
| 2015/M(N)/951/33 | 10.08.2015 |
20. WHEEL/AXLE/Ultrasonic Testing (UST)
21. Weighbridges (EIMWB / Static / Pre-weigh Bin - Weightometer) and Test Wagon Sets
22. Brake / Twin Pipe / BMBS
| Analysis of failure of Distributor valves in Freight Stock. | 17.11.2025 | |
| 2022/M(N)/60/3 | Monitoring of upgradation of KBD BMBS in ROH Depots | 15.07.2025 |
| 2017/M(N)/60/3 | Maintenance of 'E' dimension of Slack adjuster in Freight Stock. | 20.12.2024 |
| 2022/M(N)/60/3 | Ensuring modification in Escorts make BMBS | 24.10.2024 |
| 2017/M(N)/60/3-Part(1) | Ensuring ‘e’ dimension of Slack adjuster of Wagon in workshops --NTXR rejectable items in POH. | 14.10.2024 |
| 2012/M(N)/951/35 | Non-Fitment of modified brake beam hanger and 100% re-profiling of wheel as NTXR rejectable items in ROH & POH. | 30.09.2024 |
| Operation of Freight Trains Consisting of wagons having BMBS- Revised Instructions | 02.02.2024 | |
| 2022/M(N)/60/3 | 01.09.2023 | |
| Limited dispensation for upgradation of KBD 10" to BMBS 11" at NTXR Rejectable item at wagon workshops | 01.11.2023 | |
| No.2022/M(N)/60/3 | 01.09.2023 | |
| 2017/M(N)/60/3 | Retrofitment of twin-pipe in wagons | 30.08.2023 |
| 2022/M(N)/60/3 | Measures for operation of freight trains consisting of wagons having BMBS - Latest instructions regarding mixing of wagons | 04.05.2023 |
| No.2022/M(N)/60/3 | Mixing of BCFC/BCFCM wagons with BCCW wagons owned by NRC for bringing down %age Knorr Bremse design BMBS wagons in a Rake | 21.03.2023 |
| 2017/M(N)/60/3 | Operation of freight trains in twin pipe air brake system mode and Retrofitment of Twin Pipe in Wagons | 24.01.2023 |
| 2022/M(N)/60/3 | Measures of operation of Freight Trains consisting of wagons having BMBS - Revised Instructions | 17.01.2023 |
| 2017/M(N)/60/3 | Operation of freight trains in twin pipe air brake system mode | 18.04.2022/19.04.2022 |
| 2017/M(N)/60/3 | Retro-fitment of twin pipe in wagons-dispensation regarding | 31.03.2021 |
| 2017/M(N)/60/3 | Retrofitment of twin-pipe in private wagons | 03.02.2021 |
| 2017/M(N)/60/3 | Retrofitment of twin pipe in wagons | 30.12.2020 |
| 2017/M(N)/60/3 | Retrofitment of twin pipe in wagons | 28.06.2019 |
| 2015/M/(N)/951/1 | Maintenance of Bogie Mounted Brake system in POH | 28.02.2019 |
| 2010/M/(N)/60/1 Pt2 | Running of freight trains with twin pipe air brake Wagons | 06.02.2019 |
| 2017/M(N)/60/3 | "Retro-fitment of twin pipe in wagons owned by private parties" | 08.02.2019 |
| 2017/M(N)/60/3 | "Retro-fitment of twin pipe in wagons owned by private parties" | 24.01.2019 |
|
2015/M/(N)/951/1
|
Operation of BMBC fitted BOXNHL/BCNHL/ other wagons | 10.01.2019 |
| 2017/M(N)/951/14 | Running of freight trains with twin pipe air brake wagons. | 10.10.20218 |
| 2010/M(N)/60/1 Pt. II | Running of freight trains with twin pipe air brake wagons. | 10.10.2018 |
| No.2010/M(N)60/1 Pt.II | Running of freight trains with twin pipe air brake wagons. | 18.08.2017 |
| 2010/M(N)/60/1 Pt.II | Running of freight trains with twin pipe air brake wagons | 18.08.2017 |
| 2017/M(N)/60/3 | Conversion of single pipe air brake wagons to twin pipe | 14.08.2017 |
| 2017/M(N)/60/3 | Retrofitment of twin pine in wagons | 08.06.2017 |
| 2015/M(N)/951/1
|
Retrofitment of Bogie Mounted Brake System (BMBS) in Air Brake | 18.03.2016 |
| 2010/M(N)/60/10 Pt.II | Joint Procedure Order (JPO) for the running of freight trains with twin pipe brake system | 25.08.2015 |
| 2010/M(N)/60/1 Pt.II | Running of Rakes withTwin Pipe | 05.03.2015 |
| 2010/M(N)/60/10 Pt.II | Running of Twin Pipe BOXNHL & BCNHL rakes. | 07.01.2015 |
|
2012/M(N)/204/3
|
Retropfitment of BMBS in AB Wagons | 05.07.2012 |
|
2012/M(N)/204/3
|
Retrofitment of Bogie Mounted Brake System (BMBS) in Air Brake Wagons. | 11.05.2012 |
23. MISCELLANEOUS CIRCULARS
| 2014/M(N)/ 951/6 Pt.1 | Expeditious procurement of Design "B" Elastomeric Pads |
23.10.2025 |
|
|
Modification of gearboxes in BOBYN Wagon | 14.07.2025 |
| 2019/M(N)/951/17 | Awareness video & posters for BTPN, Beam, CCSB & ATL maintenance practices | 08.07.2025 |
| 2022/M(C)/141/6 Safety | Focused maintenance of rolling Stock | 28.05.2025. |
| 2019/M(N)/204/6 | Compendium of instructions on loading of consignment on wagons (Rev-3). | 06.05.2025 |
| 2005/M(N)/204/3 | Modification work in BOBYN wagons. | 29.04.2025 |
| 2014/TT-1/RDSO/33/03 | Guidelines for segregation of wagons and validation of Wagon Speeds while issuing BPC | 01.04.2025 |
| 2019/M(N)/204/6 | DOs & DON'Ts in loading/unloading of consignments on wagons (Revision-1). | 20.03.2025 |
| 2019/M(N)/204/6 | Compendium of latest instructions on loading of various consignments on wagons (Rev-2). | 24.12.2024 |
| 2005/M(N)/204/3 | Technical guidelines for maintenance of door operating mechanism in BOBYN wagon | 08.11.2024 |
| 2014/M(N)/204/2 | Loading and movement of Steel SLAB in BFNS 22.9 T axle load wagons. | 25.10.2024 |
| MW/PLNG/CSNB/II | Updation of RDSO Vendor Directory for CASNUB 22RFT Bogie and Revised Specification WD-17-CASNUB-22HS-BOGIE-92 | |
| MW/PLNG/CSNB/II | Updation of RDSO Vendor Directory for CASNUB 22RFT Bogie and Revised Specification WD-17-CASNUB-22HS-BOGIE-92. | 18.09.2024 |
|
RDSO-MW0BD(SB)/1/2020-O/o PED/SW/RDSO |
A Comprehensive Guideline on Fitment and Maintenance of Constant Contact Side Bearers Used in Freight Wagons Bogie. | 04.06.2024 |
| No. 2019/M(N)/204/6 | Compendium of latest instructions on loading of various consignments on wagons (Rev-1). | 17.05.2024 |
| No. 2019/M(N)/204/6 |
Compendium of latest instructions on loading of consignment on wagons. |
13.03.2024 |
| Repair Procedures of Open Wagons. | 27.12.2023 | |
| No.RDSO-MW0GENL(EOFC)/8/2023-O/o PED/SW/RDSO |
Compendium of instructions issued by RDSO on loading of consignments on wagon |
09.08.2023 |
| 202/TT-1/27/1 | 04.08.2023 | |
| 2022/RS(G)/779/7(3390005) | 17.10.2022 | |
| No.2008/M(N)/951/15 | 07.01.2022 | |
| 1998/M(N)/951/9pt1 |
Policy for deployment of C&W staff in private freight terminals |
01.10.2021 |
| IRCAMTECH.M.GWL.Duty List C&W Staff. | May-2021 | |
| 2016/M(N)/951/12 | 26.11.2020 | |
| 2014/M(N)/951/6Pt.I |
Procedure order for tackling the cases of failure of EM pads enroute |
10.09.2020 |
| 2014/M(N)/951/6 Pt.I |
Warranty failure and other enroute failure of elastomeric pads |
20.07.2020 |
| No. 2015/M(N)/204/4 | 01.05.2020 | |
| 2017M(N)/951/32 |
Defect in center sill, knee plate and sole bar cracks in BRN 22.9 wagons |
20.08.2019 |
| 2015/M(N)/951/4 |
Manufacture of wagons against RSP Purchase Orders and non-RailwaNRy Customer (C) |
20.08.2019 |
| 2018/M(N)/60/4 | 14.05.2019 | |
| 2001/M(N)/951/6 Pt. | 27.02.2019 | |
| 2001/M(N)/951/6 Pt. | 22.02.2019 | |
| 2017/M(N)/951/32 | 31.01.2019 | |
| 94/M(N)/951/27 |
Revised Colour Scheme wagons to be operated on Indian Railway's network |
17.10.2018 |
| No.2015/M(N)/204/4 | 09.04.2018 | |
| 2016/M(N)/951/12 |
Implementation of paperless office at Railway Board: E-Office |
23.04.2017 |
| 2004/M(N)/951/2 | 10.01.2017 | |
| 2014/M(N)/951/24 | 05.02.2016 | |
| 2015/M(N)/951/66 | 03.11.2015 | |
| 2015/M(N)/951/47 |
Task force for identifying parameters for condition monitoring of freight stock |
29.10.2015 |
| 2014/M(N)/951/10 |
Integrated Management System (IMS) certification of major freight depots |
02.07.2015 |
| 2015/M(N)/951/12 | 15.05.2015 | |
| 2012/M(N)/951/29 |
Revision of designations of Group 'D' staff in Mechanical Department. |
27.12.2012 |
| 2009/M(N)951/8 Pt. | 03.03.2011 | |
|
2000/M(N)/60/2/Wagon Census |
04.07.2003 |
|
| 99/M(N)/204/8 |
17.11.2000 |
24 - Centre Buffer Coupler - CBC
| 2018/M(N)/172/1 | Application of Gauges during routine maintenance of CBC Knuckle | 09.06.2025 |
| 2018/M(N)/172/1 | Implementation of Committee’s report regarding must change items of CBC and its components - during ROH and POH of wagons | 22.10.2024 |
| 2018/M(N)/951/6 -part (1) | Breakage of CBC Components of freight stock in long Haul Trains | 10.07.2023 |
| 2018/M(N)/172/1 | 04.01.2023 | |
| 2018/M(N)/172/1 |
Maintenance, Examination and Repairs of CBC and its components. |
05.03.2020 |
| 2018/M(N)/172/1 | 03.02.2020 | |
| 2018/M(N)/172/1 | 16.01.2020 | |
| 2018/M(N)/172/1 | 24.04.2019 | |
| 2018/M(N)/172/1 | 11.04.2019 | |
|
2018/M(N)/172/1 |
02.08.2018 |
|
| 2016/M(N)/172/1 |
Procurement of CBC and its components for wagon maintenance and manufacturing |
06.04.2018 |
| 2016/M(N)/172/1 | 28.03.2018 | |
| No.2016/M(N)/172/1 | 09.03.2018 | |
| No.2016/M(N)/172/1 | 06.03.2018 | |
| 2016/M(N)/172/1 |
Procurement of CBC and its components for wagon maintenance and manufacturing –reg. |
28.02.2018 |
|
2016/M(N)/172/1 |
16.02.2018 |
|
| 2016/M(N)/172/1 Pt. |
Procurement of CBC and its components for wagon maintenance and manufacturing. |
01.08.2017 |
| 2016/M(N)/172/1 | 31.10.2016 | |
| 2016/M(N)/172/1 | 06.06.2016 | |
| 2016/M(N)/172/1 | 31.05.2016 | |
| 2016/M(N)/172/1 | 27.05.2016 | |
| 2012/M(N)/172/1 | 16.04.2013 | |
| 2012/M(N)/172/1 | 26.11.2012 | |
| 2012/M(N)/172/1 | 30.10.2012 |
25 - Tippler
| Revised Check Sheet for Joint Inspection of the Wagon Tipplers | 13.06.2024 |
***