inner-banner-img
Running of Stock (Misc)
Circular No.Date Subject
2024
2018/CEDO/ORI/01 09.02.2024 Castle Rock- Kulem Stations – Relaxation to existing conditions for running Passenger/Goods trains in the Ghat Sections between Castle Rock – Kulem stations of Hubballi Division,SWR.
2022
2019/CEDO/SR/07/O 11.05.2022 Revised Policy Instruction for running Double Stack Dwarf Containers (DSDC) (up to max ht. of 4877 mm from rail level and width of 2600 mm) over Zonal Railways.
2022/CEDO/ORI/O/IR-DFCCIL/Exigencies 18.04.2022 Running of Passenger services on DFCs network during exigencies
2021
2020/CEDO/SR/12 27.05.2021 Running of CC+8+2t/22.9t Axle Load Wagon up to a Maximum speed of 75 kmph- Clarification Regarding Installation of WILD
70/WDO/ORI/RO/IVol.VII 27.01.2021 Increase in Speed of Loop lines from presently 15 kmph to 30 kmph
2019/CE-I/Misc./6/CRS (dev &Impl.) 21.11.2019 Implementation of Web - Based Application - CRS Sanction Monitoring System.
2017/Infra/6/33 18.09.2019 Operation of Rolling Stock on DFC
2019/CEDO/Push Pull /0/1 28.05.2019 Introduction of Push Pull Trains
2018/CEDO/SR/PC 6/JSC 20.08.2018  Joint Safety Certificate (JSC)
2018/CE-II/TS/25T 14.03.2018 Track Structure for Operation of 25T Axle Load Trains.
2009/CEDO/SR/48 01.11.2012 Sanction for 'regular' operation of 22.9t axle load Broag Gauge Bogie Open Wagon Type BOXNHL.
2007/M(C)/137/16 Vol.1 18.07.2012 Withdrawal of LHB EOG rake of Sampooran Kranti Express Train No. 12393/94 due to overloading of General Second Class Coaches.
D.O. No. MR/M/59/2006 10.08.2006 Running of Heavy Axle Freight Wagons on Different Sections of Indian Railways.
68/WDO/SC/1 15/16.04.1968 Increase of Speed Over Curves on the BG
68/WDO/SC/1 15/16.04.1968 Increase of Speed over Curves on the BG
Source : Ministry of Railways (Railway Board) CMS Team Last Reviewed on: 20-05-2024