| S.No. | Letter No. | Subject | Date |
|---|---|---|---|
| 1 | No. 2017/CE-IV/RUB/88 | Preventing water-logging at Subways/Road under Bridges (RUBs). | 13.12.2024 |
| 2 | No. 2017/CE-IV/LX/Misc./244 (LCs) Pt. | Procedure for processing of proposals in IRPSM and sanctioning of itemized works against Umbrella Works under Plan Head – 30 (Road Safety Works – ROB/RUB) for existing Umbrella & Onwards. | 12.11.2024 |
| 3 | No. 2014/CE-IV/ROB/250 (Estt. Design) | Type of foundation for Road Over Bridges | 12.11.2024 |
| 4 | No. 2024/CE-IV/LX/TVU-Census | TVU census of Level Crossings by AI based system. | 26.09.2024 |
| 5 | No. 2017/CE-IV/LX/Misc./244 (LCs) Pt. | Procedure for processing of proposals in IRPSM and sanctioning of itemized works against Umbrella Works under Plan-Head – 30 (Road Safetry Works-ROB/RUB) for existing Umbrella & onwards. | 06.09.2024 |
| 6 | No. 2017/CE-IV/RUB/88 (RDSO) | Preventing water-logging at Subways.0 | 02.09.2024 |
| 7 | No. 2017/CE-IV/LC/Misc./244 (LCs) Pt. | Policy for Road crossing works (ROB/RUB/LHS/FOBs/Subway) to eliminate Level Crossings and Trespassing areas under PH-30. | 19.08.2024 |
| 8 | No. 2017/CE-IV/LX/Misc./244 (LCs) | Approval of GAD for ROB/RUB/Non-LC locations. | 13.08.2024 |
| 9 | No. 2017/CE-IV/LX/Misc./244 (LCs) pt. | Joint-less box construction for LHS/RUB. | 19.07.2024 |
| 10 | No. 2017/CE-IV/RUB/88 | Preventing water-logging at Subways/Road Under Bridges (RUBs). | 01.07.2024 |
| 11 | No. 2017/CE-IV/RUB/88 | Preventing water-logging at Subways/Road Under Bridges (RUBs). | 11.06.2024 |
| 12 | No. 2017/CE-IV/LX/Misc./244(LCs) Pt. | Checking feasibility of providing Subway/RUB/ROB for elimination of LC Gates and Preparing Detailed Project Report. | 22.05.2024 |
| 13 | No. 2024/CE-IV/Utility-Shifting/ROB-RUB (E.O. No.: 3459904) |
Shifting of utilities and fixed structures in Railway portion for the construction of Road Over Bridges (ROB) and Road Under Bridges (RUB) |
14.05.2024 |
| 14 | No. 2024/CE- IV/Misc |
Use of standard RDSO RH Girders fit for 50 kmph speed during execution of LNS/Subway in Zonal Railways. | 02.05.2024 |
| 15 | No. 2017/CE-IV/RUB/88 |
Construction of Road under Bridge (RUB)/Limited height Subway (LHS) |
26.04.2024 |
| 16 | No.2017/CE-IV/LX/Misc/244 (LCs) Pt.I |
Construction of Lesser cost ROB to eliminate level crossings on lower TVU roads |
24.04.2024 |
| 17 | No. 2017/CE-IV/RUB/88 |
Construction of Road under Bridge (RUB)/Limited height Subway (LHS) by innovative methods |
16.04.2024 |
| 18 | No. 2017/CE-IV/LX/Misc/244 (LCs) Pt |
Sanction of Subways at Trespass location and others |
16.04.2024 |
| 19 | No.2017/CE-IV/RUB/88 |
15-Days Special Inspection Drive for deficiencies in Subways over IR |
09.04.2024 |
| 20 | No.2017/7/CE-IV/88 |
Construction of Road Under Bridge (RUB)/Limited Height Subway (LHS) by Sliding |
19.03.2024 |
| 21 | 2017/CE-IV/LX/Misc/244(LCs) Pt |
Execution of Road Safety Works in lieu of Level Crossings-Policy |
11.03.2024 |
| 22 | 2015/CE-IV/ROB/78(Pt.)-I |
GAD (General Arrangement Drawing) for ROB/RUBs in RRCAS portal |
08.03.2024 |
| 23 | No. 2017/CE-IV/RUB/88 |
Trial of Precast construction for faster execution of ROBs/RUBs |
29.02.2024 |
| 24 | 2017/CE-IV/RUB/88 |
Preventing water logging at Subways/RUBs |
28.02.2024 |
| 25 | 2017/CE-IV/LX/Misc/244 (Pt.) |
Demand for widening of ROB/RUB by the Road owning Authority during rebuilding/replacement. |
20.02.2024 |
| 26 | 2015/CE-IV/ROB/78(Pt.)-I | Sample GAD for ROB and RUB | 11.01.2024 |