| Electrical (RE) | |||
|
S.No. |
Letter No. |
Subject |
Issued date |
| ACTM Correction Slips | |||
| 1. | 2004/RE/161/1 Pt-III(ACTM) | Advance Correction Slip No. 12 to Railways Manual of AC Traction (ACTM) Vol.-II Pt. I, 1994. Details regarding – Temporary Speed Restrictions and inclusion of additional proformas in conformity with Railways (Opening of Public Carriage of Passengers) Rules 2000. | 03.05.05 |
| 2. | 2004/RE/161/1 Pt-III(ACTM) | Advance Correction Slip No. 13 to Railways Manual of AC Traction (ACTM) Vol.-II Pt. I, 1994 – Revision in the Maintenance Proforma of ACTM. | 01.07.05 |
| 3. | 2004/RE/161/1 Pt-III(ACTM) | Advance Correction Slip No. 14 to Railways Manual of AC Traction (ACTM) Vol.-II Pt. II, Para 3.0 and Appendix IV, 1994 (Regulations for power line crossing of Railway tracks). | 24.05.06 |
| 4. | 2004/RE/161/1 Pt-III(ACTM) | Advance Correction Slip No. 15 to Railways Manual of AC Traction (ACTM) Vol.-II Pt. II, Appendix IV, 1994 (Regulations for power line crossing of Railway tracks). | 24.05.06 |
| 5. | 2004/RE/161/1 Pt-III(ACTM) | Advance Correction Slip No. 16 to Railways Manual of AC Traction (ACTM) Vol.-II Pt. II, Appendix IV, 1994 (Regulations for power line crossing of Railway tracks). | 18.09.06 |
| 6. | 2000/RE/161/1 Pt III | Advance Correction Slip No. 17, Simplification (Modification/Revisions) in Paras of Railways Manual of AC Traction (ACTM) Vol.-II Pt I, Para 21005 (item 6), Para 21007 (item 2 (i)), Para 21009 (Sub-para 1(c)), Para 21010 (Sub-para 1(a), Sub-para 1(b), Sub-para 1(c), Sub-para 3(f)). | 12.08.08 |
| 7. | 2001/Elect(G)/ 138/4 Pt.-I |
Advance Correction Slip No. 24 to Railways Manual of AC Traction (ACTM) Vol.-III Pt I, Para 20970-05.
|
10.01.13 |
| 8. |
ACTM Correction Slip No. 18 |
19.01.09 |
|
| 9. |
ACTM Correction Slip No. 19 |
31.03.10 |
|
| 10. |
ACTM Correction Slip No. 20 |
03.11.10 |
|
| 11. |
ACTM Correction Slip No. 21 |
10.11.10 |
|
| 12. |
ACTM Correction Slip No. 22 |
24.01.11 |
|
| 13. |
ACTM Correction Slip No. 23 |
28.08.12 |
|
| Standard Implantation | |||
| 1. | 2014/RE/161/10 | Special OHE arrangement under Hancock ROB in Mumbai Division of Central Railway | 09.10.2014 |
| 2. | ----- | Heights of different rolling stocks | 26.03.2014 |
| 3. | 2007/RE/161/5 | IRSOD condonation cases coming to Railway Board’s office | 18.07.2012 |
| 4. | TI/CIVIL/FND/12 | OHE foundation Drawings for increased Implantation from 2800 mm to 2900 mm from center line of nearest track. | 26.03.2012 |
|
5. |
OHE Implantation |
03.11.2010 |
|
| 6. | 2000/RE/161/1/Pt III | Standard Implantation for new electrification works. | 3.11.2010 |
| 7. | 2006/RE/138/4 | Standard Implantation for new electrification work | 26.02.2010 |
| 8. | 2006/RE/138/4 | Standards for implantation to be adopted for RE | 17.09.2008 |
|
9. |
Standard implantation in future RE |
14.11.2006 |
|
| Clearances Under ROB/FOB | |||
|
1. |
Insulation Paint |
24.11.2011 |
|
|
2. |
Clarification regarding raising of under FOBs/ROBs |
27.08.2012 |
|
| Cost Cutting Measured for RE | |||
|
1. |
Reduction of Cost of RE Projects – Use of Spun PSC Masts |
11.03.2005 |
|
| 2. | 2001/RE/220/4 | Traction power supply arrangements- augmentation for meeting present traffic need. | 05.07.2004 |
| 3. | 92/RE/161/9 | Reduction of cost of Railway Electrification | 25.03.1994 |
| RVNL Policy Issues | |||
| 1. | 2004/W-I/RVNL/15 | Enhancement of the revenue stream of RVNL | 02.06.2010 |
|
2. |
D&G Charges |
04.01.2012 |
|
|
3. |
Sanction of DE, Revised estimates |
14.08.2012 |
|
| IRSOD Correction Slips | |||
| 1. | 2011/CEDO/SD/IRSOD/Elect./02 | ACSs to IRSOD(BG).2004 | 21.07.2014 |
| 2. | 2011/CEDO/SD/IRSOD/Elect./02 | ACS No.15 to Indian Railways SOD (BG) 2004 | 19.06.2014 |
| 3. | 2011/CEDO/SD/17/O/Pt.II | ACS No.2 to SSODs for Dedicated Freight Corridors of Indian Railways,2013 | 19.06.2014 |
| 4. | 2011/CEDO/SD/IRSOD/Elect./02 | ACS No. 13 to Indian Railways Schedule of Dimensions (BG)2004 | 21.10.2013 |
| 5. | 2012/CEDO/SD/IRSOD/O/1 | Addendum & Corrigendum Slip (ACS) No. 11 to the Indian Railways Schedule of Dimensions (BG) 2004. | 28.12.12 |
| 6. | 2011/CEDO/SD/IRSDO/Elect/2 | Addendum & Corrigendum Slip (ACS) No. 10 to the Indian Railways Schedule of Dimensions (BG) 2004 | 08.11.12 |
|
7. |
ACS-7 |
14.03.2012 |
|
| Other Reliability Issues | |||
| 1. | 2002/AC II/1/10(Vol.II ) | CODAL LIFE OF OHE | 25/02/2009 |
| 2. | 2002/AC-II/2/10/Vol.II | Revised Codal Life of Assets | 22.08.2012 |
| RDSO Issues | |||
| 1. | 2007/CE-I/CT/18 Pt-19 | Price variation Clause-46.A to IR's General Conditions of Contract (GCC)-'General Instruction'. | 14.12.12 |
| 2. | 2006/RE/161/4/Vol-VI/FTS -30831 | Provision of Numerical Relay Panels on traction sub-stations. | 17.07.12 |
|
3. |
Vendor Developmental procedure for contact wire from indigenous CCC Rods |
27.04.12 |
|
| Procurement of RS and T/Wagon Issues | |||
| 1. | 2012/CEDO/SD/RS/04 | Condonation of infringement to IRSOD for 4-wheeler Self-Propelled MEMV | 16.10.2012 |
| 2. | 84/RE/158/PL | Norms/yardsticks to be followed for provision of 8 wheeler tower wagons/4-wheeler tower wagons on electrified Railways. | 19.01.2006 |
| Stores Matters | |||
| 1. | DG/Misc. | Merging of Part-I and Part-II sources for contact wire, cat. Wire & SCADA | 28.08.2014 |
| 2. | 99/RS(G)/709/1/Pt-I | Placement of full quality orders on sources under part -II for items where there is no part-I source. | 28/4/2004 |
| Post Creation and Yardsticks | |||
| 1. | 2013/E&R/3(1)/1 | Yardsticks for gazette staff in construction Projects for the year 2013-14 | 29.08.2013 |
| Policy Issues for Outsourcing, Maintenance | |||
| 1. | 2008/Elect(G)/150/12 | Out sourcing of PSI/TRD maintenance activities for newly electrified sections, transmission lines and sidings. | 15.05.13 |
| High Rise OHE | |||
| 1. | 2006/RE/161/4-Vol. VII | Allotment of execution of RE works included in Railway Budget 2013-14 | 19.03.2013 |
| 2. | 2008/RE/161/8/Vol.II FTS-61292 | Decision to be taken for high rise OHE on Rewari-Manheru-Hisar-Ludhiana | 11.01.2013 |
| SOP | |||
| 1. | F(X)-II - 2006/PW/3 | Delegation of powers to DRM's for consultancy contracts. | 16.05.06 |
| 2. | CORE's SOP for consultancy contracts. | ||
| 3. | F(X) II-2006/PW/17 | Delegation of Powers To General Managers | 18.10.2006 |
| 4. | F(X) II-2003/PW/1 | Delegation of Powers To General Managers | 09.01.2003 |
| Contractual Issues (Works tenders) | |||
| 1. | 2007/CE-I/CT/13 | Power of acceptance of Works Tenders | 27.08.2013 |
| 2. | 2002/CE-1/CI/37 JV Pt.VIII |
Participation of Joint Venture Firms in Works Tenders on Indian Railways-Additional Provisions for GM/ CORE & CAO/USBRL/NR.
|
08.01.13 |
| 3. | 2002/CE-I/CT/37 | Participation of Joint Venture Firms in Works Tenders on Indian Railways | 07.09.2011 |
| Railway Electrification Issues | |||
| 1. | 2006/RE/161/4/Vol.II(FTS-R 58430/2015) | Provision of TRD estimate in proposal for doubling/3rd line (PH:15) in electrified/undergoing electrification sections. | 11.06.2015 |
| 2. | 2013/RE/161/3 | OHE span in Alwar-Rewari section of NWR for new RE works | 27.06.2013 |
| 3. | 2003/Tele/RCIL/1 Pt. lX | Procedure for undertaking digging work in the vicinity of signaling, Electrical | 24.06.2013 |
| 4. | 2013/RE/161/3 | OHE design in view of changed wind zones | 20.05.2013 |
| 5. | 2013/W-2/ER/DL/05 | Provision of Electrical estimate (Electrical/TRD) in initial stage while considering the proposal of doubling/ 3rd line in the Electrified territory. | 03.04.13 |
| 6. | F(X)-2008/RE/1 | Methodology and evolution of Railway Electrification Projects | 12.06.2008 |
| Safety Issues | |||
| 1. | 2009/RE/161/4 | Precautions in25 Kv AC system | 26.08.2014 |
| Sanction of RE Projects | |||
| 1. | 0-140 15/01/2011-PAMD | Guidelines for Plg. Comm.for In Principle Approval to RE Projects | 23.08.2013 |
| RE with New Line, GC, Doubling | |||
| 1. | 2016/W-II/ECoR/Misc/24 | Revision in OHE parameters. | 31.01.2017 |
| 2. | 2016/W-I/Genl./NL-RE | OHE Layout Planning in RE Works on Single Line | 27.01.2017 |
| 3. | 2014/RE/161/14/ | Letter of AM/Plg. For RE with doubling/tripling etc. | 02.09.2014 |
| Issues With CRS,CCRS | |||
| 1. | 200O/RE/161/1/pt.-lll (ACTM) pt.-l | Introduction of Rolling Stock on Newly Electrified Section | 19.01.2012 |
| Tower Wagon Issues | |||
| 1. | 84/RE/158/1/2 FTS-2862 | Future policy for Procurement of Tower Wagons | 16.12.11 |
| 2. | 2012/CEDO/SD/RS/04 | Design and Procurement of only 8 -Wheeler rolling stocks on Indian Railway System | 17.10.12 |
| 3. | 2002/AC-II/2/10/Vol-II | Revised Codal life of Assets | 22.08.12 |
| Source : Ministry of Railways (Railway Board) CMS Team Last Reviewed on: 31-01-2017 | |||