inner-banner-img
Circulars/ Letters
2025

2015/W-I/Genl./CORR.GM/Pt.III(a) (E- 3496960)

Execution of projects through EPC and Non-EPC Tender modes.  04.11.2025

2014/W-I/Genl./MoRTH (e-3115776)

Constitution of a Joint Working Group for Feasibility Assessment of Rail-and-Road Tunnel Projects at Alignment-Finalization/DPR Stage

30.09.2025

2022/W-2/ECR/FLS/28 (E-3398430)

Conduct of traffic study prior to undertaking Final Location Survey/DPR preparation.

29.09.2025

2018/W-I/Genl./PWay2019-20 (E- 3288187)

Use of second-hand 60 Kg rails in loop lines under sanctioned DPRs.

11.09.2025

2021/W-I/Genl./Policy(e-3360817)

Amendment in powers to sanction Feasibility Studies and Final Location Surveys (FLS) by Zonal Railways

08.09.2019

No. 2021/W-1/Genl./Audit Para(E-3367690)

Action Taken Report on CAG Audit Para - Ensuring site suitability and comprehensive assessment prior to execution of projects.

26.08.2025

2019/W-I/Genl./PCDO (E-3280535 )

Revised format of reporting progress through PCDO - 13.08.2025

13.08.2025

2015/W-I/Genl./CORR.GM /Pt.IV(e-3503719)

Clarification regarding invitation of Non-EPC tenders.- 07.08.2025

07.08.2025

2014/W-I/Genl./MoRTH (E-3115776)

Constitution of a Joint Working Group for Feasibility Assessment of Rail-and-Road Tunnel Projects at Alignment-Finalization/DPR Stag

31.07.2025

  1. 2019/W-I/Genl./CAO/C/Conf./Pt. (E-3503821)

Quality of infrastructure works 

29.07.2025

2021/W-/Genl./SurveyRates(E-3334464)

Revision of Rates for Final Location Surveys (FLS)

28.07.2025

2021/W-I/Genl./Miscellaneous (E-3371116)

Prior Approval for specified construction across Ganga River Under NMCG Authorities Notification, 2016

24.06.2025

2O25/W-I/Genl./Safety Precautions

Monsoon safety precautions at Construction worksites.

02.06.2025

2O2O/W-I/Genl./Forest&Wildlife

Simplification of procedures from MoEFCC

03.05.2025

2023/W-I/Genl./GatiShakti

Leveraging technology for proj monitoring

26.03.2025

2015/W-I/Genl./CORR.GM/Pt.III

EPC Tender

24.03.2025

2022/W-I/Genl./AMRITSAROVAR

Joint advisory by Rural development, Railway Board on Amrit Sarovar Phase-II.

24.02.2025

2020/W-I/Genl./Forest&Wildlife 

Final(Stage-II) approval of Forest Clearances in the projects

20.03.2025

2025/W-I/Genl./Bridges  (E-3484910)

Improving the planning and construction of major/important bridges and opening thereof.

10.01.2025

2024

2021/W-I/Genl./GatiShakti (E-3378115)

Re-organisation of Gati Shakti Units in Divisions

22.08.2024

2015/W-I/Genl./CORR.GM/Pt.III

EPC Tender

20.05.2024

2023/W-I/Genl./Misc

Fast tracking execution of Multi-tracking projects under three economic corridors (Energy, mineral and cement corridor, High Traffic Density routes, Rail Sagar Corridor)

16.04.2024

2018/W-I/Genl./Policy

Preparation and submission of Detailed Project Report (DPR) for New Line/Multi tracking/Gauge conversion.

10.01.2024

2023

2018/W-I/Genl./Policy

Policy on planning of 3rd/4th line

22.12.2023

2022/W-I/Genl./DPRproforma(e-3404238)

Proforma for submission of Detailed Project Report. 

13.12.2023

2023/W-I/Genl./Misc (E-3434089)

Construction of Escape Tunnel during Tunneling Works over Indian Railways.

22.11.2023

2021/W-I/Genl./GatiShakti

Corrigendum to Railway Board's letter no. 2021/W-I/Genl./Gati Shakti dt. 27.07.2022 for Setting up of Gati Shakti Units in Divisions

26.10.2023

2023/Proj./MUTP-III/VR-DRD/1/4

Clarification on exemption of Railway projects from the requirement of Environment Clearance (EC) and Coastal Regulation Zone (CRZ) Clearance as per Section 11 of Railways Act, 1989-reg.

13.10.2023

2021/W-I/Genl./PMG

Updation of PMG Portal.

19.06.2023

2019/W-1/Genl./Land-LC

Mutation and completion of land records for land acquired for railway projects

08.06.2023

2021/W-I/Genl./Gatishakti Pt.

Corrigendum to Operationalization of GatiShakti Units in the Divisions Board's letter of even number.

29.03.2023

2020/W-I/Genl./Forest & Wildlife (e-3336964)

Clarification on Right of Way (RoW) mentioned in guidelines dated 10.03.2022 issued by MoEFCC.

21.03.2023

2022

2018/W-I/Genl./Landacquisition

Execution of new line projects policy.

25.11.2022

2022/W-I/Genl/DPR Proforma (E-off: 3404238)

Proforma for preparation and submission of Detailed Project Report for New Line/ Doubling/ Multi Tracking/ Gauge Conversion.

02.09.2022

2021/W-I/Genl./Gatishakti

Setting up of Gati Shakti Units in Divisions.

27.07.2022

2022/W-I/Genl./Gatishakti

Submission of document for projects costing more than Rs. 500 crore each.

27.07.2022

2022/W-I/Genl./PRAGATI

Use of Soil and silt excavated from Amrit Sarovar for infrastructure projects reg.

13.06.2022

2021/W-I/Genl./Gatishakti

Setting up of Gati Shakti Unit under DRM/Agra

09.06.2022

2021/W-I/Genl./POLICY (E-Offc-3360817)

Comprehensive Project Appraisal System for sanctioning new projects by factoring in the "Network Effect".

06.06.2022

No.2022/W-I/Genl./Targets.

New Line, Gauge conversion and Doubling works targeted for commissioning during FY 2022-23 and plan to increase capital expenditure on these projects.

25.05.2022

2017/W-I/Genl./Board Meetings

Setting up of Gati Shakti Units in Khurda, Bilaspur, Delhi & Bengaluru divisions.

16.05.2022

2017/W-I/Genl./Board Meetings

Engineering Traffic Allowance (ETA) & Block for infrastructure works.

16.05.2022

2021/W-I/Genl./POLICY (E-Offc-3360817)

Detailed Project Report (DPRs)/ Detailed Estimates (DE)/ Revised Estimates (RE)/ of New/Sanctioned Projects

12.05.2022

2022/W-I/Genl./infrastructure projects

Faster implementation of infrastructure projects.

06.05.2022

2021/W-I/Genl./POLICY (E-Offc-3360817)

Detailed Project Report (DPR) for projects

06.05.2022

2021/W-I/Genl./POLICY (E-Offc-3360817)

Revision in Cost & Quality of works in various projects.

25.03.2022

2019/W-I/Genl./Policy Pt. 1 (E-offc-3289535)

Provision of Ballastless track (BLT) in tunnels.

11.03.2022

2021/W-I/Genl./FLS (E-offc-3371701)

Sanction for Final Location Surveys (FLS)

08.03.2022

2015/W-I/Genl./CORR.GM/Pt. III (E-offc-3149695)


EPC Tender

04.03.2022

2021/W-I/Genl./TF/Works (E-offc-3336630)

Sanction of sub-works against Umbrella Works of 2020-21 of Traffic Facility Plan Head(PH-16)

15.02.2022

2021/W-I/Genl./FLS (E-offc-3371701)

Sanction for Final Location Surveys (FLS)

08.02.2022

2021/W-I/Genl./FLS (E-offc-3371701)

Sanction of Preliminary Engineering cum Traffic Survey for Nemisharanya to Farrukhabad via Hardoi new BG line (112 km)

07.01.2022

2021/W-I/Genl./FLS (E-offc-3371701)

Sanction for Final Location Survey for Imphal - Moreh new BG line.

05.01.2022

2021

2021/W-I/Genl./FLS (E-offc-3371701)

Sanction for Final Location Surveys (FLS)

30.12.2021

2021/W-I/Genl./FLS (E-offc- 3371701)

Sanction for Final Location survey (FLS)

17.12.2021

2021/W-I/Genl./FLS (E-offc- 3371701)

Sanction of Preliminary Engineering cum Traffic (PET) surveys.

26.11.2021

2021/W-I/Genl./Addl.funds for survey

Additional fund allotment in RE 2021-22 for important/ recently sanctioned Final Location Survey Works.

26.11.2021

2021/ED(ProjM)/Misc/Committee

Construction of new Bridge during Doubling.

12.11.2021

2021/W-I/Genl./Policy

Provision of Facilities for Track Machine Staff

27.10.2021

2021/W-I/Genl./FLS (E-office - 3371701)

Sanction of Final Location Survey.

21.10.2021

2021/W-I/Genl./FLS (E-office - 3371701)

Sanction of Final Location Survey.

11.10.2021

2020/W-I/Genl./TF/Works (E-office - 3336630)

Sanction of works against umbrella Work of 209-20 of Traffic Facility Plan Head (PH-16)

29.09.2021

2018/W-I/Genl/Policy

Adoption of modern methods for construction of tunnels

10.09.2021

2018/W-I/Genl/MoSPI

Updation of data on Portals

05.07.2021

2020/W-I/Genl/Survey Rates

Revision of Rates and scope of Final Location Survey (FLS)

30.06.2021

2020/W-I/Genl/Survey Rates

Revision of Rates for Final Location Survey (FLS)

16.06.2021

2020/W-I/Genl./PMO (E-offc- 3334070)

 List of Railway projects monitored through PRAGATI (25.03.2015 to 24.02.2021)

10.06.2021

2020/W-I/Genl./PMO

Monitoring of Projects by PMO through PMREF portal

04.06.2021

 2020/W-I/Genl./Vision 2024

NOMINATION OF HAG OFFICER FOR MONITORING OF PROJECTS DATED 28.05.2021

28.05.2021

2019/W-I/Genl/Cost Sharing

D.O. Letters to CMs regarding Projects on Cost Sharing Projects.

03.05.2021

2012/W-I/Surveys/Budget

Sanction of Final Location Survey for works under Doubling Plan Head.

22.03.2021

2021/W-I/Genl/Target

Target Date of Completion of projects.

19.02.2021

2020/W-I/Genl./Vision 2024

Nomination of HAG Officers for monitoring of Priority Projects of Vision 2024 Dated 20.01.2021 

20.01.2021

2020/W-I/Genl/Survey Report

Use of Modern Survey Technologies for Survey of New Line, Gauge Conversion & Doubling Projects.

06.01.2021

2020/W-I/Genl./Vision 2024

Vision 2024 Document

28.12.2020

2015/W-1/Genl./Corr.GM/Part-2

Carrying out FLS and submission of DPRs by Zonal Railways.

07.10.2020

98/W-1/Genl./0/30 Pt.

Maintenance of newly commissioned New Line/Doubling/Gauge Conversion sections.

14.09.2020

2013/W-I/Genl/0/30/Pt.II

Preparation of estimates and Excess Expenditure incurred by Railway over and sanctioned detailed estimates during the course of execution of projects.

11.05.2020

98/W-I/Genl/O/30-Pt.

General Instructions regarding surveys of railway projects.

18.02.2020

2013/W-I/Genl/0/30 Pt.II

Platfrom lenght at Railway Stations for new line, gauge conversion & doubling projects

25.02.2020

2018/E-1/Genl/Land Acquisition

Execution of new line projects-Policy regarding.

05.02.2020

2017/W-I/Genl./Sfety/Policy

Platform level for new Construction/Platform raising works.

31.01.2020

2012/W-I/Genl./Surveys/Budget

Sanction of Final Location Surveys for sanctioned work of New Line Plan Head.

21.01.2020

2012/W-1/Genl./Surveys Budget

Sanction of Final Location Surveys for sanctioned work of Doubling Plan Head.

16.01.2020

2013/W-I/Genl/O/30/Pt.II

Construction of formation for Doubling on DFC feeder routes.

18.12.2019

2019-B-104

Corrigendum to Works, Machinery & Rolling Stock Programme 2019-20

12.12.2019

2013/W-I/Genl/0/30 Pt.II

Elimination of level crossings in Doubling Projects.

10.10.2019

2018/W-I/Genl./Land Acquisition/Pt. 1(3265888)

Land acquisition for Railway projects - draft correction to App, III and Paras 822-836 of Engineering Code

13.06.2019

2019/W-I/Genl./land-LC

Level Crossing on new line projects.

10.06.2019

2019/W-I/Genl./ViIKAS SAMVAD

Review of Important Insfrastructure Projects through VIKAS SAMVAD

27.03.2019

2015/W-I/Genl/CORR.GM/P.III

Execution of New Line, guage Conversion and Doubling Projects.

25.02.2019

2018/W-I/Genl./Target 2018-19

Commissioning NewLine Gauge Conversion and Doubling.

 

2015/W-1/Genl./Corr.GM/Pt.II

Approval and Execution of projects of New Line, Gauge Coversion and Doubling included in Budget 2018-19 and later subject to requisite approvals appearing with # mark in Pink Book.

30.01.2019

 

 

 

2015/W-I/Genl./Corr.GM/Pt.

Speed Policy framework for Indian Railways.

06.12.2018

2017/W-I/Genl/Policy

Execution of Works under various Plan Head costing more than Rs. 3 Crores.

05.12.2018

2015/W-I/Genl./CORR.GM/Pt.III

EPC Tender.

30.11.2018

DO No. 2018/W-I/Genl/Target 2018-19

Commissioning of New Line, Gauge Conversion & Doubling.

26.11.2018

2018/W-1/Genl./CAO(C)Conf.

Review meeting of commissioning of New Line / Gauge Conversion / Doubling on 01.11.2018

12.11.2018

2018/W-I/Genl/CAO/review meeting

Infrastructure Works Review video conference (VC) with GMs of Zonal Railways and CMDs of PSUs held on 11th September 2018.

26.09.2018

2018/W-I/Genl./Policy

Policy Guidelines on Loop line and Siding.

07.09.2018

2018/W-I/Genl/Land Acquisition/Pt I (e Off-3265888) 

Land acquisition for Railway Projects in tunneling portion.

06.09.2018

2018/W-I/Genl./Policy

Policy guidelines - Execution and algnment of 3rd Line Projects.

04.09.2018

2013/PL/19/1 (Policy) 

Policy Guidelines - Execution and alignment of 3rd Line Projects.

05.07.2018

2017//W-I/Genl./Misc.

Execution of New Line Projects Policy

29.06.2018

2013/W-I/Genl/0/30 Pt.-II

Degree of curvature for new projects of New Line, Guage Conversion and Doubling and Level crossing in New Line.

28.05.2018

2018/W-I/Genl./Target 2018-19              (CRB's Letter to Rly Units) 

CR,   ECOR,   ECR,   ER,   NCR,   NER,   NFR,   NR,   NWR,   SCR - (Revised),   SECR,   SER,   SR,  SWR-(Revised),   WCR,   WR - (Revised),  IRCON,   RITES,   RVNL

09.05.2018

2013/W-I/Genl/0/30 Pt.II

Degree of curvature for new projects of New Line, Guage Conversion and Doubling.

04.05.2018

2012/W-I/Genl./Surveys/Budget

Sanction of Final Location Surveys-2018

20.02.2018

2017/W-I/Genl./Nodal Officer

Indian Railways Nodal Officer (project-wise).

18.01.2018

2017/W-I/Genl./Policy

Flash Butt welding of Rails.

18.12.2017

2017/W-I/Genl./Misc.

Execution of New Line Projects - Land Issues with State Govts.

06.12.2017

2015/W-I/Genl./Corr.GM/Pt.

Policy regarding Construction of 3rd and 4th line.

29.11.2017

2017/W-I/Genl./Monthly Achievement

Details to be included in Monthly PCDO.

27.11.2017

2015/W-I/Genl./Corr.GM/Pt.II

Approvals and execution of 54 NL, GC DL projects included in Budget 2017-18.

16.11.2017

2013/W-I/Genl./0/30 Pt.II

Platform level for new construction- Platform raising work.

02.11.2017

2017/W-I/Genl./Policy

Execution of New Line projects.

30.10.2017

2014/W-I/Genl./Group of Infra

Clarification of MoEF&CC with respect of Gauge Conversion works.

27.09.2017

2016/W-I/Genl./Budget (RE & BE)

Booking Head for Expenditure on land acquisition provided free of cost by State Governments.

15.09.2017

2017-B-106

Works-Re-appropriation (CAP & EBR(IF) – Sept 2017.

06.09.2017

2017/SIG/WP/Double Dist.

Provision of Second Distant Signal on ‘B’ Route and doubling/tripling projects.

22.08.2017

2017/W-I/Genl./Policy/1

Execution of Yard Remodelling works in all New Line, Gauge Conversion and Doubling projects.

11.08.2017

2015/W-I/Genl./Corr.GM/Pt.

Project implementation and Monitoring.

25.07.2017

2017/W-I/Genl./Policy/1

Inclusion of TRD Estimate in NL,GC & DL proposals in already electrified/under electrification territory

05.07.2017

2017/WI/JV/Genl/State JV 

Standard MOA                           Standard AOA

02.06.2017

2017/W-I/Genl./Survey/1

Delegation of powers to CAO(C)s for Tender to Survey. 

22.05.2017

2013/W-I/Genl./O/30 Pt.II

Provision of fixed structure in New Line and Gauge Conversions and setting of Gate Lodges, Station Building etc. alongside the existing track.

12.05.2017

2013/W-I/Genl./O/30 Pt.II 

Provision of transition curve in New Line & Gauge Conversion

12.05.2017

2015/W-I/Genl./CORR.GM/Pt.III 

Timelines for submission of pending DPRs.

25.04.2017

2017/W-I/Genl./Budget 

Execution of projects – Earmarking of funds.

01.05.2017

2016/W-I/Genl./Monthly Achievement

Targets for commissioning of New Line, Gauge Conversion and Doubling projects in 2017-18.

27.04.2017

2012/W-I/Genl./Surveys/Budget

2017-18 - Sanction of Final Location Surveys

20.02.2017

2016/W-II/ECoR/Misc/24

Revision in OHE parameters.

31.01.2017

2016/W-I/Genl./NL-RE

OHE Layout Planning in RE Works on Single Line

27.01.2017

2016/W-I/Genl./Corr.

Reporting of New Line, Gauge Conversion and Doubling in monthly PCDO.

09.01.2017

2012/W-I/Genl./Survey/Budget 

Survey estimate.

18.11.2016

2015/W-2/SCR/NL/22 dated 20.10.2016

Land Acquisition under Section 108 of RFCTLARR Act, 2013

20.10.2016

2016/W-I/Genl./Monthly Achievement

Video Conferencing (16.09.2016) on Commissioning of NL, GC, DL & ROB

09.09.2016

2016/W-I/Genl./Monthly Achievement

Additional Targets for Commissioning of NL,GC & DL projects 2016-17 

06.07.2016

2014/W-I/Genl./SPV/States

Model Joint Venture Agreement, Article of Association, Memorandum of Association.

08.07.2016

2016/W-I/Genl./Monthly Achievement

Month-wise targets for achievement of New Line, Gauge Conversion and Doubling projects during 2016-17

22.06.2016

2012/W-I/Genl./Surveys/Budget

Sanction of Surveys

13.05.2016

2015/W-I/Genl./CORR.GM/Pt.III 

T&C of transfer of projects to PSUs (other than RVNL)

05.05.2016

2015/W-I/Genl./CORR.GM/Pt.III

Letters  regarding EPC Tender.

04.05.2016

2015/W-I/Genl./CORR.GM/Pt.III 

Tender for Works Contracts.

04.05.2016

2015/W-I/Genl./CORR.GM/Pt.III

77 Doubling, 2 New Lines and 1 Gauge Conversion project included in Budget 2015-16

12.04.2016

2013/W-I/Genl./Surveys/Budget

Change of zone of Surveys

12.04.2016

2015/W-I/Genl./CORR .GM Pt.III 

Para 105 of MR Budget Speech

01.04.2016

2015/W-I/Genl./Surveys/Budget 

2016-17 sanctioned Surveys of NL,GC,DL Projects

31.03.2016

2015/W-I/Genl./Presentation 

T&C of awarding Projects other than RVNL

21.03.2016

2015/W-I/Genl./CORR .GM Pt.III 

59 Projects included in Rail Budget 2016-17.

15.03.2016

2015/W-I/Genl./Presentation/Pt 

 Terms & Condition of transfer of projects to PSUs (other than RVNL).

15.03.2016

2012/W-I/Genl/Survey Budget/Pt-III

Sanction of new line survey.    

23.02.2016

2014/W-I/Genl./SPV/States

Projects to be taken up in SPV Model through State JVs.

10.02.2016

2011/CE-I(Spl.)/CT/0/4

Empowerment to Field Organisations (Works Contract Matters) Power for Awarding Single Tender in Projects targetted for completion.

28.01.2016

RS/G/108/Heavy Axle Load

Revised Guidelines for Blanketing Thickness

19.10.2015

2016/W-I/Genl./Display

Installation of Display Board on important railway stations depicting project status.

01.01.2016

2015/W-I/Genl./Presentation/Pt.  

Terms and conditions of assignment of projects to RVNL.

31.12.2015

--

Memorandum of Understanding for formation of JV Company with Goveernment of Odisha.

--

2015/W-I/Genl./EBR/1 

Sanction of doubling of SCR,SWR & NCR.

18.11.2015

 2015/W-I/Genl./EBR/3  

 Sanction of doubling of SER & ECR.

18.11.2015

2015/W-I/Genl./EBR/2

Sanction of doubling of ECR, SECR & WCR

18.11.2015

2015/W-II/DL/DPR/CCEA/40 

 Sanction of doubling of CR, SER, ECoR, SWR & SER

18.11.2015

--

Memorandum of Understanding for formation of JV Company with Government of Odisha.

 

2015/W-I/Genl/CORR.GM/Pt.III

Fast track execution of 77 capacity augmentation projects sanctioned in 2015-16: Invitation of tender reg.

17.11.2015

2015/W-I/Genl./CORR.GM/Pt.III

Fast track execution of 77 capacity augmentation projects sanctioned in 2015-16:  Invitation of tender reg.

23.10.2015

2015/O&M/5/4

Revised power limit of approval of railway projects

20.10.2015

2015-B-106

Re-appropriation of funds under Demand No. 16

19.10.2015

2015/W-I/Genl/CORR.gm/Pt.

Fast Track execution of 77 capacity augmentation projects sanctioned in 2015-16: Invitation of tender reg.

12.10.2015

2015/W-I/Genl./CORR.GM/Pt-III

Invitation of tenders reg.- Fast track execution of 77 capacity
augmention projects sanctioned in 2015-16.

09-10-2015

2007/CE-I/CT/0/20/1

Powers of acceptance of Works Tenders.

08.10.2015

2004/WI/RVNL/10

RVNL Projects- Execution of yard remodeling works

01.10.2015

2015/W-I/Genl/Corr.GM/Pt.

Guidelines for economy in 77 DL, 2 NL & 1 GC Projects.

29.09.2015

2015/W-1/Genl/Corr. GM/Pt.III

Fast Track execution of 77 capacity augmentation projects sanctioned in 2015-16.

17.09.2015

2013/W-I/Genl/o/30 Pt-II

Removal of unmanned and non-interlocked level crossings by way of construction of RUB/LHS.

11.09.2015

2015/W-I/Genl./Corr.GM/Pt.III

Reiteration of guidelines for preparation of DPRs.

06.08.2015

2015/W-I/Genl./Corr.GM/Pt.III

Fast Track execution of 77 capacity augmentation projects sanctioned in Budget 2015-16.

03.08.2015

2015-B-106

Re-appropriation of funds under Demand No. 16

26.06.2015

2013/W-I/Genl./0/30-Pt.-II

Submission of re-appropriation proposals of    construction projects
to Railway Board.

11.06.2015

2013/W-I/Genl./Commissioning

Targets for commissioning of New lines, Gauge  Conversion and
Doubling Projects

29.05.2015

2015/W-I/Genl/Budget

Execution of Projects-Earmarking of funds

29.04.2015

2015/W-I/Gen/Corr.GM

77 Doubling, two new lines. One Guage Conversion projects proposed in Budget 2015-16.

17.04.2015

2013/W-I/Genl./Surveys/Budget

Corrigendum - Change of Zone of surveys/works.

08.04.2015

2014/W-I/Genl./NF/LMG-SCL/Tunnel-10

Guidelines for self rescue, safe exit/escape in tunnels more than 3
kms in length.

01.04.2015

2013/W-I/Genl./Survey/Budget

Sanction of surveys.

01.04.2015

98/W-I/Genl./0/30-Pt.-I

Checklist for documents to be attached with the   PETS/RETS/FLS
reports.

27.03.2015

2012/W-1/Genl/Surveys/Budget/Pt.

Sanction of Surveys

25.03.2015

2015/W-I/Genl./Corr.GM

77 DL, 2 NL & 1 GC projects proposed to be included in 2015-16 letter
dtd 30.3.15 & 24.03.2015

24.03.2015

98/W-I/Genl/0/30 Pt.-I

Submission of survey reports and estimate to Railway Board

17.02.2015

90/W-2/NL/E/5/Vol.II Pt.

Excess expenditure incurred by Railways over and above sanctioned detailed estimates during the course of execution of projects.

27.01.2015

98_W-1/Genl/O/30 Pt.I

Corrective action to increase the formation width.

13.01.2015

2014

2014/W-I/Genl./Group of Infra

Guidelines for utilization of forest land for non-forest purpose

30.12.2014

2010/LML/12/8

Notification of Special Railway Projects under the Railways Amendment Act,2008 for Land Acquisition

19.12.2014

F(X)-II/2014/PW/6

Delegation of Powers.

11.12.2014

2013/W-I/Genl./0/30 Pt.II

Contractual Payment

15.12.2014

No. 2014-B-106

Re-appropriation of funds

24.11.2014

2004/W-I/Genl./Staff Matters

Sending reply to Board by Zonal Railways.

24.11.2014

2013/W-I/NFR/Strategic Lines

Declaration of 19 rail section as Strategic Lines by Defense Ministry

05.11.2014

2014/W-I/Genl./Target 14-15

NL,GC,DL Target set for Zonal Railways and RVNL.

03.11.2014

2014/W-1/Genl./Budget 14-15/Item

Setting up of Project Monitoring and Coordination Group in terms of
Budget Pronouncement 2014-15 vide item No.

28.10.2014

2014/W-1/Genl./EC/22

Guidelines for diversion of forest land for non-forest purpose and
compensatory afforestation.

27.10.2014

2012/W-I/Genl./Surveys/Budget

Expeditious Completion of Surveys.

09.10.2014

91/W-I/Genl/0/30-Pt.II

Finalisation of GAD. L-Section and overall scheme before calling tenders.

29.09.2014

91/W-I/Genl/0/30-Pt.II

Closure of Meter Guage/Narrow Guage lines sanctioned for Guage Conversion.

25.09.2014

2014/DW-I/Genl/Group of Infra

Projects held up for want of wildlife and Forestry Clearances.

24.09.2014

2012/W-I/Genl./Surveys/Budget

Sanctions of Surveys

24.09.2014

97/W-1/GC/NF/4

2nd Revised Estimate(2nd RE) for Katakhal-Bhairabi GC Project (84.15mk)

22.09.2014

2013/W-I/Genl/0/30 Pt.II

Mandatory submission of Yard lay out plans alongwith estimates.

02.09.2014

2014/W-I/Genl/CAO/C Mtg.

Review Meeting with CAO/Cs.

28.08.2014

Survey Report

Details of Surveys completed during last 10 Years.

27.08.2014

2012/W-I/Genl./Surveys/Budget

Surveys announced in Railway Budget 2014-15

27.08.2014

2012/W-I/Genl/Surveys/Budget

Sanction of Surveys.

25.08.2014

2012/W-I/Genl/Survey/Budget/ Pt.II

PETS for Rail Connectivity to Chardham and Chardham Yatra (Gangotri, Yamnotri, Badrinath & Kedarnath via Dehradun & Karanprayag (660 Km).

19.08.2014

2013/W-I/Genl/0/30 Pt.II

Provisions of amenities for Persons with Disabilities (PwDs) in new station buildings.

15.07.2014

2013/W-I/Genl/0/30 Pt.II

Use of abbreviations in proposals sent by Railways.

09.06.2014

2013/W-I/Genl/0/30 Pt.II

Discrepancies in preparation of Estimates and use of Blanketing material.

09.06.2014

2013/W-I/Genl/0/30 Pt.II

Incurring of excess expenditure than the sanctioned amount by Railways.

05.06.2014

2013/W-I/Genl./Survey

Submission of Revised/Budget Estimates for ongoing surveys.

22.05.2014

98/W-I/Genl./0/30/Pt.I

Ballastless Track in Tunnels.

18.03.2014

2012/W-1/Genl,/Surveys/Budget

Sanction of surveys.

27.02.2014

2013/WI/Genl./Survey

Sanction of revision in length & cost of Astha-Bhopal Survey

16.01.2014

2013/WI/Genl./Survey

Change in length & cost and name of survey for new line between Pandharpur_Vijapur via Mangalvedha (20 Km)-Central Railway's Blue Book item No. 33.

07.01.2014

2013

98/W-1/Genl/0/30 Pt.1

Policy on Planning for 3rd Line/4th Line.

17.12.2013

2010/W-I/NL/SWR/MK

Preparation of survey reports/estimates

23.10.2013

2012/W-I/Genl/Coalfield-Rail connectivity/Pt.I

Guidelines for diversion of forest land for non-forest purpose under Forest Conservation Act, 1980-Modification in Para 4.4 and 2.2 (iii) thereof.

10.10.2013

98/W-1/Genl./0/30-Pt. 1

Policy relating to obtaining of clearance from the State Govt. of new survey reports - Rules of Opening of Sections.

18.09.2013

2004/W-1/RVNL/10

Memorandum of Understanding between Railway and RVNL.

06.09.2013

2013-B-106/2

Authorisation of funds under Demand No. 16- Assets-Acquisition, Construction and Replacement during the year 2013-14.

04.09.2013

2013-B-106/1

Authorisation of funds under Demand No. 16- Assets-Acquisition, Construction and Replacement during the year 2013-14.

04.09.2013

2013-B-106

Re-appropriation of funds under Demand-16- Assets- Acquisition, Construction and Replacement during the year 2013-14.

04.09.2013

2012/W-I/Genl/Review of Projects (Part) 1000 Cr.

Monitoring of Projects costing more than Rs. 1000 crore/Critical projects.

22.08.2013

2005/WI/RVNL/5

Increase in minimum head room of minor bridges-correction slip

30.07.2013

2013/W-I/Genl./Targets/2013-14

Railway-wise Revised Targets for NL, GC & DL Projects.

09.07.2013

98/W-1/Gen/O/30.Pt.-1

Entering into contractual liabilities before land acquisition.

03.07.2013

2013/W1/Spec. of GC/RNY-MZS

Specification for Gauge Conversion Projects.

01.07.2013

2013-B-106

Re-appropriation of funds

28.06.2013

2013/W-1/TP/ME/3

Inspection note of Shri Subodh Jain, Member Engineering, Railway Board during his visit to Eastern Railway on 07.06.2013 (No. 2013/ME/Insp. Note dated 20.06.2013)

24.06.2013

2013/W-1/TP/ME/2

Inspection note of Shri Subodh Jain, Member Engineering, Railway Board during his visit to Northeast Frontier Railway from 14.05.2013 to 15.05.2013 (No.2013/ME/Insp.Note dated 20.06.2013)

24.06.2013

2013/W-1/TP/ME/1

Inspection note of Shri Subodh Jain, Member Engineering, Railway Board during his visit to METRO Railway on 8th June, 2013 (No.INN-01/2013 dated 14.06.2013)

19.06.2013

98/W-I/Genl/0/30 Pt.I

Gauge conversion-Blocking of MG/NG sections.

18.06.2013

2013/W-1/Genl/0/30 Pt.II

Elemination of level crossing from New Line' Gauge conversion and Doubling Projects.

18.06.2013

2013/W-I/Genl./0/30 pt-II

Elimination of Level Crossings from New Line, Gauge Conversion and Doubling Projects.

18-6-2013

98/W-I/Genl/0/30/Pt.

E-tender for works contracts.

05.06.2013

2013/W-I/Genl/Survey

Sanction of New/Updating/Traffic Surveys in compliance of Budget Pronouncements and other surveys proposed

29.04.2013

2013/W-I/Genl/Budget

Execution of Projects-Earmarking of funds.

22.04.2013

2013/W-I/Genl/Survey

Sanction of surveys.

03.04.2013

Old Policy Circulars

Old Policy Circulars

21.03.2013

2012-B-106

Authorisation of additinal funds under Demand 16 - Assets - Acquisition, Construction and Replacement during 2012-13.

16.02.2013

2011/W-1/RVNL/4

Memorandum of understanding between Ministry of Railways and Rail Vikas Nigam Limited.

10.01.2013

2006/W-1/Genl./D.P.-Pt.1

Introduction of Project Management Consultancy (PMC) Services on Indian Railways.

09.01.2013

2012

2011/W-I/Genl./EBR

Minutes of the Meeting of Expanded Board for Railways.

20.12.2012

2012-B-106

Re-appropriation of funds under Demand 16 - Assets - Acquisition, Construction and Replacement during the year 2012-13.

29.11.2012

97/W1/Surveys/CR/Pt.III

Survey Estimates.

28.08.2012

2012-B-106

Re-distribution of funds under Demand 16 - Assets - Acquisition, Construction and Replacement during the year 2012-13

06.08.2012

2012-B-106

Re-distribution of funds under Demand 16 - Assets - Acquisition, Construction and Replacement during the year 2012-13

03.08.2012

2012/W-I/Genl./Surveys/Budget

Sanction of surveys.

19.07.2012

2010/W-1/Genl/Surveys/12-13

Preparation of Survey Reports

26.06.2012

No.85/W-1/CT/7/Pt-1

Price Variation for supply of steel by contractors in Works Contracts.

02.05.2012

98/W-1/Gen/O/30.Pt.

Maintenance of new lines/doubling executed by RVNL and ensuring safety

04.05.2012

Postition as on 10-01-2012

Position of Estimates

11.01.2012

2011

98/W-1/Gen/O/30.Pt.

Maintenance of new lines/doubling executed by RVNL and ensuring safety

01.11.2011

85/W-I/CT/7/Pt.I

SAIL ex works price of steel

05.09.2011

85/W-I/CT/7/Pt.I

SAIL ex works price of steel

19.08.2011

2011-B-106

Re-appropriation of funds under Demand-16

02.08.2011

85/W-I/CT/7/Pt.I

SAIL ex works price of steel

15.07.2011

2011-B-106

Re-appropriation of funds 2011-12

11.07.2011

FX-II/2011/Est/1

Preparation of Estimates

06.07.2011

2010/W-1/Genl./Surveys/12-13

Preparation of Survey Report

26.06.2012

2011/W-1/Gen/Circulars

Elimination of level crossings from New Lilne, Gauge conversion and Doubling Projects.

21.06.2011

85/W-I/CT/7/Pt.I

SAIL ex works price of steel

08.06.2011

85/W-I/CT/7/Pt.I

SAIL ex works price of steel

11.05.2011

85/W-I/CT/7/Pt.I

SAIL ex works price of steel

28.04.2011

85/W-I/CT/7/Pt.I

SAIL ex works price of steel

17.03.2011

85/W-I/CT/7/Pt.I

SAIL ex works price of steel

08.02.2011

No.2010-B-106

Re-appropriation of funds for NL,GC & DL- Jan,2011

21.01.2011

No.85/W-I/CT/7/Pt.I

SAIL ex works price of steel

10.01.2011

2010

No.SAIL/85/W-1/CT/7/Pt-I

SAIL ex works price of steel

07.12.2010

No.SAIL/85/W-1/CT/7/Pt-I

SAIL ex works price of steel

23.11.2010

2009/W-I/Genl./Surveys/09-10

Revision of cost of PETS/updating of surveys.

12.10.2010

2010-B-106

Re-appropriation of funds under Demand 16- Assets- Acquisition, Construction and Replacement during the year 2010-11

02.10.2010

2010-B-106

Re-appropriation of funds under Demand 16- Assets- Acquisition, Construction and Replacement during the year 2010-11

15.10.2010

2010-B-106

Re-appropriation of Funds

15.10.2010

2009/W-I/Genl/Surveys/09-10

Revision of cost of PETS/updating of surveys

12.10.2010

No. 2010/W-I/Genl./Surveys/10-11

Sanction of Surveys

04.10.2010

No.SAIL/85/W-1/CT/7/Pt-I

SAIL ex works price of steel

07.10.2010

No.SAIL/85/W-1/CT/7/Pt-I

SAIL ex works price of steel

17.09.2010

No.SAIL/85/W-1/CT/7/Pt-I

SAIL ex works price of steel

09.08.2010

No.SAIL/85/W-1/CT/7/Pt-I

SAIL ex works price of steel

22.07.2010

No.2009/W-I/Genl/Surveys/09-10

Sanction for Surveys

24.06.2010

No.SAIL/85/W-1/CT/7/Pt-I

SAIL ex works price of steel

09.06.2010

No.SAIL/85/W-1/CT/7/Pt-I

SAIL ex works price of steel(April-2010).

05.04.2010

No.85/W-1/CT/7/Pt-I

SAIL ex works price of steel(Dec-09, Jan-2010, Feb-2010, Mar-2010).

21.04.2010

2007/W-1/Genl./Conference

Minutes of CAO/Cs/PCEs/ conference held in Railway Board on 10/11.05.2010

01.06.2010

2009

No.85/W-I/CT/7/Pt.I

SAIL ex works price of steel

09.11.2009

No.85/W-I/CT/7/Pt.I

SAIL ex works price of steel

14.10.2009

No. 2007/W-1/Genl/Estimates-Pt.

Traffic facility works

14.09.2009

No.85/W-I/CT/7/Pt.I

SAIL ex works price of steel

07.09.2009

No. 85/W-I/CT/7/Pt.I

SAIL ex works price of steel

05.08.2009

No. 85/W-I/CT/7/Pt.I

SAIL ex works price of steel

23.07.2009

No.85/W-I/CT/7/Pt.1

SAIL ex works price of steel

04.06.2009

No.85/W-I/CT/7/Pt.I

SAIL ex works price of steel

11.05.2009

No. 85/W-I/CT/7/Pt.I

SAIL Ex Works Price of Steel

16.04.2009

No. 85/W-I/CT/7/Pt.1

SAIL ex works price of steel

19.03.2009

No.97/W-1/Survey/CR/Pt.III

Revised rates for Final Location Survey(FLS)

21.01.2009

91/W-i/Genl.0/30Pt.II

Provision of passenger platforms in GC Projects.

18.03.2009

97/W-1/Survey/CR/Pt.III

Revised rates for Final Location Survey (FLS)

21.01.2009

2008

No.98/W1/Genl/0/30-Pt.

Standardization of service buildings for S&T requirement.

13.08.2008

No.98/W1/Genl/0/30-Pt

Preparation of Estimates.

25.07.2008