inner-banner-img
2006/Elect(G)/170/2/Pt-II-Part(3) E-3479317 25.06.2025
2021/EEM/148/3/ ACTM (E-office-3368798) 25.06.2025
2010/Elect(G)/148/6 Joint Procedure Order with Timelines for Granting Permission for Over Dimensional Consignment (ODC) on multi Axle trailers through Railway Level Crossing – Revision thereof 11.03.2025
2006/Elect(G)/170/2/Pt-II-Part(3) E-3479317 Advance Correction Slip No. 7 to Railway Manual of AC traction (ACTM) Vol. II Part I, Chapter-3 Para 20319 Sub Para (c.) with regard to movement of Tower wagon 16.12.2024
2021/EEM/148/3/ACTM-Part(9) E-3430744 Advance Correction Slip no. 6 to Railway Manual of ACTM Vol-II part -II Appendix-6, Annexure A6.01 Sr. No. 83 & Annexure A6.02 Sr. No. 74 with regard to provision of Hand Gloves used in 25 kV electrified sections by staff of TRD and other department. 28.05.2024
2012/Infra/18/1Pt-III  (3352046)

Recovery of OHE Maintenance Charges and Inspection Charges for private siding.

07.03.2024
2021/EEM/148/3/ACTM-Part(2) E-3375993

Advance Correction Slip No. 5 to Railway Manual of AC traction (ACTM Revised 2022) Vol. II Part II Appendix-I Para 20.1, 20.2, 20.9 & 30.2

06.12.2023
2021/EEM/148/3/ACTM-Part(3) E-3402261

Advance Correction Slip No. 4 to Railway Manual of AC traction (ACTM) Vol. II Part II Para 17.3 & para 21.2 with regard to power line crossing.

30.11.2023
2006/Elect(G)/170/2/Pt-II (E- 3422660)

Advance Correction slip  no _3 to Railway Manual of ACTM Vol.-II Part I, Para 20317 (2) with regard to Periodicity of TXR inspection for TW. 

17.08.2023
2021/EEM/148/ACTM-Part(9) (E-3430744)

Advance Correction Slip no. 2 to Railway Manual of ACTM Vol-II part -II Appendix-I Para 18.12 with arrangement of traction mast on abutments of bridges and level crossings

18.05.2023
2008/RE/170/3 (E- 3031421)

AC Traction Manual (All Volumes) Revised-2022 and Electrical General Services Manual Vol I (Power Supply).

02.03.2023
--  INDIAN RAILWAYS MANUAL OF AC TRACTION MAINTENANCE AND OPERATION VOLUME III (ELECTRIC ROLLING STOCK) November 2022 Nov 2022
2021/EEM/148/3/ACTM

Advance Correction Slip No. 34 to Railway Manual of AC traction (ACTM) Vol. II Part II Appendix-I Para No. 18.11, ACTM Volume-II, Part-II, Fig. A1.10 & ACTM Vol. II Part-l, Chapter-Vll, para 20703-Sub Para 4() with regard to distance between OHE structures and signal post.

19.12.2022
--  INDIAN RAILWAYS MANUAL OF AC TRACTION MAINTENANCE AND OPERATION VOLUME II (PART II)  Nov 2022
-- INDIAN RAILWAYS MANUAL OF AC TRACTION MAINTENANCE AND OPERATION VOLUME II (PART I) November 2022 Nov 2022
-- IR Manual of AC Traction Maintenance and Operation-Volume I Nov 2022
2021/EEM/148/3/ACTM Advance Correction Slip No. 33 to Railway Manual of AC traction (ACTM) Vol-II Part II Appendix -I Para 18.12 with regard to arrangement of traction masts near level crossings and abutments of bridges. 27.10.2021
2008/Elec(G)/170/1/PT.III Increase in unit rates of Energy bill debits raised by Nodal Railways to other Railways. 15.10.2020
2005/Elect(G)/161/8 Punct/Pt-III Advance correction slip no. 32 in suppression to ACS no. 30 dated 22.10.2019 (LC gate 09.10.2020
2002/EEM/161/21/Vol-II Implementation of guidelines issued regarding composite insulators for 25 kV AC traction on Indian Railways. 30.09.2020
2020/EEM/161/1Vol-II Review of Periodicity of maintenance schedules. 21.09.2020
2008/Elect(G)/170/1 Pt-III/Vol-II/(NTPC/RGPPL) Nomination of Northern Railway to file petition on behalf of issues pertaining to Zonal Railways in CERC/APTEL. 28.08.2020
2012/Elect(G)/150/1Pt-III Legal and application fees expenses for power management by REMCL. 25.08.2020

2008/RE/170/3

ACTM correction slip no. 31  & Certificate of competency

20.01.2020

2005/Elect(G)/161/8/Punct/Pt-III

ACTM correction slip no. 30, modifying proforma

22.10.2019

2019/EEM/148/2

The central electricity authority (measures relating to safety and electric supply) regulations, 2010

06.06.2019

2013/Elect(G)/148/1

Revision of OHE maintenance schedule.

10.05.2019

2013/RE/161/22 (3226774) Advance Correction Slip no. 29 to Indian Railways Manual of AC Traction (ACTM) Vol-I, Chapter-IV Para-10436, 3(a), (b), (c) (Precautions For Movement of ODCs in 25 KV ac Electrified Sections). 25.10.2018
2008/Elect(G)/170/1 Pt-III/NTPC/RGPPL/Vol-II Provision of ABT meters along with associated equipments for availing power under open access on Traction Sub-Stations. 23.02.18

2001/Elect(G)/170/1

Running of trains at 160 kmph on Delhi-Mumbai and Delhi-Howrah routes on trial basis.

04.12.2017

2008/Elect(G)/161/1 Punct/Vol-I

Maintenance of Tower Wagons – Improving Reliability.

23.02.2017

2008/Elect(G)/170/3 Pt

High tension three pulley ATD system.

29.12.2016

2001/Elect(G)/170/1

Inputs required for OHE & power supply system for 160 kmph train operation on existing routes.

22.12.2016

2010/Elect(G)/150/2 Pt

Revamping training facilities and system for TRD and General Service.

14.12.2016

2001/Elect(G)/170/1

Revision in OHE parameters for new electrification works undertaken by CORE, RVNL, IRCON or other agencies and undertaken by Railway through construction organization/open line.

22.11.2016

2001/Elect(G)/170/1

Inputs required for OHE and power supply system for 160 kmph train operation on Delhi-Howrah and Delhi-Mumbai routes.

19.10.2016

2015/RE/138/4 (FTS-137487) Advance Correction Slip No. 27 Modification to Earlier issued correction slip no. 18 to Railways Manual of AC Traction (ACTM) Vol-II Pt II, Appendix-IV – 1994 (Regulation for power Line Crossings of Railway tracks). 06.05.2016
2006/Elect(G)/170/2 Pt Outsourcing of PSI/TRD maintenance activities for electrified sections and sidings. 03.06.2016
2013/RE/161/22 (FTS-82011) Advance Correction Slip no. 28 to Railways Manual of AC Traction (ACTM)/Vol-II Pt.II, Appendix-I. Inclusion Para-33 (For DC-AC conversion) (New addition of para-33) 28.12.2015
2013/RE/161/22 (FTS-82011) Advance Correction Slip no. 25 to Railways Manual of AC Traction (ACTM) Vol-II, Pt-II, Appendix-I. Inclusion Para-33 (For DC-AC conversion). (New addition of Para-33). 20.10.2014

2001/Elect(G)/170/1

Use of pantograph with 2032 mm width.

20.03.2014

2001/Elect(G)/138/4Pt-I

ACTM correction slip no. 24

10.01.2013

82/RE/250/1

Power supply arrangements for signaling & telecommunication installations in 25 kv AC areas.

13.09.2002

Open Access

2012/Elect(G)/150/1 Pt-III

Procurement of economical power for Non-traction for Zonal Railways & PUs.

02.06.2020

2018/Elect(G)/170/1

Power planning and procurement for Railways load.

19.12.2019

2008/Elect(G)/170/1 Pt-III/NTPC/RGPPL/Vol-II

Provision of ABT meters along with associated equipments for availing power under open access on Traction Sub-Stations.

23.02.2018

2008/Elect(G)/170/1 Pt-III/NTPC/RGPPL

Revised power allocation under comprehensive power plan for entire Indian Railways.

06.05.2016

2014/Elect(G)/150/4

Provision of Smart meters in TSS

22.09.2015

 

2012/Elect(G)/150/1 Pt-III

Procurement of economical power for Zonal Railways.

31.12.2014

2012/Elect(G)/150/1 Pt-III

Procurement of economical power for Zonal Railways.

30.12.2014

2010/Elect(G)/148/6

Provision of traffic block & power block charges for maintenance of power line crossings by DISCOM/State utilities/other owners.

13.08.2014

2012/Elect(G)/150/1 Pt-III

Procurement of power for Zonal Railways through bilateral arrangements.

16.05.2014

2013/Elect(G)/150/4

Undertaking power trading for procuring Electrical Energy at economical rate through REMCL.

15.04.2014

     
2008/Elect(G)/161/8 Pt. Trimming/cutting of trees in the electrified sections. 05.09.2012
2005/Elect(G)/161/8 Punct. Pt-II Slewing or alterations to track involving adjustment of contact wire. 17.08.2012
2005/Elect(G)/161/8 Punct. Pt-I Grid failures on 30.07.12 & 31.07.12 06.08.2012
2008/Elect(G)/161/8 . Reliability improvement measures in TRD - Failures of brazing joints.  13.07.2012
2002/Elect(G)/161/21 Vol.-II Coprehensive policy regarding insulators for 25 kV AC traction on Indian Railways. 04.07.2012
2008/Elect(G)/161/8 Pt. Evolving Grid Management Strategies to minimize the impact of power supply failure on train operation. 14.06.2012
TI/CIV/Ms/12 Guideline for OHE arrangements on TTC.  22/23.05.2012
TI/CIV/GCP/09 Corrosion Resistant Paint System for Outdoor Structure of Traction Distribution.  21/23.05.2012
2001/Elect(G)/170/1 Pt. Provision of retro-reflective number plate on OHE mast. 07.05.2012
2008/Elect(G)/161/8 Pt. OHE performance - reporting to Railway Board 03.05.2012
2011/Sig/SF/1 Pt. Joint Procedure Order for protecting S&T & Electrical Cables.  23.04.2012
2011/Elect(G)/148/3 Creation of new Plan Head - Traction Distribution Works.  04.04.2012
2011/CEDO/SD/IRSOD/Elect/02 Addendum & Corrigendum Slip (ACS) No.- 7 to the Indian Railways Schedule of Dimensions (BG) 2004. 14.03.2012
2010/Elect(G)/148/6 Charges applicable for railways work being executed by outside agencies.  18.10.2011
2008/Elect(G)/161/8 Punct. Measures for improving OHE reliability - 12 points Action Plan. 07.10.2011
82/Elect(G)/250/1 Pt. Drive for checking the health of power cables related with train operations. 01.09.2011
2008/Elect(G)/161/1 Pt. Checking of power line crossing line.  11.01.2011
2010/Elect(G)/150/11 Ensuring calibration and heath of energy meters based on which payments to supply authorities are made.  27.12.2010
2008/Elect(G)/161/8 Punct. Safe working by contractor. 25.10.2010
2008/Elect(G)/161/8 Punct. Measures for improving OHE reliability. 28.09.2010
2001/Elect(G)/170/1 Pt. Inputs required for running trains at 150 kmph speed. 30.06.2009
2002/ACII/1/10 (vol-II) Revised Codel life of Assets. 25.02.2009
2001/Elect(G)/138/3 Manpower planning -norms. 16.03.2006
84/RE/158/1 Pt. Maintenance of Tower Wagons 31.01.2006
2002/PL/88/3 Board had approved the following board policy guidelines for outsourcing various activities on Indian Railways in March 2004. 28.01.2005