| Circulars/ Letters | ||
| 2025 | ||
| Execution of projects through EPC and Non-EPC Tender modes. | 04.11.2025 | |
|
Constitution of a Joint Working Group for Feasibility Assessment of Rail-and-Road Tunnel Projects at Alignment-Finalization/DPR Stage |
30.09.2025 |
|
|
Conduct of traffic study prior to undertaking Final Location Survey/DPR preparation. |
29.09.2025 |
|
|
Use of second-hand 60 Kg rails in loop lines under sanctioned DPRs. |
11.09.2025 |
|
|
Amendment in powers to sanction Feasibility Studies and Final Location Surveys (FLS) by Zonal Railways |
08.09.2019 |
|
|
Action Taken Report on CAG Audit Para - Ensuring site suitability and comprehensive assessment prior to execution of projects. |
26.08.2025 |
|
|
2019/W-I/Genl./PCDO (E-3280535 ) |
Revised format of reporting progress through PCDO - 13.08.2025 |
13.08.2025 |
|
Clarification regarding invitation of Non-EPC tenders.- 07.08.2025 |
07.08.2025 |
|
|
Constitution of a Joint Working Group for Feasibility Assessment of Rail-and-Road Tunnel Projects at Alignment-Finalization/DPR Stag |
31.07.2025 |
|
|
Quality of infrastructure works |
29.07.2025 |
|
|
Revision of Rates for Final Location Surveys (FLS) |
28.07.2025 |
|
|
Prior Approval for specified construction across Ganga River Under NMCG Authorities Notification, 2016 |
24.06.2025 |
|
|
Monsoon safety precautions at Construction worksites. |
02.06.2025 |
|
|
Simplification of procedures from MoEFCC |
03.05.2025 |
|
|
Leveraging technology for proj monitoring |
26.03.2025 |
|
|
EPC Tender |
24.03.2025 |
|
|
Joint advisory by Rural development, Railway Board on Amrit Sarovar Phase-II. |
24.02.2025 |
|
|
Final(Stage-II) approval of Forest Clearances in the projects |
20.03.2025 |
|
|
Improving the planning and construction of major/important bridges and opening thereof. |
10.01.2025 |
|
| 2024 | ||
|
Re-organisation of Gati Shakti Units in Divisions |
22.08.2024 |
|
|
EPC Tender |
20.05.2024 |
|
|
Fast tracking execution of Multi-tracking projects under three economic corridors (Energy, mineral and cement corridor, High Traffic Density routes, Rail Sagar Corridor) |
16.04.2024 |
|
|
Preparation and submission of Detailed Project Report (DPR) for New Line/Multi tracking/Gauge conversion. |
10.01.2024 |
|
| 2023 | ||
|
Policy on planning of 3rd/4th line |
22.12.2023 |
|
|
Proforma for submission of Detailed Project Report. |
13.12.2023 |
|
|
Construction of Escape Tunnel during Tunneling Works over Indian Railways. |
22.11.2023 |
|
|
Corrigendum to Railway Board's letter no. 2021/W-I/Genl./Gati Shakti dt. 27.07.2022 for Setting up of Gati Shakti Units in Divisions |
26.10.2023 |
|
|
Clarification on exemption of Railway projects from the requirement of Environment Clearance (EC) and Coastal Regulation Zone (CRZ) Clearance as per Section 11 of Railways Act, 1989-reg. |
13.10.2023 |
|
|
Updation of PMG Portal. |
19.06.2023 |
|
|
Mutation and completion of land records for land acquired for railway projects |
08.06.2023 |
|
|
Corrigendum to Operationalization of GatiShakti Units in the Divisions Board's letter of even number. |
29.03.2023 |
|
|
Clarification on Right of Way (RoW) mentioned in guidelines dated 10.03.2022 issued by MoEFCC. |
21.03.2023 |
|
| 2022 | ||
|
Execution of new line projects policy. |
25.11.2022 |
|
|
Proforma for preparation and submission of Detailed Project Report for New Line/ Doubling/ Multi Tracking/ Gauge Conversion. |
02.09.2022 |
|
|
Setting up of Gati Shakti Units in Divisions. |
27.07.2022 |
|
|
Submission of document for projects costing more than Rs. 500 crore each. |
27.07.2022 |
|
|
Use of Soil and silt excavated from Amrit Sarovar for infrastructure projects reg. |
13.06.2022 |
|
|
Setting up of Gati Shakti Unit under DRM/Agra |
09.06.2022 |
|
|
Comprehensive Project Appraisal System for sanctioning new projects by factoring in the "Network Effect". |
06.06.2022 |
|
|
New Line, Gauge conversion and Doubling works targeted for commissioning during FY 2022-23 and plan to increase capital expenditure on these projects. |
25.05.2022 |
|
|
Setting up of Gati Shakti Units in Khurda, Bilaspur, Delhi & Bengaluru divisions. |
16.05.2022 |
|
|
Engineering Traffic Allowance (ETA) & Block for infrastructure works. |
16.05.2022 |
|
|
Detailed Project Report (DPRs)/ Detailed Estimates (DE)/ Revised Estimates (RE)/ of New/Sanctioned Projects |
12.05.2022 |
|
|
Faster implementation of infrastructure projects. |
06.05.2022 |
|
|
Detailed Project Report (DPR) for projects |
06.05.2022 |
|
|
Revision in Cost & Quality of works in various projects. |
25.03.2022 |
|
|
Provision of Ballastless track (BLT) in tunnels. |
11.03.2022 |
|
|
Sanction for Final Location Surveys (FLS) |
08.03.2022 |
|
|
|
04.03.2022 |
|
|
Sanction of sub-works against Umbrella Works of 2020-21 of Traffic Facility Plan Head(PH-16) |
15.02.2022 |
|
|
Sanction for Final Location Surveys (FLS) |
08.02.2022 |
|
|
Sanction of Preliminary Engineering cum Traffic Survey for Nemisharanya to Farrukhabad via Hardoi new BG line (112 km) |
07.01.2022 |
|
|
Sanction for Final Location Survey for Imphal - Moreh new BG line. |
05.01.2022 |
|
| 2021 | ||
|
Sanction for Final Location Surveys (FLS) |
30.12.2021 |
|
|
Sanction for Final Location survey (FLS) |
17.12.2021 |
|
|
Sanction of Preliminary Engineering cum Traffic (PET) surveys. |
26.11.2021 |
|
|
Additional fund allotment in RE 2021-22 for important/ recently sanctioned Final Location Survey Works. |
26.11.2021 |
|
|
Construction of new Bridge during Doubling. |
12.11.2021 |
|
|
Provision of Facilities for Track Machine Staff |
27.10.2021 |
|
|
Sanction of Final Location Survey. |
21.10.2021 |
|
|
Sanction of Final Location Survey. |
11.10.2021 |
|
|
Sanction of works against umbrella Work of 209-20 of Traffic Facility Plan Head (PH-16) |
29.09.2021 |
|
|
Adoption of modern methods for construction of tunnels |
10.09.2021 |
|
|
Updation of data on Portals |
05.07.2021 |
|
|
Revision of Rates and scope of Final Location Survey (FLS) |
30.06.2021 |
|
|
Revision of Rates for Final Location Survey (FLS) |
16.06.2021 |
|
|
List of Railway projects monitored through PRAGATI (25.03.2015 to 24.02.2021) |
10.06.2021 |
|
|
Monitoring of Projects by PMO through PMREF portal |
04.06.2021 |
|
|
NOMINATION OF HAG OFFICER FOR MONITORING OF PROJECTS DATED 28.05.2021 |
28.05.2021 |
|
|
D.O. Letters to CMs regarding Projects on Cost Sharing Projects. |
03.05.2021 |
|
|
Sanction of Final Location Survey for works under Doubling Plan Head. |
22.03.2021 |
|
|
Target Date of Completion of projects. |
19.02.2021 |
|
|
Nomination of HAG Officers for monitoring of Priority Projects of Vision 2024 Dated 20.01.2021 |
20.01.2021 |
|
|
Use of Modern Survey Technologies for Survey of New Line, Gauge Conversion & Doubling Projects. |
06.01.2021 |
|
|
Vision 2024 Document |
28.12.2020 |
|
|
Carrying out FLS and submission of DPRs by Zonal Railways. |
07.10.2020 |
|
|
Maintenance of newly commissioned New Line/Doubling/Gauge Conversion sections. |
14.09.2020 |
|
|
Preparation of estimates and Excess Expenditure incurred by Railway over and sanctioned detailed estimates during the course of execution of projects. |
11.05.2020 |
|
|
General Instructions regarding surveys of railway projects. |
18.02.2020 |
|
|
Platfrom lenght at Railway Stations for new line, gauge conversion & doubling projects |
25.02.2020 |
|
|
Execution of new line projects-Policy regarding. |
05.02.2020 |
|
|
Platform level for new Construction/Platform raising works. |
31.01.2020 |
|
|
Sanction of Final Location Surveys for sanctioned work of New Line Plan Head. |
21.01.2020 |
|
|
Sanction of Final Location Surveys for sanctioned work of Doubling Plan Head. |
16.01.2020 |
|
|
Construction of formation for Doubling on DFC feeder routes. |
18.12.2019 |
|
|
Corrigendum to Works, Machinery & Rolling Stock Programme 2019-20 |
12.12.2019 |
|
|
Elimination of level crossings in Doubling Projects. |
10.10.2019 |
|
|
Land acquisition for Railway projects - draft correction to App, III and Paras 822-836 of Engineering Code |
13.06.2019 |
|
|
Level Crossing on new line projects. |
10.06.2019 |
|
|
Review of Important Insfrastructure Projects through VIKAS SAMVAD |
27.03.2019 |
|
|
Execution of New Line, guage Conversion and Doubling Projects. |
25.02.2019 |
|
|
Commissioning NewLine Gauge Conversion and Doubling. |
|
|
|
Approval and Execution of projects of New Line, Gauge Coversion and Doubling included in Budget 2018-19 and later subject to requisite approvals appearing with # mark in Pink Book. |
30.01.2019 |
|
|
|
|
|
|
Speed Policy framework for Indian Railways. |
06.12.2018 |
|
|
Execution of Works under various Plan Head costing more than Rs. 3 Crores. |
05.12.2018 |
|
|
EPC Tender. |
30.11.2018 |
|
|
Commissioning of New Line, Gauge Conversion & Doubling. |
26.11.2018 |
|
|
Review meeting of commissioning of New Line / Gauge Conversion / Doubling on 01.11.2018 |
12.11.2018 |
|
|
Infrastructure Works Review video conference (VC) with GMs of Zonal Railways and CMDs of PSUs held on 11th September 2018. |
26.09.2018 |
|
|
Policy Guidelines on Loop line and Siding. |
07.09.2018 |
|
|
Land acquisition for Railway Projects in tunneling portion. |
06.09.2018 |
|
|
Policy guidelines - Execution and algnment of 3rd Line Projects. |
04.09.2018 |
|
|
Policy Guidelines - Execution and alignment of 3rd Line Projects. |
05.07.2018 |
|
|
Execution of New Line Projects Policy |
29.06.2018 |
|
|
Degree of curvature for new projects of New Line, Guage Conversion and Doubling and Level crossing in New Line. |
28.05.2018 |
|
|
2018/W-I/Genl./Target 2018-19 (CRB's Letter to Rly Units) |
CR, ECOR, ECR, ER, NCR, NER, NFR, NR, NWR, SCR - (Revised), SECR, SER, SR, SWR-(Revised), WCR, WR - (Revised), IRCON, RITES, RVNL |
09.05.2018 |
|
Degree of curvature for new projects of New Line, Guage Conversion and Doubling. |
04.05.2018 |
|
|
Sanction of Final Location Surveys-2018 |
20.02.2018 |
|
|
Indian Railways Nodal Officer (project-wise). |
18.01.2018 |
|
|
Flash Butt welding of Rails. |
18.12.2017 |
|
|
Execution of New Line Projects - Land Issues with State Govts. |
06.12.2017 |
|
|
Policy regarding Construction of 3rd and 4th line. |
29.11.2017 |
|
|
Details to be included in Monthly PCDO. |
27.11.2017 |
|
|
Approvals and execution of 54 NL, GC DL projects included in Budget 2017-18. |
16.11.2017 |
|
|
Platform level for new construction- Platform raising work. |
02.11.2017 |
|
|
Execution of New Line projects. |
30.10.2017 |
|
|
Clarification of MoEF&CC with respect of Gauge Conversion works. |
27.09.2017 |
|
|
Booking Head for Expenditure on land acquisition provided free of cost by State Governments. |
15.09.2017 |
|
|
Works-Re-appropriation (CAP & EBR(IF) – Sept 2017. |
06.09.2017 |
|
|
Provision of Second Distant Signal on ‘B’ Route and doubling/tripling projects. |
22.08.2017 |
|
|
Execution of Yard Remodelling works in all New Line, Gauge Conversion and Doubling projects. |
11.08.2017 |
|
|
Project implementation and Monitoring. |
25.07.2017 |
|
|
Inclusion of TRD Estimate in NL,GC & DL proposals in already electrified/under electrification territory |
05.07.2017 |
|
|
2017/WI/JV/Genl/State JV |
02.06.2017 |
|
|
Delegation of powers to CAO(C)s for Tender to Survey. |
22.05.2017 |
|
|
Provision of fixed structure in New Line and Gauge Conversions and setting of Gate Lodges, Station Building etc. alongside the existing track. |
12.05.2017 |
|
|
Provision of transition curve in New Line & Gauge Conversion |
12.05.2017 |
|
|
Timelines for submission of pending DPRs. |
25.04.2017 |
|
|
Execution of projects – Earmarking of funds. |
01.05.2017 |
|
|
Targets for commissioning of New Line, Gauge Conversion and Doubling projects in 2017-18. |
27.04.2017 |
|
|
2017-18 - Sanction of Final Location Surveys |
20.02.2017 |
|
|
Revision in OHE parameters. |
31.01.2017 |
|
|
OHE Layout Planning in RE Works on Single Line |
27.01.2017 |
|
|
Reporting of New Line, Gauge Conversion and Doubling in monthly PCDO. |
09.01.2017 |
|
|
Survey estimate. |
18.11.2016 |
|
|
Land Acquisition under Section 108 of RFCTLARR Act, 2013 |
20.10.2016 |
|
|
Video Conferencing (16.09.2016) on Commissioning of NL, GC, DL & ROB |
09.09.2016 |
|
|
Additional Targets for Commissioning of NL,GC & DL projects 2016-17 |
06.07.2016 |
|
|
2014/W-I/Genl./SPV/States |
Model Joint Venture Agreement, Article of Association, Memorandum of Association. |
08.07.2016 |
|
Month-wise targets for achievement of New Line, Gauge Conversion and Doubling projects during 2016-17 |
22.06.2016 |
|
|
Sanction of Surveys |
13.05.2016 |
|
|
T&C of transfer of projects to PSUs (other than RVNL) |
05.05.2016 |
|
|
Letters regarding EPC Tender. |
04.05.2016 |
|
|
Tender for Works Contracts. |
04.05.2016 |
|
|
77 Doubling, 2 New Lines and 1 Gauge Conversion project included in Budget 2015-16 |
12.04.2016 |
|
|
Change of zone of Surveys |
12.04.2016 |
|
|
Para 105 of MR Budget Speech |
01.04.2016 |
|
|
2016-17 sanctioned Surveys of NL,GC,DL Projects |
31.03.2016 |
|
|
T&C of awarding Projects other than RVNL |
21.03.2016 |
|
|
59 Projects included in Rail Budget 2016-17. |
15.03.2016 |
|
|
Terms & Condition of transfer of projects to PSUs (other than RVNL). |
15.03.2016 |
|
|
Sanction of new line survey. |
23.02.2016 |
|
|
Projects to be taken up in SPV Model through State JVs. |
10.02.2016 |
|
|
Empowerment to Field Organisations (Works Contract Matters) Power for Awarding Single Tender in Projects targetted for completion. |
28.01.2016 |
|
|
Revised Guidelines for Blanketing Thickness |
19.10.2015 |
|
|
Installation of Display Board on important railway stations depicting project status. |
01.01.2016 |
|
|
Terms and conditions of assignment of projects to RVNL. |
31.12.2015 |
|
|
-- |
Memorandum of Understanding for formation of JV Company with Goveernment of Odisha. |
-- |
|
Sanction of doubling of SCR,SWR & NCR. |
18.11.2015 |
|
|
Sanction of doubling of SER & ECR. |
18.11.2015 |
|
|
Sanction of doubling of ECR, SECR & WCR |
18.11.2015 |
|
|
Sanction of doubling of CR, SER, ECoR, SWR & SER |
18.11.2015 |
|
|
-- |
Memorandum of Understanding for formation of JV Company with Government of Odisha. |
|
|
Fast track execution of 77 capacity augmentation projects sanctioned in 2015-16: Invitation of tender reg. |
17.11.2015 |
|
|
Fast track execution of 77 capacity augmentation projects sanctioned in 2015-16: Invitation of tender reg. |
23.10.2015 |
|
|
Revised power limit of approval of railway projects |
20.10.2015 |
|
|
Re-appropriation of funds under Demand No. 16 |
19.10.2015 |
|
|
Fast Track execution of 77 capacity augmentation projects sanctioned in 2015-16: Invitation of tender reg. |
12.10.2015 |
|
|
Invitation of tenders reg.- Fast track execution of 77 capacity |
09-10-2015 |
|
|
Powers of acceptance of Works Tenders. |
08.10.2015 |
|
|
RVNL Projects- Execution of yard remodeling works |
01.10.2015 |
|
|
Guidelines for economy in 77 DL, 2 NL & 1 GC Projects. |
29.09.2015 |
|
|
Fast Track execution of 77 capacity augmentation projects sanctioned in 2015-16. |
17.09.2015 |
|
|
Removal of unmanned and non-interlocked level crossings by way of construction of RUB/LHS. |
11.09.2015 |
|
|
Reiteration of guidelines for preparation of DPRs. |
06.08.2015 |
|
|
Fast Track execution of 77 capacity augmentation projects sanctioned in Budget 2015-16. |
03.08.2015 |
|
|
Re-appropriation of funds under Demand No. 16 |
26.06.2015 |
|
|
Submission of re-appropriation proposals of construction projects |
11.06.2015 |
|
|
Targets for commissioning of New lines, Gauge Conversion and |
29.05.2015 |
|
|
Execution of Projects-Earmarking of funds |
29.04.2015 |
|
|
77 Doubling, two new lines. One Guage Conversion projects proposed in Budget 2015-16. |
17.04.2015 |
|
|
Corrigendum - Change of Zone of surveys/works. |
08.04.2015 |
|
|
Guidelines for self rescue, safe exit/escape in tunnels more than 3 |
01.04.2015 |
|
|
Sanction of surveys. |
01.04.2015 |
|
|
Checklist for documents to be attached with the PETS/RETS/FLS |
27.03.2015 |
|
|
Sanction of Surveys |
25.03.2015 |
|
|
77 DL, 2 NL & 1 GC projects proposed to be included in 2015-16 letter |
24.03.2015 |
|
|
Submission of survey reports and estimate to Railway Board |
17.02.2015 |
|
|
Excess expenditure incurred by Railways over and above sanctioned detailed estimates during the course of execution of projects. |
27.01.2015 |
|
|
Corrective action to increase the formation width. |
13.01.2015 |
|
| 2014 | ||
|
Guidelines for utilization of forest land for non-forest purpose |
30.12.2014 |
|
|
Notification of Special Railway Projects under the Railways Amendment Act,2008 for Land Acquisition |
19.12.2014 |
|
|
Delegation of Powers. |
11.12.2014 |
|
|
Contractual Payment |
15.12.2014 |
|
|
Re-appropriation of funds |
24.11.2014 |
|
|
Sending reply to Board by Zonal Railways. |
24.11.2014 |
|
|
Declaration of 19 rail section as Strategic Lines by Defense Ministry |
05.11.2014 |
|
|
NL,GC,DL Target set for Zonal Railways and RVNL. |
03.11.2014 |
|
|
Setting up of Project Monitoring and Coordination Group in terms of |
28.10.2014 |
|
|
Guidelines for diversion of forest land for non-forest purpose and |
27.10.2014 |
|
|
Expeditious Completion of Surveys. |
09.10.2014 |
|
|
Finalisation of GAD. L-Section and overall scheme before calling tenders. |
29.09.2014 |
|
|
Closure of Meter Guage/Narrow Guage lines sanctioned for Guage Conversion. |
25.09.2014 |
|
|
Projects held up for want of wildlife and Forestry Clearances. |
24.09.2014 |
|
|
Sanctions of Surveys |
24.09.2014 |
|
|
2nd Revised Estimate(2nd RE) for Katakhal-Bhairabi GC Project (84.15mk) |
22.09.2014 |
|
|
Mandatory submission of Yard lay out plans alongwith estimates. |
02.09.2014 |
|
|
Review Meeting with CAO/Cs. |
28.08.2014 |
|
|
Details of Surveys completed during last 10 Years. |
27.08.2014 |
|
|
Surveys announced in Railway Budget 2014-15 |
27.08.2014 |
|
|
Sanction of Surveys. |
25.08.2014 |
|
|
PETS for Rail Connectivity to Chardham and Chardham Yatra (Gangotri, Yamnotri, Badrinath & Kedarnath via Dehradun & Karanprayag (660 Km). |
19.08.2014 |
|
|
Provisions of amenities for Persons with Disabilities (PwDs) in new station buildings. |
15.07.2014 |
|
|
Use of abbreviations in proposals sent by Railways. |
09.06.2014 |
|
|
Discrepancies in preparation of Estimates and use of Blanketing material. |
09.06.2014 |
|
|
Incurring of excess expenditure than the sanctioned amount by Railways. |
05.06.2014 |
|
|
Submission of Revised/Budget Estimates for ongoing surveys. |
22.05.2014 |
|
|
Ballastless Track in Tunnels. |
18.03.2014 |
|
|
Sanction of surveys. |
27.02.2014 |
|
|
Sanction of revision in length & cost of Astha-Bhopal Survey |
16.01.2014 |
|
|
Change in length & cost and name of survey for new line between Pandharpur_Vijapur via Mangalvedha (20 Km)-Central Railway's Blue Book item No. 33. |
07.01.2014 |
|
| 2013 | ||
|
Policy on Planning for 3rd Line/4th Line. |
17.12.2013 |
|
|
Preparation of survey reports/estimates |
23.10.2013 |
|
|
Guidelines for diversion of forest land for non-forest purpose under Forest Conservation Act, 1980-Modification in Para 4.4 and 2.2 (iii) thereof. |
10.10.2013 |
|
|
Policy relating to obtaining of clearance from the State Govt. of new survey reports - Rules of Opening of Sections. |
18.09.2013 |
|
|
Memorandum of Understanding between Railway and RVNL. |
06.09.2013 |
|
|
Authorisation of funds under Demand No. 16- Assets-Acquisition, Construction and Replacement during the year 2013-14. |
04.09.2013 |
|
|
Authorisation of funds under Demand No. 16- Assets-Acquisition, Construction and Replacement during the year 2013-14. |
04.09.2013 |
|
|
Re-appropriation of funds under Demand-16- Assets- Acquisition, Construction and Replacement during the year 2013-14. |
04.09.2013 |
|
|
Monitoring of Projects costing more than Rs. 1000 crore/Critical projects. |
22.08.2013 |
|
|
Increase in minimum head room of minor bridges-correction slip |
30.07.2013 |
|
|
Railway-wise Revised Targets for NL, GC & DL Projects. |
09.07.2013 |
|
|
Entering into contractual liabilities before land acquisition. |
03.07.2013 |
|
|
Specification for Gauge Conversion Projects. |
01.07.2013 |
|
|
Re-appropriation of funds |
28.06.2013 |
|
|
Inspection note of Shri Subodh Jain, Member Engineering, Railway Board during his visit to Eastern Railway on 07.06.2013 (No. 2013/ME/Insp. Note dated 20.06.2013) |
24.06.2013 |
|
|
Inspection note of Shri Subodh Jain, Member Engineering, Railway Board during his visit to Northeast Frontier Railway from 14.05.2013 to 15.05.2013 (No.2013/ME/Insp.Note dated 20.06.2013) |
24.06.2013 |
|
|
Inspection note of Shri Subodh Jain, Member Engineering, Railway Board during his visit to METRO Railway on 8th June, 2013 (No.INN-01/2013 dated 14.06.2013) |
19.06.2013 |
|
|
Gauge conversion-Blocking of MG/NG sections. |
18.06.2013 |
|
|
Elemination of level crossing from New Line' Gauge conversion and Doubling Projects. |
18.06.2013 |
|
|
Elimination of Level Crossings from New Line, Gauge Conversion and Doubling Projects. |
18-6-2013 |
|
|
E-tender for works contracts. |
05.06.2013 |
|
|
Sanction of New/Updating/Traffic Surveys in compliance of Budget Pronouncements and other surveys proposed |
29.04.2013 |
|
|
Execution of Projects-Earmarking of funds. |
22.04.2013 |
|
|
Sanction of surveys. |
03.04.2013 |
|
|
Old Policy Circulars |
21.03.2013 |
|
|
Authorisation of additinal funds under Demand 16 - Assets - Acquisition, Construction and Replacement during 2012-13. |
16.02.2013 |
|
|
Memorandum of understanding between Ministry of Railways and Rail Vikas Nigam Limited. |
10.01.2013 |
|
|
Introduction of Project Management Consultancy (PMC) Services on Indian Railways. |
09.01.2013 |
|
| 2012 | ||
|
Minutes of the Meeting of Expanded Board for Railways. |
20.12.2012 |
|
|
Re-appropriation of funds under Demand 16 - Assets - Acquisition, Construction and Replacement during the year 2012-13. |
29.11.2012 |
|
|
Survey Estimates. |
28.08.2012 |
|
|
Re-distribution of funds under Demand 16 - Assets - Acquisition, Construction and Replacement during the year 2012-13 |
06.08.2012 |
|
|
Re-distribution of funds under Demand 16 - Assets - Acquisition, Construction and Replacement during the year 2012-13 |
03.08.2012 |
|
|
Sanction of surveys. |
19.07.2012 |
|
|
Preparation of Survey Reports |
26.06.2012 |
|
|
Price Variation for supply of steel by contractors in Works Contracts. |
02.05.2012 |
|
|
Maintenance of new lines/doubling executed by RVNL and ensuring safety |
04.05.2012 |
|
|
Position of Estimates |
11.01.2012 |
|
| 2011 | ||
|
Maintenance of new lines/doubling executed by RVNL and ensuring safety |
01.11.2011 |
|
|
SAIL ex works price of steel |
05.09.2011 |
|
|
SAIL ex works price of steel |
19.08.2011 |
|
|
Re-appropriation of funds under Demand-16 |
02.08.2011 |
|
|
SAIL ex works price of steel |
15.07.2011 |
|
|
Re-appropriation of funds 2011-12 |
11.07.2011 |
|
|
Preparation of Estimates |
06.07.2011 |
|
|
Preparation of Survey Report |
26.06.2012 |
|
|
Elimination of level crossings from New Lilne, Gauge conversion and Doubling Projects. |
21.06.2011 |
|
|
SAIL ex works price of steel |
08.06.2011 |
|
|
SAIL ex works price of steel |
11.05.2011 |
|
|
SAIL ex works price of steel |
28.04.2011 |
|
|
SAIL ex works price of steel |
17.03.2011 |
|
|
SAIL ex works price of steel |
08.02.2011 |
|
|
Re-appropriation of funds for NL,GC & DL- Jan,2011 |
21.01.2011 |
|
|
SAIL ex works price of steel |
10.01.2011 |
|
| 2010 | ||
|
SAIL ex works price of steel |
07.12.2010 |
|
|
SAIL ex works price of steel |
23.11.2010 |
|
|
Revision of cost of PETS/updating of surveys. |
12.10.2010 |
|
|
Re-appropriation of funds under Demand 16- Assets- Acquisition, Construction and Replacement during the year 2010-11 |
02.10.2010 |
|
|
Re-appropriation of funds under Demand 16- Assets- Acquisition, Construction and Replacement during the year 2010-11 |
15.10.2010 |
|
|
Re-appropriation of Funds |
15.10.2010 |
|
|
Revision of cost of PETS/updating of surveys |
12.10.2010 |
|
|
Sanction of Surveys |
04.10.2010 |
|
|
SAIL ex works price of steel |
07.10.2010 |
|
|
SAIL ex works price of steel |
17.09.2010 |
|
|
SAIL ex works price of steel |
09.08.2010 |
|
|
SAIL ex works price of steel |
22.07.2010 |
|
|
Sanction for Surveys |
24.06.2010 |
|
|
SAIL ex works price of steel |
09.06.2010 |
|
|
SAIL ex works price of steel(April-2010). |
05.04.2010 |
|
|
SAIL ex works price of steel(Dec-09, Jan-2010, Feb-2010, Mar-2010). |
21.04.2010 |
|
|
Minutes of CAO/Cs/PCEs/ conference held in Railway Board on 10/11.05.2010 |
01.06.2010 |
|
| 2009 | ||
|
SAIL ex works price of steel |
09.11.2009 |
|
|
SAIL ex works price of steel |
14.10.2009 |
|
|
Traffic facility works |
14.09.2009 |
|
|
SAIL ex works price of steel |
07.09.2009 |
|
|
SAIL ex works price of steel |
05.08.2009 |
|
|
SAIL ex works price of steel |
23.07.2009 |
|
|
SAIL ex works price of steel |
04.06.2009 |
|
|
SAIL ex works price of steel |
11.05.2009 |
|
|
SAIL Ex Works Price of Steel |
16.04.2009 |
|
|
SAIL ex works price of steel |
19.03.2009 |
|
|
No.97/W-1/Survey/CR/Pt.III |
Revised rates for Final Location Survey(FLS) |
21.01.2009 |
|
Provision of passenger platforms in GC Projects. |
18.03.2009 |
|
|
Revised rates for Final Location Survey (FLS) |
21.01.2009 |
|
| 2008 | ||
|
Standardization of service buildings for S&T requirement. |
13.08.2008 |
|
|
Preparation of Estimates. |
25.07.2008 |
|