| Compendium-IV | ||
|
CIRCULAR NO. |
SUBJECT |
DATE |
| 2020/EEM/180/4 | Regarding system Improvement for approval of firms in RDSO vendor directory. | 15.04.2021 |
| 2019/EEM/183/2 | System improvement for deployment of manpower in the contracts of operation & maintenance | 12.02.2021 |
| 2006/Elect(G)/150/9/PtI/Loose | System improvement in contractual work of rewiring of Railway Quarter | 11.01.2021 |
| 2013/Elect(G)/150/13/PtII | Specifications and vendor development for Lifts/Escalators | 30.12.2020 |
| 2019/Elect(G)/150/3/Escal. | Type Test of Escalator | 05.11.2020 |
| 2018/Elect(G)/150/2 | Nomination of Nodal Railway for facilitation % expedeting of solar projects over IR | 21.10.20 |
| 2013/Elect(G)/150/13 Pt.II | Pre-Qualification criteria for elevators and lifts | 13.10.20 |
| 2015/Elect(G)/150/7 | Implementation of Energy Efficiency Projects in Railway Buildings | 29.09.20 |
| 2018/Elect(G)/150/2 Pt.IV | Nomination of Nodal Railway along with Duty list of Nodal Officer for facilitation & expediting of solar projects over IR. |
28.09.20 |
| 2018/Elect(G)/150/1/Pt | Adoption of CPWD’s “General specifications for Electrical Works Part-IV Substation-2013” |
28.09.20 |
| 2009/Elect(G)/150/7/Pt. | Adaption of Smart Prepaid metering system for Railway installations | 03.06.20 |
| 2012/Elect(G)/150/1/Pt.III | Procurement of economical power for Non-Traction for Zonal Railways & PUs | 02.06.20 |
| 2009/Elect(G)/150/13PT.III | Utilization of unsued vacant land for setting up of solar plants over IR | 15.04.20 |
| 2008/Elect(G)/172/1 | Improvement if illumination levels at par with airport standard at all Stations of Indian Railways | 17.03.20 |
| 2019/Elect(G)/150/7 (Prepaid Meters) | Recovery of security deposit from outsider agencies/Govt. Departments/PSUs for prepaid meters | 13.01.20 |
| 2008/Elect(G)/172/1 | Improvement of illumination levels at Stations of IR | 09.01.20 |
| 2012/Elect(G)/114/1 | Policy for Temprature setting of Air Conditioners in Railway Buildings | 30.09.19 |
| 2006/Elect(G)/150/9/Pt.I | Procurement of High Volume Low Speed (HVLS) Fans | 21.08.19 |
| 2011/Elect(G)/150/3 (Dup) | Setting up of public E-vehicle charging station at Railway Station and Railway office complexes | 21.08.19 |
| 2006/Elect(G)/150/5 | Disposal of released lights/fittings due to 100% LED lights replacement | 29.08.19 |
| 2006/Elect(G)/150/5 | Disposal of released lights/fittings due to 100% LED lights replacement | 26.07.19 |
| Policy guidelines regarding generation of SMS alert to control whenever lift/escalator is out of order | 25.06.19 | |
| 2013/Elect(G)/150/13/Pt.II | Pre-qualification criteria for Elevators/Lifts | 13.06.19 |
| 2006/Elect(G)/150/5/Par | Procurement of LED based luminaires on Indian Railways | 26.0419 |
| Policy for provision of escalators at railway stations | Policy for provision of escalators at railway stations | 06.03.19 |
| 2008/Elect(G)/172/1 | Improvement of illumination levels at all stations of Indian Railways | 14.02.19 |
| 2006/Elect(G)/150/5/Part | Policy regarding Provisioning of LED lights in Railway installations. | 12.02.19 |
| 2012/Elect(G)/150/4/Pt.VI | Provision of new platforms shelters, Workshops & Maintenance depot sheds and their replacement with Solar panels | 27.09.18 |
| 2006/Elect(G)/150/5/Part | Procurement of LED based luminaires on Indian Railways | 31.07.2018 |
| 2013/Elect(G)/150/13/Pt.I (Dup.) | Policy for provision of escalators at railway station | 07.06.2018 |
|
Provision of New Platforms shelters, Workshops & Maintenance Depot sheds and their replacement with solar panels |
16/05/2018 | |
|
Joint Procedure Order with Timelines for Granting Permission for Over Dimensional Consignment (ODC) on multi Axle trailers through Railway Level Crossing – Revision thereof. |
26/04/2018 | |
|
Energy Efficiency guidelines for all new Railway Buildings |
08/03/2018 | |
|
Air conditioning for officers chamber |
21/02/2018 | |
|
Policy regarding one-time provision of LED lights in Railway residential quarters |
10/11/2017 | |
|
Implementation of energy efficiency projects in railway stations and buildings -finalization of model Performance Agreement-reg |
12/09/2017 | |
|
Provision of power supply for online monitoring of rolling Stock (OMRS) equipments |
21/08/2017 | |
|
Use of energy efficient lighting system and other appliances by vendors and in Railway installations |
06/07/2017 | |
|
Implementation of energy efficiency projects in railway stations -finalization of model Performance Agreement-reg |
03/03/2017 | |
|
Running of Fans |
14/02/2017 | |
|
Joint Procedure Obligation for granting permission to Overhead power line crossings over Railway track and underground cable crossings of railway tracks on IR. |
30/01/2017 | |
|
Supervision/Way leave charges for Underground Cable crossings of Railway Tracks |
02/12/2016 | |
|
Provision of Air-Conditioning in railway offices, buildings and other railway centres |
01/12/2016 | |
|
Use of Astrological switch for energy saving |
09/09/2016 | |
|
Scale of electrical fittings for the existing staff quarters -standardization thereof |
21/06/2016 | |
|
Exploitation of solar energy at all possible spaces on rooftop and by sides of the railway buildings |
26/05/2016 | |
|
2012/Elect(G)/150/4/Pt.IV |
Rationalization of General service items to be dealt by Energy Management Dte. (EEM) of RDSO |
03/12/2015 |
|
Use of LED based tube light fittings over Indian Railways |
27/03/2015 | |
| Source : Ministry of Railways (Railway Board) CMS Team Last Reviewed on: 15-04-2021 | ||