2021
File No. Subject Date of Issue
2015/CE-IV/ROB/78/Pt.1 Expediting GAD approval of ROBs on NH-Revision of RRCAS Application 27.05.2021
2015/CE-IV/ROB/78/Pt.1 Expediting GAD approval of ROBs on NH-Revision of RRCAS Application 26.05.2021
2015/CE-IV/ROB/78/Pt.1 Revised steps for GAD approval of ROBs on NH 01.05.2021
2008/CE-I/LX/50 Provision of Rubberized surfacing at Level Crossings (LCs) 05.04.2021
2015/CE-IV/ROB/78/Pt.1 Minutes of Meeting held on 24.03.2021 between DG/MoRTH and PED/Bridge, Railway Board-Approval of GAD reg. 25.03.2021
2015/CE-IV/ROB/78/Pt.1 Minutes of Meeting held on 16.03.2021 between DG/MoRTH and PED/Bridge, Railway Board-Approval of GAD reg. 25.03.2021

2017/CE-IV/RUB/88

Water logging & drainage problem in RUB/Subways.

18.02.2021

2008/CE-I/LX/50

Provision of Rubberised surface at LC.

15.02.2021

2021/CE-IV/ROB-RUB/estimate/63

Huge variation estimates of ROB/RUB works before & after the award of tender.

03.02.2021
 

2015/CE-IV/ROB/78 pt.

Revalidation of Approved GAD of MoRTH/NHAI.

02.02.2021

2015/CE-IV/ROB/78 pt.

Retionalization of maintenance changes for ROBs/RUBs to be constructed totally at MoRTH/NHAI cost & GAD of which submitted to Railway before 10.11.2014.

15.01.2021

2020/CE-IV/LC/GQ-GD

ROB/RUB works on GQ-GD routes through EBR.

11.01.2021