| 2023 | ||
| Letter No. | Date | Subject |
| 2015/CE-IV/ROB/78(Pt.)-I | 27.12.2023 | Issues regarding Planning/Execution/Maintenance of ROB/RUB and construction of LHS. |
| 2017/CE-IV/LX/Misc/244(LCs)Pt. | 19.12.2023 | Planning of elimination of LCs between Sonnagar-Gomoh section |
| 2017/CE-IV/LX/Misc/244 (Pt.) | 13.12.2023 | Undertaking to be taken from State Govt. for cost sharing ROB/RUB works. |
| 2015/CE-IV/ROB/DFCCIL | 14.11.2023 | Provision of additional subways (without LCs) in existing estimate of work of “Raising of speed to 160/200Kmph on existing NDLS-HWH Route incl. CNB-LKO-A mission to achieve a travel time of 12 hrs. |
| 2017/CE-IV/LX/Misc/244 (Pt)II. | 08.11.2023 | Safety Audit of Grade Separator/ROBs-Provision of Safety Fencing over NH-Corridors |
| 2015/CE-IV/ROB/78 (Pt.)-I | 08.11.2023 | Safety Audit of Grade Separator/ROBs-Provision of Safety Fencing over NH-Corridors. |
| 2017/CE-IV/RUB/88 | 30.10.2023 | Regarding approval of General Arrangement Drawings, Structural Design & Drawing and Launching Scheme of NHAI/MoRTH etc. |
| 2017/CE-IV/RUB/88 | 04.10.2023 | Policy for Road crossing works (ROB/RUB/LHS/FOBs/Subway) to eliminate Level Crossings (LSs) and Trespassing areas under PH-30. |
| 2023/CE-IV/LX/Misc/244 (LCs)pt | 22.09.2023 | Sanction of itemized work under Umbrella in Plan Head-30. |
| 2015/CE-IV/ROB/78 (RORACS | 19.09.2023 | Implementation of “Rail-Road Crossing GAD Approval System” for State Government & UTs. |
| 2023/CE-IV/LC/Misc/244(LCs)pt. | 11.09.2023 | Sanction and Execution of Additional crossings. |
| 2023/CE-IV/Misc | 04.09.2023 | Adoption of already approved drawings of thrust bed and RCC box by box Pushing technique. |
| 2017/CE-IV/RUB/88 | 04.09.2023 | Proposals for construction of Subway at Trespassing locations. |
| 2017/7/CE-IV/88 | 01.09.2023 | Construction of Road under Bridge (RUB)/Limited height Subway (LHS) by Box-pulling Method. |
| 2023/CE-IV/Misc./Estimates | 10.08.2023 | Details to be provided along-with Detailed/Revised estimates. |
| 2023/CE-IV/Misc. | 10.08.2023 | Precaution and Safety at ROB/RUB/Bridge work sites. |
| 97/CE-I/ROB/158(Policy) Pt. II | 28.06.2023 | Precaution and safety Measures to be observed during & after execution of ROB/RUB/Bridge Works. |
| DO No. 2015/CE-IV/ROB/78(Pt.) | 09.06.2023 | Elimination of level crossing falling in yard. |
| 2015/CE-IV/ROB/78 (Pt.) | 01.06.2023 | Preferred Span Configuration & Structural for ROBs by NHAI. |
| 2023/CE-IV/Misc./Background Note | 18.05.2023 | Department related parliamentary standing committee (DrPSC) on transport, tourism and culture-meeting on 'construction of road-over bridges (ROBs) road-under-bridges (RUBs), service roads and review of road service guidelines etc. |
| 2023/CE-IV/Misc./Background Note | 12.05.2023 | Department related parliamentary standing committee (DrPSC) on transport, tourism and culture-meeting on 'construction of road-over bridges (ROBs) road-under-bridges (RUBs), service roads and review of road service guidelines etc. |
| 2017/CE-IV/RUB/88 | 27.04.2023 | Preventing water-logging at Subways/RUBs. |
| 2023/CE-IV/ROB-RUB/States/Kerela | 28.03.2023 | Progress of Road over/ under bridges in Kerela State. |
| 2023/CE-IV/ROB-RUB/States/Orissa | 23.03.2023 | Progress of Road over/Under bridges in Orissa State. |
| 2015/CE-IV/ROB/78 (pt) | 23.03.2023 | Preferred span configuration &structural for ROBs ny NHAI. |
| 2023/CE-IV/ROB-RUB/102 | 22.03.2023 | Progress of Road over/under bridges in Gujarat State. |
| 2016/CE-IV/ROB/192(Bihar) | 21.03.2023 | Progress of road over/under bridges in Bihar State. |
| 2015/CE-IV/ROB-RUB/Misc/49 | 16.03.2023 | Minutes of meeting held n 22.01.2023 in connection with issues figuring in the Group of infrastructure meeting scheduled on 24.01.2023 |
| 2023/CE-IV/Misc | 13.03.2023 | Review of Cabinet Secretariat for pending unresoved issue in infrastructure projects in various States/UTs. |
| 2015/CE-IV/RUB/78(Setu Bandnan) | 06.03.2023 | Construction of ROBs/RUBs on state roads CRIF scheme onder "SETU BANDHAN" programme signing of Tripartite MOU-standard operating procedure (SOP). |
| 2017/CE-IV/LX/Misc/244(LCs) Pt. | 02.03.2023 | Policy for road crossing works (ROB/RUB/LHS?FOBs/Subway) to elimiate level crossings and Trespassing areas under PH-30. |
| 2023/CE-IV/ROB-RUB/170 | 01.03.2023 | Acton points noted during Capacity Building Conference of CAO/Construction held on 04.02.2023 at IRICEN, Pune. |
| 2023/PH-30 & 32/Umbrella | 21.02.2023 | Regarding processing of works on IRPSM (PH-30). |
| 2023/PH-30 &32/Umbrella-23-24 | 17.02.2023 | Regarding distribution of umbrella cost of budget year 2023-24. |
| 2023/CE-II/TK/Fencingpolicy | 16.02.2023 | Policy guidelines for providing safety fencing along the track. |
| 2015/CE-IV/ROB-RUB/Misc | 15.02.2023 | Issues relaed to MoRTH/NHAI. |
| 2017/CE-IV/LX/Misc/244(LCs)Pt. | 14.02.2023 | Amendment to Board's policy letter no. 2017/CE-IV/LX/Misc./244(LCs) Pt. dated 28.07.2022 (policy for level crossing (Broad Gauge) Elimination works). |
| 2015/CE-IV/RUB/78(Setu Bandnan) | 21.01.2023 | Memorandum of understanding (MOU) for proposed implementation of RDBs/RUBs on state roads under CRIF scheme under "SETU BANDHAN" Programme-signing of Tripartite MOU-standard operating procedure (SOP). |
| 2017/CE-IV/LX/Misc./244(LCs)Pt. | 06.01.2023 | ROB/RUB works in lieu of Level crossings. |
| Source : Ministry of Railways (Railway Board) CMS Team Last Reviewed on: 11-07-2024 | ||