| 2006/Elect(G)/170/2/Pt-II-Part(3) E-3479317 | 25.06.2025 | ||
| 2021/EEM/148/3/ ACTM (E-office-3368798) | 25.06.2025 | ||
| 2010/Elect(G)/148/6 | Joint Procedure Order with Timelines for Granting Permission for Over Dimensional Consignment (ODC) on multi Axle trailers through Railway Level Crossing – Revision thereof | 11.03.2025 | |
| 2006/Elect(G)/170/2/Pt-II-Part(3) E-3479317 | Advance Correction Slip No. 7 to Railway Manual of AC traction (ACTM) Vol. II Part I, Chapter-3 Para 20319 Sub Para (c.) with regard to movement of Tower wagon | 16.12.2024 | |
| 2021/EEM/148/3/ACTM-Part(9) E-3430744 | Advance Correction Slip no. 6 to Railway Manual of ACTM Vol-II part -II Appendix-6, Annexure A6.01 Sr. No. 83 & Annexure A6.02 Sr. No. 74 with regard to provision of Hand Gloves used in 25 kV electrified sections by staff of TRD and other department. | 28.05.2024 | |
| 2012/Infra/18/1Pt-III (3352046) |
Recovery of OHE Maintenance Charges and Inspection Charges for private siding. |
07.03.2024 | |
| 2021/EEM/148/3/ACTM-Part(2) E-3375993 | 06.12.2023 | ||
| 2021/EEM/148/3/ACTM-Part(3) E-3402261 | 30.11.2023 | ||
| 2006/Elect(G)/170/2/Pt-II (E- 3422660) | 17.08.2023 | ||
| 2021/EEM/148/ACTM-Part(9) (E-3430744) | 18.05.2023 | ||
| 2008/RE/170/3 (E- 3031421) |
|
02.03.2023 | |
| -- | INDIAN RAILWAYS MANUAL OF AC TRACTION MAINTENANCE AND OPERATION VOLUME III (ELECTRIC ROLLING STOCK) November 2022 | Nov 2022 | |
| 2021/EEM/148/3/ACTM |
|
19.12.2022 | |
| -- | INDIAN RAILWAYS MANUAL OF AC TRACTION MAINTENANCE AND OPERATION VOLUME II (PART II) | Nov 2022 | |
| -- | INDIAN RAILWAYS MANUAL OF AC TRACTION MAINTENANCE AND OPERATION VOLUME II (PART I) November 2022 | Nov 2022 | |
| -- | IR Manual of AC Traction Maintenance and Operation-Volume I | Nov 2022 | |
| 2021/EEM/148/3/ACTM | Advance Correction Slip No. 33 to Railway Manual of AC traction (ACTM) Vol-II Part II Appendix -I Para 18.12 with regard to arrangement of traction masts near level crossings and abutments of bridges. | 27.10.2021 | |
| 2008/Elec(G)/170/1/PT.III | Increase in unit rates of Energy bill debits raised by Nodal Railways to other Railways. | 15.10.2020 | |
| 2005/Elect(G)/161/8 Punct/Pt-III | Advance correction slip no. 32 in suppression to ACS no. 30 dated 22.10.2019 (LC gate | 09.10.2020 | |
| 2002/EEM/161/21/Vol-II | Implementation of guidelines issued regarding composite insulators for 25 kV AC traction on Indian Railways. | 30.09.2020 | |
| 2020/EEM/161/1Vol-II | Review of Periodicity of maintenance schedules. | 21.09.2020 | |
| 2008/Elect(G)/170/1 Pt-III/Vol-II/(NTPC/RGPPL) | Nomination of Northern Railway to file petition on behalf of issues pertaining to Zonal Railways in CERC/APTEL. | 28.08.2020 | |
| 2012/Elect(G)/150/1Pt-III | Legal and application fees expenses for power management by REMCL. | 25.08.2020 | |
|
ACTM correction slip no. 31 & Certificate of competency |
20.01.2020 |
||
|
ACTM correction slip no. 30, modifying proforma |
22.10.2019 |
||
|
The central electricity authority (measures relating to safety and electric supply) regulations, 2010 |
06.06.2019 |
||
|
Revision of OHE maintenance schedule. |
10.05.2019 |
||
| 2013/RE/161/22 (3226774) | Advance Correction Slip no. 29 to Indian Railways Manual of AC Traction (ACTM) Vol-I, Chapter-IV Para-10436, 3(a), (b), (c) (Precautions For Movement of ODCs in 25 KV ac Electrified Sections). | 25.10.2018 | |
| 2008/Elect(G)/170/1 Pt-III/NTPC/RGPPL/Vol-II | Provision of ABT meters along with associated equipments for availing power under open access on Traction Sub-Stations. | 23.02.18 | |
|
Running of trains at 160 kmph on Delhi-Mumbai and Delhi-Howrah routes on trial basis. |
04.12.2017 |
||
|
Maintenance of Tower Wagons – Improving Reliability. |
23.02.2017 |
||
|
High tension three pulley ATD system. |
29.12.2016 |
||
|
Inputs required for OHE & power supply system for 160 kmph train operation on existing routes. |
22.12.2016 |
||
|
Revamping training facilities and system for TRD and General Service. |
14.12.2016 |
||
|
Revision in OHE parameters for new electrification works undertaken by CORE, RVNL, IRCON or other agencies and undertaken by Railway through construction organization/open line. |
22.11.2016 |
||
|
Inputs required for OHE and power supply system for 160 kmph train operation on Delhi-Howrah and Delhi-Mumbai routes. |
19.10.2016 |
||
| 2015/RE/138/4 (FTS-137487) | Advance Correction Slip No. 27 Modification to Earlier issued correction slip no. 18 to Railways Manual of AC Traction (ACTM) Vol-II Pt II, Appendix-IV – 1994 (Regulation for power Line Crossings of Railway tracks). | 06.05.2016 | |
| 2006/Elect(G)/170/2 Pt | Outsourcing of PSI/TRD maintenance activities for electrified sections and sidings. | 03.06.2016 | |
| 2013/RE/161/22 (FTS-82011) | Advance Correction Slip no. 28 to Railways Manual of AC Traction (ACTM)/Vol-II Pt.II, Appendix-I. Inclusion Para-33 (For DC-AC conversion) (New addition of para-33) | 28.12.2015 | |
| 2013/RE/161/22 (FTS-82011) | Advance Correction Slip no. 25 to Railways Manual of AC Traction (ACTM) Vol-II, Pt-II, Appendix-I. Inclusion Para-33 (For DC-AC conversion). (New addition of Para-33). | 20.10.2014 | |
|
Use of pantograph with 2032 mm width. |
20.03.2014 |
||
|
ACTM correction slip no. 24 |
10.01.2013 |
||
|
Power supply arrangements for signaling & telecommunication installations in 25 kv AC areas. |
13.09.2002 |
||
| Open Access | |||
|
Procurement of economical power for Non-traction for Zonal Railways & PUs. |
02.06.2020 |
||
|
Power planning and procurement for Railways load. |
19.12.2019 |
||
|
Provision of ABT meters along with associated equipments for availing power under open access on Traction Sub-Stations. |
23.02.2018 |
||
|
Revised power allocation under comprehensive power plan for entire Indian Railways. |
06.05.2016 |
||
|
Provision of Smart meters in TSS |
22.09.2015
|
||
|
Procurement of economical power for Zonal Railways. |
31.12.2014 |
||
|
Procurement of economical power for Zonal Railways. |
30.12.2014 |
||
|
Provision of traffic block & power block charges for maintenance of power line crossings by DISCOM/State utilities/other owners. |
13.08.2014 |
||
|
Procurement of power for Zonal Railways through bilateral arrangements. |
16.05.2014 |
||
|
Undertaking power trading for procuring Electrical Energy at economical rate through REMCL. |
15.04.2014 |
||
| 2008/Elect(G)/161/8 Pt. | Trimming/cutting of trees in the electrified sections. | 05.09.2012 | |
| 2005/Elect(G)/161/8 Punct. Pt-II | Slewing or alterations to track involving adjustment of contact wire. | 17.08.2012 | |
| 2005/Elect(G)/161/8 Punct. Pt-I | Grid failures on 30.07.12 & 31.07.12 | 06.08.2012 | |
| 2008/Elect(G)/161/8 . | Reliability improvement measures in TRD - Failures of brazing joints. | 13.07.2012 | |
| 2002/Elect(G)/161/21 Vol.-II | Coprehensive policy regarding insulators for 25 kV AC traction on Indian Railways. | 04.07.2012 | |
| 2008/Elect(G)/161/8 Pt. | Evolving Grid Management Strategies to minimize the impact of power supply failure on train operation. | 14.06.2012 | |
| TI/CIV/Ms/12 | Guideline for OHE arrangements on TTC. | 22/23.05.2012 | |
| TI/CIV/GCP/09 | Corrosion Resistant Paint System for Outdoor Structure of Traction Distribution. | 21/23.05.2012 | |
| 2001/Elect(G)/170/1 Pt. | Provision of retro-reflective number plate on OHE mast. | 07.05.2012 | |
| 2008/Elect(G)/161/8 Pt. | OHE performance - reporting to Railway Board | 03.05.2012 | |
| 2011/Sig/SF/1 Pt. | Joint Procedure Order for protecting S&T & Electrical Cables. | 23.04.2012 | |
| 2011/Elect(G)/148/3 | Creation of new Plan Head - Traction Distribution Works. | 04.04.2012 | |
| 2011/CEDO/SD/IRSOD/Elect/02 | Addendum & Corrigendum Slip (ACS) No.- 7 to the Indian Railways Schedule of Dimensions (BG) 2004. | 14.03.2012 | |
| 2010/Elect(G)/148/6 | Charges applicable for railways work being executed by outside agencies. | 18.10.2011 | |
| 2008/Elect(G)/161/8 Punct. | Measures for improving OHE reliability - 12 points Action Plan. | 07.10.2011 | |
| 82/Elect(G)/250/1 Pt. | Drive for checking the health of power cables related with train operations. | 01.09.2011 | |
| 2008/Elect(G)/161/1 Pt. | Checking of power line crossing line. | 11.01.2011 | |
| 2010/Elect(G)/150/11 | Ensuring calibration and heath of energy meters based on which payments to supply authorities are made. | 27.12.2010 | |
| 2008/Elect(G)/161/8 Punct. | Safe working by contractor. | 25.10.2010 | |
| 2008/Elect(G)/161/8 Punct. | Measures for improving OHE reliability. | 28.09.2010 | |
| 2001/Elect(G)/170/1 Pt. | Inputs required for running trains at 150 kmph speed. | 30.06.2009 | |
| 2002/ACII/1/10 (vol-II) | Revised Codel life of Assets. | 25.02.2009 | |
| 2001/Elect(G)/138/3 | Manpower planning -norms. | 16.03.2006 | |
| 84/RE/158/1 Pt. | Maintenance of Tower Wagons | 31.01.2006 | |
| 2002/PL/88/3 | Board had approved the following board policy guidelines for outsourcing various activities on Indian Railways in March 2004. | 28.01.2005 | |