|
Letter No. |
Subject |
Date |
| 2025 | ||
| 2025/Elect(TRS)/113/1(Safety Misc) | Safety day drive in connection with yeard derailment of Electric Locomotive in Danapur division of ECR. | 12.09.2025 |
| 2024/Elect(TRS)/225/1 | Assistance required for smooth operation of trains during festive season-2025 | 11.09.2025 |
| 2025/Elect(TRS)/113/1 Misc. | Speed restriction for NMG type rakes over 1 in 8.5 turnouts. | 04.09.2025 |
| 2025/Elect(TRS)/412/1 | Electric Loco Holding Target for September 2025. | 02.09.2025 |
| 2025/Elect(TRS)/412/1 | Electric Loco Holding Target for August 2025. | 01.08.2025 |
| 2025/Elect(TRS)/412/1 | Electric Loco Holding Target for July 2025. | 02.07.2025 |
| 2025/Elect(TRS)/412/1 | Electric Loco Holding Target for June 2025. | 04.06.2025 |
| 2024/Elect(TRS)/720/1 | Policy on assignment of works to Railway PSUs after competitive bidding through limited tender for Operation & Maintenance of newly constructed Railway shed/depot/workshop along with maintenance of rolling stock. | 14.05.2025 |
| 2005/Elect(TRS)/440/23 | Monsoon Preparedness-Electric Locomotive | 08.05.2025 |
| 2021/Elect(TRS)/440/winter/Summerprep (e-file:3345874) | Drive to ensure healthiness on Cab AC in locomotives. | 06.05.2025 |
| 2025/Elect(TRS)/113/5(Committee-paperwork) | Recommendations of the Committee nominated to assess measures for reduction of paperwork by LP/ALP | 01.05.2025 |
| 2025/Elect(TRS)/412/1 | Electric Loco Holding Target for May 2025. | 02.05.2025 |
| 2025/Elect(TRS)/113/Safety Misc. | Preparation and Circulation of Station Yard Diagram Booklets for Crew Awareness | 25.04.2025 |
| 2024/Elect(TRS)/113/11(GR4.41) | Instructions to lookback - GR 4.41 | 11.04.2025 |
| 2024/Elect(TRS)/138/7(Com)(3476271) | Report of the standing multi disciplinary committee to deliberate, engage with federations and submit holistic recommendations on the grievances of loco running staff and issues raised by recognized unions. | 04.04.2025 |
| 2024/Elect(TRS)/412/1 | Electric Loco Holding Target for April 2025 | 02/04/2025 |
| 2025/Elect(TRS)/113/1(Safety Misc) | Derailment of Salekasa, NGP Div./SECR on 01.03.2025 | 24.03.2025 |
| 2024/Elect(TRS)/412/1 | Electric Loco holding Target for March 2025 | 03.03.2025 |
|
Competition of loco cab up-gradation on electric locomotives. |
20.02.2025 |
|
|
Summer preparedness - Electric & Diesel Locomotives. |
17.02.2025 |
|
|
Maintenance of locomotives. |
12.02.2025 |
|
|
Progress review meeting for previously sanctioned works under PH-21 & PH-42 |
11.02.2025 |
|
|
Prevention of axle lock cases by DDS message monitoring in trip sheds. |
06.02.2025 |
|
|
Electric loco holding target for February 2025 |
03.02.2025 |
|
|
Electric loco holding target for January 2025 |
02.01.2025 |
|
|
Mandatory attachment of BP Pipe and BP continuity on banking assisting, dead and relief engines. |
18.12.2024 |
|
|
Provision of Distributed power wireless control system(DFPWCS) on electric locos. |
10.12.2024 |
|
|
Review of Co-Loco Pilot for High Speed Trains. |
09.12.2024 |
|
|
Tools to be carried by crew and provided in tool box on locomotives. |
05.12.2024 |
|
|
Electric Loco Holding Target for December 2024. |
03.12.2024 |
|
|
Compliance of Safety Drive. |
23.10.2024 |
|
|
Winter Preparedness drive. |
21.10.2024 |
|
|
Immersive visit Loco Sheds |
18.10.2024 |
|
|
Fitment of On-Board equipment of Kavach on electric locomotive. |
01.10.2024 |
|
|
Feeding of BPC of goods train through QR code, train no. in case of coaching train and Loco no. by Loco Pilot at the time of CTO (Charge taken over) on Chalak dal App. |
01.10.2024 |
|
|
Unusual Incident of stalling of loco on bridge in Samastipur Div. of ECR on 20.06.2024 |
30.09.2024 |
|
|
Derailment of HAS, MYS Div/SWR on 04.08.2024 |
30.09.2024 |
|
|
Regular inspections by signal sighting committee. |
24.09.2024 |
|
|
Electric Loco Holding Target for the Month of September’ 2024 |
02/09/2024 |
|
|
Electric Loco Holding Target for August 2024 |
01.08.2024 |
|
|
Transfer of coaching locos along with links from ASN/ER to SRC/SER. |
11.07.2024 |
|
| 2024 | ||
| 2024/Elect(TRS)/412/1 | Electric Loco Holding Target for the Month of July’ 2024 | 02/07/2024 |
| 2024/Elect(TRS)/113/1 (Misc) | Decision taken in Board Meeting on 10.04.2024. | 26.06.2024 |
| 2023/Elect(TRS)/113/5 | Rear collision of Train No. 08504 (VSKP-RGDA Passenger) with Train No. 08532 (VSKP-PAS Passenger) between Kantakapalli and Alamanda stations of Waltair Division of East Coast Railway on 29.10.2023. | 25.06.2024 |
| 2006/Elect(TRS)/440/8/4 (Hotel Load) | Drive for cleaning of heat sink & intake filter of hotel load converter in WAP-7 and WAP-5. | 25/06/2024 |
| 2024/Elect(TRS)/113/3 (Fire) | Drive for Fire prevention of Electric and Diesel Locomotives. |
13/06/2024 |
| 2024/Elect(TRS)/412/1 | Electric Loco Holding Target for the Month of June’ 2024 | 03/06/2024 |
| 2024/Elect(TRS)/113/1 (Misc) | Fire in Empty Coaching Rake of Train No. 19051 in Sonpur Division/ECR on 22.04.2024 | 10.05.2024 |
| 2024/Elect(TRS)/412/1 | Electric Loco Holding Target for the Month of May’ 2024 | 01/05/2024 |
| 2023/Elect(TRS)/412/1 | Electric Loco Holding Target for April’ 2024 | 02/04/2024 |
| 2005/Elect(TRS)/440/23 | Summer and Monsoon preparedness- Electric & Diesel Locomotives. | 05/03/2024 |
| 2023/Elect(TRS)/412/1 | Electric Loco Holding Target for March’ 2024 | 04/03/2024 |
| 2024/Elect(TRS)/113/1 (Misc) | Functioning of VCD and its isolation on locos. | 20/02/2024 |
| 2006/Elect(TRS)/462/1 | Provision of Real-time Train Information System (RTIS) on Electric Locomotives. | 08/02/2024 |
| 2023/Elect(TRS)/440/11 | Competition of loco cab improvement of Electric locomotives. | 07/02/2024 |
| 2023/Elect(TRS)/412/1 | Electric Loco Holding Target for Feb. 2024 | 02/02/2024 |
| 2024/Elect(TRS)/440/2 | Use of Fog Safe Device throughout the year. | 17/01/2024 |
| 2023/Elect(TRS)/412/1 | Electric Loco Holding Target for January’2024 | 03/01/2024 |
| 2023 | ||
| Rolling down of locomotives/train. | 21/12/2023 | |
| 2023/Elect(TRS)/412/1 | Electric Loco holding Target for the Month of Dec. 2023. | 04/12/2023 |
| 2023/Elect(TRS)/440/6 | Provision of Railway Driver Assistance System (RDAS) in WAG9H & WAP-7 Locomotives. | 03/11/2023 |
| 2023/Elect(TRS)/412/1 | Electric Loco holding target for the month of Nov. 2023 | 03/11/2023 |
| 2007/Elect(TRS)/440/14 (Co-Driver) | Review of Co-Loco Pilot for High Speed Trains. | 31/10/2023 |
| 2023/Elect(TRS)/441/1 | Provision of CVVRS on Locomotives over Indian Railways | 23/10/2023 |
| 2007/Elect(TRS)/225/7 (Neutral section) | Inspection of Machine Room/HT compartment by ALP/Co-LP. | 12/10/2023 |
| 2005/Elect(TRS)/440/23 | Winter preparedness drive. | 10/10/2023 |
| 2023/Elect(TRS)/412/1 | Electric Loco holding target for the month of June, 2023 | 05/10/2023 |
| 2023/Elect(TRS)/440/11 | Competition of loco cab up-gradation on Electric locomotives. | 21/09/2023 |
| 2023/Elect(TRS)/412/1 | Electric Loco Holding Target for Sept 2023 | 05/09/2023 |
| 2023/Elect(TRS)/113/Misc. Safety | Examination of issues related to use of medicines and the effect on running staff. | 31/08/2023 |
| 2015/Elect(TRS)/440/4 Pt. | Manufacture of WAG9H Multi -Unit with Gangway arrangement | 29/08/2023 |
| 2009/Elect(TRS)/441/6 | Upgradation of specification of Crew Voice and Video Recording System (CVVRS) with RDAS as an add-on | 24/08/2023 |
| 2023/Elect(TRS)/441/8 Pt. | Harmonic filter action plan for 3 Phase Electric Locomotives. | 14/08/2023 |
| 2023/Elect(TRS)/441/1 | Augmentation/Provisioning of new facilities for LPs/ALPs over IR in Supplementary Budget-2023-24 | 14/08/2023 |
| 2000/Elect(TRS)/440/18/15/Pt. 3/1 | Maintenance of Cab ACs on electric locos | 14/08/2023 |
| 2023/Elect(TRS)/412/1 | Electric Loco holding target for the Month of August'2023 | 04/08/2023 |
| 2023/Elect(TRS)/440/6 | Provision of Railway Driver Assistant System (RDAS) in WAG9H & WAP7 locomotives. | 02/08/2023 |
| 2019/Elect(TRS)/440/6 Line Box | Reduction in number of tools to be carried by Loco Pilots in line box/trolley bags | 19/07/2023 |
| 2023/Elect(TRS)/440/1 (CCTV) | Requirement analysis for CCTV over Indian Railways | 14/07/2023 |
| 2023/Elect(TRS)/412/1 | Electric Loco holding target for the month of July'2023 | 04/07/2023 |
| 2017/Elect(TRS)/480/1 | Release of overdue WAG12B Locomotives for Scheduled Maintenance at Company Depots of MELPL | 03/07/2023 |
| 2023/Elect(TRS)/440/8 (VCD) | Sealing of VCD isolation rotary switch on locomotives. | 28/06/2023 |
| 2023/Elect(TRS)/440/8 (Sander) | Proper working of eight sanders on locomotives | 27/06/2023 |
| 2022/Elect(TRS)/138/3 | Decision on item of 40th MSG (Electric Loco) - On run BP pressure drop at emergency rate due to activation of accelerator Valve/FIBA of LHB Coach | 16/06/2023 |
| 2023/Elect(TRS)/225/1 (Yoga) | Mandatory Yoga Training for all officers/Staff of Indian Railways | 14/06/2023 |
| 2006/Elect(TRS)/462/1 | Provision of Real-time train System (RTIS) on electric & Diesel Locomotives. | 08/06/2023 |
| 2023/Elect(TRS)/412/1 | Electric Loco holding target for the month of June, 2023 | 05/06/2023 |
| 2022/Elect(TRS)/412/1 | Electric Loco holding target for the month of May, 2023 | 04/05/2023 |
| 2005/Elect(TRS)/440/23 | Summer and Monsoon preparedness | 12/05/2023 |
| 2002/Elect(TRS)/440/18/9 Pt | wheel disc crack in electric locomotives. | 17.04.2023 |
| 2022/Elect(TRS)/225/1 (NFIR) | rovision of seat for inspecting official in electric loco cab. | 12.04.2023 |
| 2022/Elect(TRS)/412/1 | Electric Loco holding target for April 2023 | 05.04.2023 |
| 2022/Elect(TRS)/113/1(Safety Misc) | Footplate with nominated Loco Pilots | 28.03.2023 |
| 2022/Elect(TRS)/113/1(Safety Misc) | Prevention of SPAD incidences | 28.03.2023 |
| 2023/Elect(TRS)/138/1 (Bd. Mtg.-maint) | Super-checks by senior supervisor and officers of maintenance work carreied out by junior staff. | 28.03.2023 |
| 97/Elect(TRS)/113/4 Pt. | Rolling Stock Production- Inventory control and management. | 24.03.2023 |
| 2006/Elect(TRS)/462/1 | Assistance required from Railways for operation & Maintenance (O&M) of RTIS Loco devices installed in electric locos. | 22.03.2023 |
| 2022/Elect(TRS)/412/1 | Electric Loco holding target for March 2023 | 03.03.2023 |
| 2012/Elect(TRS)/113/7 | Timely communication of accidents/unusual occurrence. | 28.02.2023 |
| 2015/Elect(TRS)/440/4 | Increasing the Axle load of WAG-9 H Locomotives | 08.02.2023 |
| 2022/Elect(TRS)/412/1 | Electric Loco holding target for the month of February 2023 | 03.02.2023 |
| 2022/Elect(TRS)/113/1 (Safety Misc) | Procedure for brake application by Loco Pilots | 02.02.2023 |
| 2013/Elect(TRS)/441/5 | Provision of Waterless Urinal in WAG-9 Freight Electric Locomotives | 27.01.2023 |
| 2022/Elect(TRS)/138/5 | Record Note of discussion of Principal Chief Electrical Engineers Conference held on 3rd Jan. 2023 | 17.01.2023 |
| 2022/Elect(TRS)/113/Safety Misc | Side Collision of 11139 DN (CSTM-Gadag Express) with 11005 Dn (Dadar-Pondicherry) on CSTM Division of CR on 15.04.2022 | 05.01.2023 |
| 2022/Elect(TRS)/412/1 | Electric Loco holding target for the month of January 2023 | 04.01.2023 |
| 2008/Elect(TRS)/440/23 (dsl to elec) | Taking over of trains on electric traction subsequent to electrification. | 04.01.2023 |
| 2022 | ||
| 2022/Elect(TRS)/412/1 | Electric Loco holding target for the month of December 2022 | 05.12.2022 |
| 2022/Elect(TRS)/113/4 | Derailment of Goods train no. N/NTPB UP at Km. 841/37 on Joint Line (3rd Line) between Venkatnagar and Nigaura Stations on Bilaspur-Shahdol section of Bilaspur Division of SECR on 09.07.2021 | 23.11.2022 |
| 2006/Elect(TRS)/462/1 | Real- time train information system (RTIS) Phase-2 Rollout. | 21.11.2022 |
| 2019/Elect(TRS)/225/2(T-18) | Operation of Vande-Bharat Train. | 18.11.2022 |
| 2022/Elect(TRS)/412/1 | Electric Loco holding target for the month of November 2022 | 04.11.2022 |
| 2005/Elect(TRS)/440/23 | Winter preparedness drive. | 17.10.2022 |
| 2022/Elect(TRS)/113/ Safety Misc. | Implementation of decisions taken during safety Review Meeting. | 17.10.2022 |
| 2022/Elect(TRS)/ 412/1 | Elect. Loco holding target for the month of Oct.2022 | 04.10.2022 |
| 2022/Elect(TRS)/ 225/1 (vig.) | Banning of business dealing with the firm M/S Pawan Kumar Sharma for a period of 05 years | 20.09.2022 |
| 2008/Elect(TRS)/440/23 Pt. | Surplus diesel locos to be placed under good repair stored. (GRC) | 20.09.2022 |
| 2022/Elect(TRS)/113/1/Safety Misc | Actionable points to be mitigate the SPAD incidences. | 14.09.2022 |
| 2022/Elect(TRS)/113/1 Safety Misc | Safety and reliability of trains operation | 14.09.2022 |
| 2022/Elect(TRS)/412/1 | Electric Loco Holding target for sept. 2022 | 05.09.2022 |
|
|
Implementation of System for Lcoc Asset Management (SLAP) Rollout in Elect (Loco Shed) Trip Sheds and TLCs
|
30.08.2022 |
|
|
Failure of Locos component during July' 2022 (Translation in Hindi)
|
29.08.2022 |
|
|
Requirement of Elect Loco simulators in view of 3000 MT loading by 2026-27 | 24.08.2022 |
|
Requirement of Diesel Locomotives for freight and passengers service with progressive electrification.
|
12.08.2022 | |
|
|
Control over expenditure under Revenue Demand over IR | 10.08.2022 |
|
|
Training of maintenance and operating staff at Centre for excellence developed at Elect Loco shed, Rourkela, SER | 02.08.2022 |
| Electric Loco holding Target for August 2022 | 04.08.2022 | |
|
|
Provision of Attacking speed board before graded section | 26.07.2022 |
|
|
Review of Co-drivers (Co-Loco Pilot) for High Speed Trains | 26.07.2022 |
|
|
Precaution to prevent unusual incidences due to cattle run-over - provision of GR 4.40 | 21.07.2022 |
| Elect. Loco holding Target for July'2022 | 04.07.2022 | |
| 2022/Elect(TRS)/412/1 | Component failure of Elect Locos during May'2022 | 22.06.2022 |
| Implementation of the Report of Multi disciplinary committee on Mission 3000 MT by Year 2027 availability of Locos | 01.06.2022 | |
| Increasing efficiency of Indian Railways Locomotives maintenance and operations regarding Trip schedule | 12.05.2022 | |
| Signal Passing of Danger (SPAD) | 04.05.2022 | |
| 2022/Elect(TRS)/412/1 | Electric Loco Holding target for May 2022 | 04.05.2022 |
| 2015/Elect(TRS)/440/5 Pt. | Action to be taken for improving Electric Locomotive equipment reliability & warranty compliance | 26.04.2022 |
| 2022/Elect(TRS)/113/1 (Safety Misc.) | Maintenance of assets to achieve ’Zero Defects’ | 18.04.2022 |
| 2022/Elect(TRS)/113/1 (Safety Misc.) | Action to be taken for prevention of SPAD | 18.04.2022 |
| 2022/Elect(TRS)/412/1 | Electric Loco Holding target for April 2022 | 04.04.2022 |
| 2022/Elect(TRS)/440/1 (Maint.) | Maintenance of electric locos in newly converted diesel loco sheds | 22.03.2022 |
| 2000/Elect(TRS)/440/6 Pt. II | Deployment of WDG 4 diesel locomotives in multiple unit formation | 17.03.2022 |
| 2005/Elect(TRS)/440/23 | Summer and Monsoon preparedness | 14.03.2022 |
| 2005/Elect(TRS)/440/10 Pt. II | Dedicated HOG Compliant (WAP-7/WAP-5) Locomotives to be provided for each HOG rakes | 04.03.2022 |
| 2002/Elect(TRS)/440/18/9 Pt. | Axle Lock failure in Loco no. 32290/WAG9 of NKG/WCR | 03.03.2022 |
| 2022/Elect(TRS)/412/1 | Electric Loco Holding target for March 2022 | 03.03.2022 |
| 2022/Elect(TRS)/412/1 | Electric Loco Holding target for February 2022 | 03.02.2022 |
| 2022/Elect(TRS)/113/1/Misc.(Safety) | Safety & Reliability of Train operation | 20.01.2022 |
| 2022/Elect(TRS)/412/1 | Electric Loco Holding Target for January 2022 | 04.01.2022 |
| 2021 | ||
| 2018/Elect.(TRS)/412/1 | Electric Loco Holding for the month of Dec. 2021 | 01.12.2021 |
| 2005/Elect.(TRS)/440/23 | Winter Preparedness drive | 05.11.2021 |
| 2018/Elect.(TRS)/412/1 | Electric Loco Holding Sept.' 2021 | 03.09.2021 |
| 2018/Elect.(TRS)/412/1 | Electric Loco Holding August 2021 | 04.08.2021 |
| 2018/Elect.(TRS)/412/1 | Electric Loco Holding for the month of October 2021 | 01.08.2021 |
| Grievances received through CPGRAM | 20.07.2021 | |
| Electric Loco Holding July 2021 | 02.07.2021 | |
| 2021/Elect.(TRS)/462/1 | Funds constraint in ECR under Revenue | 15.06.2021 |
| 2018/Elect.(TRS)/412/1 |
Electric Loco Holding June 2021
|
02.06.2021 |
| 2021/Elect.(TRS)/480/1 | Works kept in Abeyance | 02.06.2021 |
| 2020 | ||
| 2007/Elect(TRS)/440/14 (Co-Driver) | Review of Co-Drivers (Co-Loco Pilot) for High Speed Trains | 24.11.2020 |
| 2020/Elect.(TRS)/225/1 (Sys. Imp) | System Improvement for claiming a firm to be an authorized agent of an approved supplier submit tender specific authorization letter. | 20.11.2020 |
| 2020/Elect.(TRS)/138/1 (MR) | Mid Year Review of Zonal Railways by Hon'ble MR | 07.10.2020 |
| 2007/Elect(TRS)/440/14 Pt. | Condemnation of over-aged electric locomotives | 29.09.2020 |
| 2020/Elect.(TRS)/225/1 (loco ins.) |
Increasing efficiency of Indian Railways : Locomotives' maintenance & operations regarding Trip Schedules |
18.09.2020 |
| 2007/Elect(TRS)/440/15Pt./PP-timetable | Monitoring of Push Pull trials of Rajdhani trains with 22 LHB coaches | 01.09.2020 |
| 2008/Elect.(TRS)/440/23 | Running of Diesel under wire | 24.08.2020 |
| 2005/Elect(TRS)/440/23 | Winter preparedness drive. | 22.08.2020 |
| 2020/Elect(TRS)/225/1 (maint. staff) |
Analysis of provision of maintenance staff vis-à-vis maintenance workload for various departments on Indian Railway. |
14.08.2020 |
| 2020/Elect.(TRS)/225/1 (E&R pred maint) | Predictive system with data acquisition, diagnostics and remote monitoring facility for all assets on Indian Railways | 05.08.2020 |
| 2020/Elect.(TRS)/225/1 (Sys. Imp) | System Improvement for manpower based contracts | 12.06.2020 |
| 2020/Elect.(TRS)/225/1 (VC) | Action Plan to control Expenditure | 10.06.2020 |
| 2018/Elect.(TRS)/113/1/safety | Measures to be adopted to prevent trespassing on Railway tracks | 08.05.2020 |
| 2018/Elect.(TRS)/441/3 | RE 2019-20 for Demand No.82 | 03.02.2020 |
| 2002/Elect.(TRS)/122/2 | Movement of defective locos over Zonal Railways | 22.01.2020 |
| 2019/Elect.(TRS)/113/Safety Misc. | Prevention of SPAD incidences | 17.01.2020 |
| 2019 | ||
| 2018/Elect{TRS)/412/2 | Availability of Electric locomotives - actual outage vis-à-vis target | 13.12.2019 |
| 2019/Elect(TRS)/113/Safety Misc. | Prevention of SPAD incidences | 14.11.2019 |
| 2007/Elect(TRS)/440/15 Pt. | Operation of trains in Push-pull mode | 11.11.2019 |
| 2007/Elect(TRS)/440/15 Pt. | Wiring of trains for Push-pull operation | 31.10.2019 |
| 2005/Elect(TRS)/440/23 | Winter preparedness drive | 11.10.2019 |
| 2007/Elect(TRS)/440/14 Pt. | Filling up of sand as per specification no. AAR M-916-51 and proper functioning of sanders of electric & Diesel locomotives | 02.09.2019 |
| 2016/Elect(TRS)/113/Safety Misc. |
Prevention of accidents and SPAD incidences - modification regarding continues night duty for running staff |
13.08.2019 |
| 2003/Elect(TRS)/440/4 | Generate Non-Fare-Revenue through branding of Locomotive | 09.07.2019 |
| 2007/Elect.(TRS)/440/15 Pt. | Reliable scheme for operation of trains in Push-pull mode | 09.05.2019 |
| 2000/Elect(TRS)/441/11 Pt-II |
Distribution of sanctioned Umbrella work under Plan Head-41 against Pink Book 2018-19 item 1177 of NR "Simulation, equipment and application for Crew" - Three Phase electric loco simulators |
30.04.2019 |
| 2005/Elect(TRS)/440/23 | Summer and Monsoon preparedness | 13.03.2019 |
| 2018 | ||
| 2005/Elect(TRS)/440/18/4 (Hotel Load) | Measures to be taken for reduction of Diesel consumption – Head on Generation (HOG)n & Regenerative braking failure of locomotives | 17.12.2018 |
| 2016/Elect(TRS)/138/17 | Posting of Junior Scale electrical officers in diesel loco sheds homing electric locomotives | 27.11.2018 |
| 97/Elect(TRS)/113/4 Pt | Uploading of details of the firms banned/suspended for business dealings with the Government Departments | 16.07.2018 |
| 2005/Elect.(TRS)/440/23 | Summer and Monsoon preparedness | 21.03.2018 |
| 2016/Elect(TRS)/440/1 Pt. IV | Orientation programme for Mechanical officers at IRIEEN | 16.02.2018 |
| 2000/Elect(TRS)/440/23 Pt. I | Initiatives for making Diesel loco operation free Delhi region - homing of electric locomotives in Diesel shed, Tugalakabad & Ludhiana | 25.01.2018 |
| 2008/Elect(TRS)/440/23 Pt. I | Action plan to mitigate Diesel loco operation from Delhi area | 08.01.2018 |
| 2017 | ||
| 2017/Elect(TRS)/113/4 Pt | Provision of retro-reflective Sigma boards in Electrified and Non-electrified territories | 20.12.2017 |
| 2007/Elect(TRS)/412/2 | Training of loco pilots about the regeneration of traction energy | 01.12.2017 |
| 2017/Elect(TRS)/113/Safety Misc. | Rolling down of stabled electric locomotive at WADI station of Solapur division of Central Railway on 08.11.2017 | 13.11.2017 |
| 2017/Elect(TRS)/138/17 Pt. I | Phase wise homing of Electric locomotives in Diesel sheds | 23.10.2017 |
| 2016/Elect.(TRS)/138/17 | Maintenance of Electric Locomotive in Diesel Sheds | 28.09.2017 |
| 2004/Elect(TRS)/412/6 Pt. I |
Correct accountal of GTKMs and use of regenerative brakes on three phase electric locomotives |
21.08.2017 |
| 2016/Elect(TRS)/113/Safety Misc | Attention towards restrictive aspect of signals | 21.07.2017 |
| 2016 | ||
| 2016/Elect(TRS)/113/Safety (Misc.) | Safety drive from 29.12.2016 to 05.01.2017 as directed by Hon’ble MR in the Video Conference with General Managers on 29.12.2016 | 29.12.2016 |
| 2008/Elect(TRS)/113/5 Pt. | Special drive for fire prevention on electric locomotives | 08.12.2016 |
| 2016/Elect(TRS)/113/Safety Misc | Special Safety Drive for awareness among the running staff for sounding of loco whistle according to G&SR | 24.11.2016 |
| 2016/Elect(TRS)/113/Safety Misc. |
Special Safety Drive to check efficacy and preparedness of Railway Systems |
22.11.2016 |
| 92/Elect(TRS)/138/5 Pt. III | Trip inspection of passenger electric locomotives | 26.09.2016 |
| 2016/Elect.(TRS)/440/2 | Painting National Flag on electric locomotives | 05.08.2016 |
| 2006/Elect(TRS)/440/7 (3-Phase) | Availability of necessary material in ARTs required for lifting of three phase electric loco wheel in locked condition | 19.05.2016 |
| 2015/Elect(TRS)/412/1 | Equipment reliability of electric locomotives during FY 2015-16 | 12.05.2016 |
| 2016/Elect(TRS)/113/Misc. Safety | Special drive to improve safety – preparedness of Railway system | 06.05.2016 |
| 2016/Elect(TRS)/113/Misc. Safety | Minutes of the meeting held on 27.04.2016 in Railway Board on Signal Passing At Danger (SPAD) incidences by Electric Loco Pilots | 04.05.2016 |
| 2012/Elect.(TRS)/113/7 | Timely communication of accidents/unusual occurrence | 12.01.2016 |
| 2015 | ||
| 2005/Elect(TRS)/440/18/4 3ph | Allotment of Hotel Load Converter fitted WAP7 Electric Locomotives | 02.11.2015 |
| 2015/Elect (TRS)/155/1 Pt.V | Allotment of punctuality performance of Electric locomotives on Territorial & Ownership basis during 2nd Quarter(July – September) of 2015-16 | 23.10.2015 |
| 2015/Elect.(TRS)/225/1 Misc. | Training in igh Speed Rail (HSR) Technology & Operations and Speed raising at SWJTU, China | 28.09.2015 |
| 2014/Elect(TRS)/113/5 Misc. Safety | Special Safety Drive to check efficacy and preparedness of
Railway Systems. |
22.09.2015 |
| 2014/Elect.(TRS)/225/14 Pt. | Filling up of vacancy of maintenance staff in Electric Loco Sheds. | 19.09.2015 |
| 2015/Elect (TRS)/155/1 Pt. V | Allotment of punctuality performance of Electric locomotives on territorial & ownership basis during 1st Quarter(Apr – June) of 2015-16 | 15.07.2015 |
| 2005/Elect.(TRS)/480/2 Pt. VI | Manpower planning norms for three-phase electric locos in Electric
Loco Sheds |
02.06.2015 |
| 2015/Elect.(TRS)/285/1 | Status of Pronouncements in Hon’ble MR’s Budget speech for 2015-16 | 21.04.2015 |
| 2014 | ||
| 2014/Elect.(TRS)/113/5 Misc. Safety | Special safety drive to check efficacy and preparedness of railway systems. | 28.05.2014 |
| 2008/Elect(TRS)/441/5 | Revised norms for Unit Exchange spares for maintenance of AC conventional electric locos | 13.05.2014 |
| 2007/Eect.(TRS)/441/8 Pt. | Maintenance Instructions to prevent crack/breakage of TM mounting bogie nose in WAP7/WAG9 locomotives | 07.05.2014 |
| 2007/Elect(TRS)/440/14 | Mail / Express trains run by Goods Loco Pilots in emergency | 07.04.2014 |
| 2013/Elect(TRS)/155/1 | Monitoring of Trip inspection on Electric Locomotives | 26.02.2014 |
| 2008/Elect(TRS)/440/23 | Preparedness for taking over of trains on electric traction | 20.02.2014 |
| 2013 | ||
| 2013/Elect(TRS)/441/1 | Revised allotment of spares for three phase electric locos | 01.05.2013 |
| 2012/Elect(TRS)/225/4 Pt. | Running Shield for 'Best Zone - Electrical Department' | 23.04.2013 |
| 2012/Elect(TRS)/440/1 | Electric Loco Coupling failure in 2012-13 | 10.04.2013 |
| EL/1.2.9.1 | Reliability improvement of 180 kVA SIV | 05.04.2013 |
| 2013/RE/225/1/FTS-69915 | Proposals for creation and extension of Gazetted posts of Electrical cadre on Indian Railways | 25.02.2013 |
| 2012/Elect(TRS)138/8 | Revised allotment of POH/MTR capacity for 2013-14 for electric locos | 20.02.2013 |
| 2005/Elect(TRS)/440/23 | Summer and Monsoon preparedness | 12.02.2013 |
| 92/Elect(TRS)/138/5 Pt. III | Trip inspection of WAG-9 locos at Trip Sheds | 31.01.2013 |
| 2008/Elect(TRS)/113/5 Pt. | Fire prevention measures on Three phase electric locomotives | 31.01.2013 |
| CAO/FOIS/84/Loco/2013 | Changes in FOIS for reporting of loco schedule for electric locos in FOIS | 30.01.2013 |
| 2008/Elect(TRS)/440/22 | Tentative allotment of electric locomotives for 2013-14 | 21.01.2013 |
| 2012/Elect(TRS)/113/4 | Incidence of Signal Passing at Danger (SPAD) | 02.01.2013 |
| 2012 | ||
| 2012/Elect(TRS)/225/13 Misc. | Reporting of failures of OFF POH & newly built electric locos through 'eLocoS' website) | 28.12.2012 |
| 2010/Tele/2(1)/1/Pt. | JPO for use of CUG/Mobile Phones by Loco Pilots/Asstt. Loco Pilots/Motormen and Guards ) | 27.12.2012 |
| EL/8.4.17 | Guidelines for Standardization of Speed Boards to be placed on OHE Masts | 27.12.2012 |
| MC/BLB/CBC | Joint Procedure Order for Coupling / Uncoupling of transition type Centre Buffer Coupler with rake | 20.12.2012 |
| 2012/Elect(TRS)/138/8 | Allotment of POH/MTR and TM Rewinding capacity for 2013-14 for Electric locos) | 17.12.2012 |
| 2003/Elect(TRS)/441/3 Vol.-I Pt.-I | Proper functioning of Vigilance Control Device (VCD) on electric locos | 13.12.2012 |
| 2007/Elect(TRS)/440/23 Pt. | Crew Management System (CMS) - Issues & Use cases Specification Running Allowance version 1.16 | 11.12.2012 |
| 2011/Elect(TRS)/480/1 Pt. | Homing Capacity of Electric Loco sheds up to 200 locos | 11.12.2012 |
| 2012/Elect(TRS)/225/13 Misc. Pt. I | Web based facility for Unusual Occurrence Report (UOR) of Electric Locomotive on Railnet | 07.12.2012 |
| 2001/M(L)/467/2 | Rationalization of supervision of Loco Running Staff. | 12.11.2012 |
| EL/2.5.2/2 | Optimizing specific energy consumption for Electric Traction and reducing the electricity bills. | 12.11.2012 |
| 2012/Elect(TRS)/113/4 | Indicative Accident cases (under Category " Reporting to Rlys") on Electrical Account. | 08.11.2012 |
| 2009/Elect(TRS)/113/2 | Prohibition of use of mobile phones while on train by Loco Pilots/Guards | 07.11.2012 |
| 2002/Elect(TRS)/122/2 | Movement of defective locomotives over Zonal Railways | 07.11.2012 |
| 2012/Elect(TRS)/412/1 | Equipment reliability of locos during 2nd Quarter (July-Sept.) of 2012-13 | 01.11.2012 |
| 2012/M(L)/466/2(2701) | Relaxation of wheel diameter for WAP-7 & WAG-9 electric locos | 31.10.2012 |
| 2003/Elect(TRS)/440/17 Pt. | Formation of JPO for freight train operation on stalling prone area - Modifications to WTT | 29.10.2012 |
| 2007/Elect(TRS)/440/23 Pt. | Implementation of Crew Management System (CMS) | 23.10.2012 |
| CMS Ver. 3.9.0 | Release of new CMS version 3.9.0 | 23.10.2012 |
| Runniung Allowance Ver. 1.16 | CMS issues & Use case Specification - Running allowance version 1.16 | 23.10.2012 |
| 2012/Elect(TRS)/113/4 | Analysis & reporting of indicative accident cases | 22.10.2012 |
| 2012/Elect(TRS)/441/1 | Sparing of material by CLW to Zonal Railways against various sanctioned RSPs with Annex. | 12.10.2012 |
| 2005/Elect(TRS)/440/23 |
Winter preparedness drive. | 27.09.2012 |
| 2009/Elect.(TRS)/113/2 |
Minutes of meeting held on 14.09.2012 in Railway Board, New Delhi on safety and operational issues. | 24.09.2012 |
| 2003/Elect.(TRS)/225/7 Pt. |
Improvement of Running Rooms. | 17.09.2012 |
| TPWS LETTERS | Important letters & information regarding Train Protection Warning System (TPWS) | -- |
| 2012/Elect.(TRS)/412/1 | Commissioning of new electric locomotives | 03.09.2012 |
| 2007/Elect(TRS)/440/23 | Homing Capacity of Electric Loco sheds | 03.09.2012 |
| 2002/Tele/WCM/6/Genl./Pt | Policy on payment of spectrum charges to Ministry of Communication (Telecom Circular no. 9/2012) | 28.08.2012 |
| 2009/Elect(TRS)/113/2 | Periodical meetings of Sr.DEE(TRO)s to discuss Safety, Crew and inter-Railway Operational issues | 28.08.2012 |
| 2008/Elect(TRS)/440/23 | Tentative electric loco coaching link for trains announced in Budget 2012-13 | 05.07.2012 |
| 2007/Elect(TRS)/440/8 | Counseling of running staff to avoid online failure on account of SIV | 04.07.2012 |
| 2009/Elect(TRS)/720/1 | Review of status and redistribution of TAOchi conversion works allotment of sanctions against different Board RSPs. | 15.06.2012 |
| 2012/Elect(TRS)/113/2 | MOM - regarding SPAD cases held on 07.05.2012 in Railway Board | 15.05.2012 |
| 2012/Elect(TRS)113/7 | Timely communication of accidents / unusual occurrence | 02.05.2012 |
| 2011/Elect(TRS)/113/4 | Action Plan to reduce SPAD cases | 20.04.2012 |
| EL/3.1.35/2 Electrical | Revision '2' of Trouble Shooting Directory of 3-Phase electric locomotives | 04.04.2012 |
| 2010/M(L)/466/2(2701) | Relaxation of Wheel diameter for WAP7 & WAG9 electric locos | 04.04.2012 |
| EL/3.6.1/1 | Revision in AOH periodicity of WAP-4 class of electric locos equipped with Hitachi TMs | 28.03.2012 |
| EL/4.2.15 | MOM Performance Review Meeting of MPCS held at Railway Board on 07.02.12 | 21.02.2012 |
| EL/11.5.5/5 | MOM held at ELS/GZB on 09.02.2012 to review reliability of Electronics of three phase electric locos | 15.02.2012 |
| EL/1.2.9.1 | MOM Performance Review Meeting of SIV held at Railway Board on 07.02.12 | 13.02.2012 |
| 2011/Elect(TRS)/138/9 | Dispatching of Electric locos from CLW and POH Workshop | 10.02.2012 |
| EL/3.2.19(G) | Compressor efficiency and pneumatic testing procedure on conventional and three phase electric locos | 09.02.2012 |
| EL/1.2.9.1 (AAL) | Replacement of cooling fan bearing of 180kVA SIV of M/s AAL | 03.02.2012 |
| EL/1.2.9.1 | Implementation of Standardization Scheme in M/s Hind Rectifier make 180 kVA SIV | 02.02.2012 |
| 2008/Elect(TRS)/440/23 | Missing coaching electric loco links | 24.01.2012 |
| EL/3.1.35/2 (3-Ph) | Revision of root wear limit on WAP-7 locomotives | 06.01.2012 |
| 2011/Elect(TRS)/138/9 | Allotment of POH/MTR and TM rewinding Capacity 2012-13 for electric locos | 02.01.2012 |
| 2011 | ||
| EL/3.2.108 (3-Phase) | Reliability of axle box bearing for WAG9/WAP7 | 21.12.2011 |
| 2011/Elect(TRS)/440/2 | Inclusion of D&G charges in the RSP proposals | 26.12.2011 |
| Miscellaneous | Tips for better Engineman-ship for Loco Pilots | 04.10.2011 |
| 2007/Elect(TRS)/440/7 | Formulation of JPOs for freight train operation with Traffic department | 08.06.2011 |
| EL/3.6.1 | Review of periodicity of maintenance schedule of electric locos | 25.04.2011 |
| 2010 | ||
| 2007/Elect(TRS)/441/6 | Opening of brazed terminals of Battery charger ammeter shunt | 19.11.2010 |
| 2007/Elect(TRS)225/10 Misc. | Brake feel & Continuity tests on trains by Loco Pilots | 09.11.2010 |
| 2008/Elect(TRS)/113/2 (Fog Safe) | Use of GPS based Fogsafe device on Electric locos / EMUs | 01.11.2010 |
| 2002/Elect(TRS)/440/18/9 Pt. |
Horizontal keeper pin for retaining vertical pin of nose suspension mounting for Traction Motors |
25.10.2010 |
| 2009/Elect(TRS)113/2 | Use of Mobile Phone during train run | 13.10.2010 |
| 2009/Elect(TRS)/113/2 | Incidences of Signal over-shooting by Loco Pilots (LPs) | 08.10.2010 |
| 2005/Elect(TRS)/440/23 | Rain water protection and working of wiper and sanders on electric locos | 21.09.2010 |
| 2005/Elect(TRS)/440/23 | Winter preparedness drive | 20.09.2010 |
| 2007/Elect(TRS)/412/2 (SEC) | Expenditure on energy/Fuel consumption on electric/diesel traction | 20.09.2010 |
| 2003/Elect(TRS)/225/7 Pt. | Monitoring of duty hours of Running staff on run | 14.09.2010 |
| 2007/Elect(TRS)/412/2 Pt. (SEC) | Specific energy consumption (SEC) on electric traction on Zonal Railways | 13.09.2010 |
| 2009/Elect(TRS)/412/1 | Electric Loco Holding and Targets for Sep?2010 |
08.09.2010
|
| 2007/Elect(TRS)/441/21 3-Ph Pt. | Failure of brake hanger of WAP-7 electric locos | 31.08.2010 |
| NIL | Equipment failure for the month of June2010 | 05.08.2010 |
| 2009/Elect(TRS)/412/1 | Electric Loco Holding & Targets as on 01.08.10 | 03.08.2010 |
| 2010/Elect(TRS)/138/2 | Minutes of the Chief Electric Engineers? Conference | 02.08.2010 |
| -- | Punctuality loss detail for the month of June 2010 | 19.07.2010 |
| -- | 19.07.2010 | |
| -- | Equipment failures for the month of May 2010 | 07.07.2010 |
| -- | Punctuality loss analysis for the month May 2010 | 07.07.2010 |
| -- | Punctuality loss detail for the month of May 2010 | 07.07.2010 |
| 2009/Elect(TRS)/412/1 | Electric Loco Holding & Targets as on 01.07.10 | 02.07.2010 |
| 2009/ Elect(TRS)/441/4 | Assembly of new electric locos in Workshops | 21.06.2010 |
| 2004/Elect(TRS)/440/19 | TPWS on electric locos - installation and maintenance | 09.06.2010 |
| 2008/Elect(TRS)/113/5 Pt. | Fire incidences on electric locos - maintenance drive | 07.06.2010 |
| 2009/Elect(TRS)/412/1 | Electric Loco Holding & Targets as on 01.06.10 | 02.06.2010 |
| -- | Punctuality loss cases April 2010 | 15.05.2010 |
| RDSO EL/3.2.30 |
Standardization of maintenance kits & rehabilitation/reconditioning Policy for N-32 tap changer used on conventional electric locos |
12.05.2010 |
| 2007/Elect(TRS)/441/10 |
Up-gradation/modification of single bottle VCBs type BVAC 25.10 (Older version) and BVAC 25.10 M07 (Old)of Secheron design supplied by M/s BT to VCBs type BVAC 25.10. M07 (New) |
03.05.2010 |
| 2009/Elect(TRS)/412/1 | Electric Loco Holding Target for May 2010 | 04.05.2010 |
| 2009/Safety(A&R)/19/29 | Use of Walkie-Talkie sets | 10.03.2010 |
| Nil | Punctuality analysis for the month Mar?10 | Mar'2010 |
| Nil | Equipment failures for the month Mar`10 | Mar'2010 |
| 2007/Elect(TRS)/440/17 | Condemnation of overaged electric locos | 19.04.2010 |
| 2009/Elect.(TRS)/441/3 | Procurement of 1000 Nos. Vigilance Control Device Sactioned in Supplementary Budget 2009-10 | 12.04.2010 |
| 2003/Elect(TRS)/440/1 Pt. | Integrity of BP & FP circuit on electric locomotives | 05.04.2010 |
| 2005/Elect(TRS)/440/23 | Summer and Monsoon preparedness | 04.03.2010 |
| Nil | Comparative Equipment Failure E&R Jan-2010 | 01.03.2010 |
| Nil | Punctuality loss analysis for Jan-2010 | 01.03.2010 |
| 2010/Elect(TRS)/138/2 | Minutes of CELEs? conference held at ELS/BZA, SCR on 22.01.2010 | 22.02.2010 |
| 2006/C&IS/WP 2007-08/DSS/18 |
Transfer of the Work of ?Central Railway ? Decision Support System for electric loco maintenance and operational management? PB Item no. 39 of 2009-10 from Central Railway to Northern Railway |
15.01.2010 |
| No.2009/Elec(TRS)/412/1 | Electric Loco Holding target for Martch - 2010 | 04.03.2010 |
| 97/Elect(TRS)/440/18/44(3-ph) Pt. | Failures of traction housing and link flange /bolts in 3 phase locos | 18.01.2010 |
| 98/Safety(A&R)/19/16 | Precautions for the Safety of Passengers in Rear SLR during fog | 16.01.2010 |
| 2006/Elect(TRS)/441/11 Pt. | Healthiness of VHF sets given to loco pilots and guards | 14.01.2010 |
| EL/3.6.1/3 | Sources for repair/rehabilitation/overhauling of major equipment of electric locomotives | 08.01.2010 |
| 2009/Elect(TRS)/441/3 | Transfer f HS15250 A TM armatures and stators | 07.01.2010 |
| 2002/Elect(TRS)/113/13 | Extraction of data from ESMON at the time of accidents | 05.01.2010 |
| 2009 | ||
| 2009/M(L)/466/2 (19) Policy | Policy in regard to premature condemnation of locomotives damaged in accidents. | 23.12.2009 |
| 2009/Elect(TRS)/138/10 | Allotment of POH/MTR and TM rewinding capacity for 2010-11 for electric locomotives. | 29.12.2009 |
| Punctuality details for the month of December 2009 | Dec'2009 | |
| 98/Safety(A&R)/19/16 | Precautions for Train operation during Fog | 07.12.2010 |
| 2007/Elect(TRS)/138/9 Pt. | Development of test set up for Signal conditioning cards (SAP) | 19.11.2009 |
| 2002/Elect(TRS)/113/13 | Extraction of data from ESMON at the time of acciednts | 09.11.2009 |
| E(MPP)2009/3/36 | Revised Training Module for Loco Pilots (Goods) | 26.10.2009 |
| 2007/Elect(TRS)440/4 | Uniform costing of POH of electric locos in workshops | 23.10.2009 |
| E(W)2009/WE/5/8 | Nominated Senior Welfare Inspectors (SWI) exclusively for Loco pilots (LPs) and Assistant Loco Pilots (ALPs) | 23.10.2009 |
| 2009/Elect(TRS)/441/3 | Re-distribution for conversion of plain suspension bearing to roller on TAO-659 traction Motors. | 12.10.2009 |
| 2005/Elect(TRS)/113/6 | Report of CRS / Southern Circle on rear collision of MEMU train no. M165 with Passenger train no. 355 on SC Rly on 30.09.08. | 01.10.2009 |
| 99/RS(IC)/165/SRC Pt.2 | Revised list of safety items for electric locos | 09.09.2010 |
| 94/Elect.(TRS)/441/1 Pt.III | Eligibility criteria for award of works contracts to undertake repairs/rehabilitation of equipment of electric locomotives, EMUs/MEMUs and AC TL coaches including power cars | 09.09.2009 |
| 2004/M(L)/466/7101 |
Practical Loco Handling training before promotion of LP(Goods) | 31.08.2009 |
| 2004/M(L)/466/7101 |
Prevention of accidents on crew account | 20.08.2010 |
| 2008/Elect(TRS)/113/4 | Simulator training of newly promoted loco pilots. | 20.08.2009 |
| 94/Elect.(TRS)/441/1 Pt.III. | Eligibility criteria for award of work contracts to undertake repairs_rehabilitation of equipment of electric locomotives, EMU/MEMUs and AC/TL coaches including power cars | 06.08.2009 |
| 2009/Elect(TRS)/155/1 | Training of Loco Pilots for proper communication. | 16.07.2009 |
| 2004/M(L)/466/7101 |
Monitoring of breach of rest and 10 hours duty rules. | 14.07.2009 |
| E(MPP)/2009/3/26 |
Introduction of Training Modules for training of Loco Inspectors (Diesel and Electric) | 13.07.2009 |
| 2007/Elect(TRS)/440/23 | Reliable power supply to crew Management System (CMS) | 25.06.2009 |
| 2007/Elect(TRS)/138/9 Pt | Procurement of Crown Gear Coupling (Hurth Coupling) and membrane for WAP-5 electric locos | 15.06.2009 |
| E(MPP)/2009/3/14 |
Revised Training Program for Assistant Loco Pilots. | 05.06.2009 |
| 97/Elect.(TRS)/113/4 Pt. | Approval of Sources for procurement of safety items pertaining to electric locos | 15.04.2009 |
| 2008/Elect.(TRS)/225/20 | Reporting of abnormalities affecting mainline and sub urban operation | 06.02.2009 |
| 2008/Elect(TRS)/441/5 Pt. | Provision of VCDs on electric locos. | 04.02.2009 |
| 2003/Elect.(TRS)/440/12 Pt. | Fitness of WAP-4 class of electric locos at 140 kmph | 09.01.2009 |
| 2008 | ||
| 2004/Elect.(TRS)/440/40 Pt. | Failure of electric loco wheels due to cracks and guage widening | 23.12.2008 |
| 2008/Elect.(TRS)/720/1 | Manufacturing of wheel sets of conventional electric locos against sanctioned RSPs | 22.12.2008 |
| 2007/Elect.(TRS)/138/9 Pt. | Repair/ rehabilitation of electronic cards(PCBs) of three phase electric locos | 16.12.2008 |
| 2000/Elect.(TRS)/113/2 Pt | Nomination of different types of electric rolling stock for finalisation of fitment schmes of ACD and accessories | 15.12.2008 |
| EL/3.1.10/1 | Schedule of crew friendly cab modification during POH of conventional electric locomotives | 27.11.2008 |
| 2007/Elect.(TRS)/412/2 Pt. | Reducing intensity of energy consumption in Rail Transport | 18.11.2008 |
| D.O. 2007/Elect.(TRS)/440/15/Pt. | Operation of freight trains at maximum permissible speed | 25.09.2008 |
| 2005/Elect.(TRS)/412/6 Pt. | Classification of WAG-5 Locos in FOIS | 23.09.2008 |
| 2005/Elect.(TRS)/480/2 Pt. | Stores Depots for new Electric Loco and EMU Maintenance Sheds | 16.09.2008 |
| 2008/Elect(TRS)/720/1 Pt. | Selective Electrochemical metallising (DALIC) process for reclamation of TM armature shafts | 16.09.2008 |
| 2008/Elect(TRS)/720/1 | Wheel set for three phase electric locos | 15.09.2008 |
| EL/3.2.19/7 | Re-hablitation of tri plate pheumatic panel of E-70 Brake system of 3-Phase Electric Locomotives | 03.09.2008 |
| 2005/Elect(TRS)/440/17 | Enhancing the speed of CC+6+2 T trains to 75 kmph | 28.07.2008 |
| 2008/Elect(TRS)/155/1 | Drive to counsel loco pilots on revised TSD for three phase locos | 27.08.2008 |
| 2007/Elect.(TRS)/440/15 | Planning for Running staff during XI plan | 15.07.2008 |
| 2000/Elect(TRS)/440/6 Pt.II | Deployment of WAM4 locos in MU formation in CONRAJ trains | 14.07.2008 |
| 2008/Elect(TRS)/441/5 | Conversion of plain suspension bearing to roller suspension bearing on TAO-659 Traction Motor | 01.07.2008 |
| 2007/Elect(TRS)/440/8 | Action plan for improving reliability of Static Inverters on electric locos | 23.06.2008 |
| 2008/Elect(TRS)/441/5 | Re-appropriation of spare and sanctions of DBRs on various Railways. | 19.06.2008 |
| 2008/Elect(TRS)/441/5 Pt. | Procurement of cast & fabricated bogies and traction motors for conventional and three phase electric locos | 19.06.2008 |
| 2007/Elect(TRS)/138/5 | GMs Conference held on 26th & 27th May'2008 in Railway Board | 12.06.2008 |
| EL/3.2.21 | Cable Head Termination(CHT) for Electric locos and EMUs | 11.06.2008 |
| 2005/Elect(TRS)/440/18/5 (3 Ph) Pt. | Action plan for improving reliability of Rotors of 6FRA 6068 used in WAG9/WAP7 locomotives | 27.05.2008 |
| 2004/Elect(TRS)/441/12 | Transverse flexibility of Pantograph - Articulated system. | 23.05.2008 |
| 2005/Elect(TRS)/440/17 Pt. | Right powering of trains with 59 BOXN or 41 BCN wagons | 21.05.2008 |
| 97/Elect(TRS)/113/4 Pt.II | Procurement of material for electric locos from aproved sources | 05.05.2008 |
| 2005/Elect.(TRS)/441/13 | Adoption of tri-plate pneumatic brake panels on conventional electric locos | 02.05.2008 |
| 2005/Elect(TRS)/441/7 Pt. | Revised norms for Unit Exchange Spares for maintenance of AC conventional electric locos | 28.04.2008 |
| 2007/Elec(TRS)/138/10 | Decision on items of XXXIIth Maintenance Study Group meeting held at Garden Reach, SER, Kolkata on 10th & 11th Jan 08 | 31-03-2008 |
| 2008/Elect.(TRS)225/5 Pt. | Running Shield for "Best Zone-Electrical Deptt." | 05-03-2008 |
| 2007/Elec(TRS)138/1 | Allotment of Electric Locomotives for MTR during 2008-09 | 28-02-2008 |
| 2007/Elect(TRS)412/2 | Revised formats for reporting Electric loco performance in CEE's MCDO to ML | 12-02-2008 |
| 2007/Elect.(TRS)/441/10 | Upgradation/ modification of single bottle VCBs type BVAC 25.10. of Secheron design supplied by M/s AAL | 06.02.2008 |
| 2005/Elect(TRS)440/18/5(3-Phase) | Action plan for removing for improving liability of traction motor stators of 6FRA 6068 used in WAG9/WAP7 locomotives | 21-01-2008 |
| 2007 | ||
| 2005/Elect(TRS)/441/13 | Adoption of Tri Plate Brake Panel in Electric locos | 26-12-2007 |
| 2002/Elect(TRS)/113/1 | Timely Communication of accidents/unusual occurences | 12-11-2007 |
| 2007/Elect(TRS)/441/8 Pt. | Current rating of traction motor for Electric Locomotives | 07-11-2007 |
| 2005/Elect(TRS)/138/9 Pt. | Report of the Committee to address issues concerning reliability/availability of three phase locos | 22-10-2007 |
| 2007/Elect(TRS)/440/17 | Condemnation of overaged electric locomotives | 03.09.2007 |
| 2002/Elect(TRS)/122/2 | Rectification of defects on Electric locomotives on territorial basis | 16-08-2007 |
| 2004/Elect(TRS)/412/6 | Accountal of GTKMs through FOIS | 25-07-2007 |
| 2002/Elect(TRS)/441/18/9 | Sources for rehabilitation/overhauling of bogies for electric locomotives | 19-07-2007 |
| 2006/Elect(TRS)/155/1 | Bending/fracture of wheel discs of electric locos | 29-06-2007 |
| 2005/Elect(TRS)/440/23 | Proper working of sanders on electric locos | 20-06-2007 |
| 2007/Elect (TRS)/441/6 | Electric loco batteries | 16-04-2007 |
| 2005/Elect (TRS)/440/17 | Right Powering of freight trains | 13-04-2007 |
| 2005/Elect (TRS)/440/23 | Summer and pre-monsoon preparedness. | 04-04-2007 |
| 2007/Elec (TRS)/138/1 | MTR of electric locomotives | 29-03-2007 |
| 2006/Elect.(TRS)/155/1 Pt | Wheel fracture on loco No.22586, WAP-$, SRC,SER | 13-03-2007 |
| 98/Elect(TRS)441/4 Pt. | Microprocessor based control and Fault Diagnostics system for electric locos. | 22-02-2007 |
| 2003/Elect(TRS)440/4 | Polyurethane paint on the body of electric locomotives | 21-02-2007 |
| 2005/Elect(TRS)/441/14 | Overhauling and reconditioning of DI/DU relays of electric locos from original equipment manufacturer (OEM) | 12-01-2007 |
| 2006/Elect(TRS)/412/1 | Electric loco holding as on 01.01.2007 and target for January 2007. | 04-01-2007 |
| 2006 | ||
| 97/Elect(TRS)/113/4 Pt II | Approval of sources for procurement of material for electric locos. | 28-12-2006 |
| 2006/Elect(TRS)/440/19 | Change in the nomenclature of WAM4 locos(with 15:62 gear ratio) to WAM 4G for dedicated freight operations | 12-12-2006 |
| 93/RS(G)/779/5 Pt II | Operation of option clause in supply contracts | 05-12-2006 |
| 2006/Elect.(TRS)/441/3 | Distribution of fund for Bulk RSP and Green Book items for the year 2006-07 for electric locos(amendment ii) | 16-11-2006 |
| 2006/Elect.(TRS)/138/1 | Revised periodicity of POH and IOH schedule of WAP1 & WAP4 class of electric locos . | 13-11-2006 |
| No. 97/Elect(TRS)/113/4 Pt.II | Approval of sources for procurement of material for electric locos | 11-10-2006 |
| No.2005/Elect(TRS)/440/23 | Proper functioning of sanders on electric locomotives | 21-09-2006 |
| No.96/Elect(TRS)/113/8 Pt | Proper functioning of microprocessor based speed-cum-energy monitoring on electric locos. | 21-09-2006 |
| No.2005/RS(G)/779/12 | Procurement policy for signalling, telecommunications and electrical cables | 14-09-2006 |
| No. 96/Elect(TRS)/113/4 Pt.I | Policy for approval of sources of loco spares | 13-09-2006 |
| No. 2006/Elect(TRS)/412/1 | Electric loco holding as on 01-08-2006 and target for August 2006 | 03-08-2006 |
| No. 99/RS(G)/709/4 Pt. I | Procurement of items reserved to be purchased from RDSO approved firms | 19-07-2006 |
| No. 2006/Elect.(TRS)/132/1 | Rehabilitation of N-32 Tap Changers in electric locomotives | 19-07-2006 |
| No. 2000/Elect.(TRS)/441/3(B)Pt. | Procurement of Arno Converter for maintenance replacements | 06-07-2006 |
| No.2006/Elect(TRS)/440/10 | Multi Disciplinary Task Force to study Asset failure, maintenance and recommending system of "Zero Defect Regime" | 20-06-2006 |
| E(NG)1-2006/PM7/12 | Command Structure, promotion and seniority of loco running | 02-06-2006 |
| 2001/Elect(TRS)/440/5 | Movement of Dead Locomotives | 12-07-2006 |
| 93/Elect(TRS)/441/1 Pt.II |
Policy for undertaking repair/rehabilitation and procurement of equipments of electric locos. |
12-06-2006 |
| 2006/Elect(TRS)/441/6 |
Procurement of DBR by CLW. |
7-6-2006 |
| 2006/Elect(TRS)/440/7 3-phase |
Provision of wheel set trolley (Towing Equipment) for moving 3-phase locos with wheel locked. |
16-05-2006 |
| 2002/Elect(TRS)/441/1 Pt. III |
Approval of Draft Specification in Board's Office. |
24-4-2006 |
| 2006/Elect(TRS)/441/3 |
Disribution of funds for Bulk RSP and Green Book items 2006-07. |
04-04-2006 |
| 2005/Elect(TRS)/440/17 pt | Right Powering of Freight Trains on Electric Traction. | 23-12-2005 |