inner-banner-img

Track-II Policy Matters

Track-II Policy Matters

Track-II
2025
2022/TK-II/22/7/3 Quality Procurement-UDM Utilisation 17.07.2025
2025/TK-II/22/1/2 Uniformity in procurement of ERCs on Indian Railways 11.06.2025
2024/TK-II/22/26/1/BLT Adoption of Ballast less Tracks on IR. 10.05.2025
2020/Track-III/TK/2 Implementation of Rolling Block Plan guidelines 03.04.2025
2022/Track-II/22/7/3 Warranty claims and rejections on IREPS-UDM Module
 
03.02.2025
2024
2020/Track-III/TK/2 Rolling Block Plan guidelines
 
06.12.24
2013/TK-II/22/7/4(Gen. Policy) TPI of PSC Sleepers as Pilot Projects 22.07.2024
2010/TK-II/22/11/1/1 Procurement of Sleepers and Modern Fastenings as a set. 07.08.2024
2013/TK-II/22/7/4 Gen. Policy Letter to all ZRs for adoption of HVN liner 02.08.2024
2023
2024/TK-II/22/7/2 Third Party Inspection of Elastic Rail Clips (ERCs) 12.06.2024
2019/TK-II/22/11/26/8630933/Pathri/NR
Sleeper Payment-Old Vs New Zonal Contract 09.05.2023
2022/Track-II/22/11/1(3407429)
Modification in Procurement of civil engg item by Stores Dte 08.02.2023
2022
2004/Track-II/22/11/5(Shifting)
EPC procurement of track items 28.10.2022
2017/TK-II/22/14/1
Changes in clause of PVC payment in HTS wire 22.06.2022
2022/TK-II/22/7/1
Decontrol-Retention of RDSO controlled items. 22.02.2022
2016/TK-II/22/11/68/71292/Bhanpuri
Improving record keeping and supervision of sleeper 17.01.2022
2021
2013/TK-II/22/19/1 (Specification) Composite Sleeper Procurement Modified Policy 28.10.2021
2021/TK-II/22/6/1 Meeting Wider Sleeper design modification 26.08.2021
2017/TK-II/22/14/1 PVC payment methodology 08.04.2021

2004/TK-II/22/11/5(Shifting)

 

2004/TK-II/22/11/5

Revised Policy for concrete sleeper plants on Indian Railways

Policy guidelines for intra-railway shifting of existing concrete sleeper plant

19.02.2021

 

22.02.2006

2020
2013/TK-II/22/7/2 Gen.Policy Pt.III  Procurement of P.Way fittings 12.06.2020
2004/TK-II/22/11/5 (Shifting) Policy of setting up new Concrete Sleeper Plant 05.12.2019
Enclosure of DLOA of CS-172-Para-5 Wider Sleeper Tender-CS-172-Special Condition of Contract 07.06.2019
2004/TK-II/22/5/7 6.2 mm CGRSP- serviceability criteria & action in case of premature failure. 15.04.2019
2013/TK-II/22/7/2/ Gen. Policy Centralized procurement of Track item for field trial of P.way component. 07.02.2019

2004/TK-II/22/5/7 Policy circulars 

In-service serviceability criteria for 10mm CGRSP and action to be taken in case pre-mature failure.

16.01.2019
2016/TK-II/22/6/6 Policy circulars Policy for DP extension proposal of Zonal Railways. 31.10.2018
2016/TK-II/22/2/2 Policy direction regarding production of wider & Heavier Sleeper. 17.10.2018

2016/TK-II/22/11/68/71292/Bhanpuri

Improving record keeping & supervision of CSPs

24.09.2018

2017/TK-II/22/14/2 GST against sleepers supplied to RVNL 12.09.2018
2013/TK-II/22/2/2

Payment for wider sleeper- CS-169/2016

11.09.2018 & 30.05.2018
2011/TK-II/22/11/1/Specification Inspection of Concrete Sleeper Plants 25.07.2018
2013/TK-II/22/2/2Pt.II Implementation of wider & heavier sleeper RT-8527 09.07.2018
2013/Track-III/TK/11/Pt.1 Mandatory RDSO approval of all specifications Track Machine & Civil Engg. Items 26.06.2018
 2013/Track-II/22/7/2 Gen Policy Pt

Procurement of P. Way Fittings

12.03.2018
2017/TK-II/22/14/2 Goods and Service Tax (GST) related issues in Tender No. CS-169 for Manufacture and Supply of PSC sleepers 27.12.2017
2013/TK-II/22/19/1 Pt. (Specification) Use of Composite Sleepers on girder bridges and its proliferation 13-12-2017
2017/TK-II/22/14/1 Review the tender/contract conditions of Concrete Sleeper Tender CS-169/2016 in wake of implementation of GST by Government of India and New series of WPI indices (2011-12) by economic adviser. 24.10.2017
2016/Tk-II/22/11/2 Double vetting of indents of P.Way items 05.09.2017
2012/Tk-II/22/14/2 Clarifications regarding GST provisions for supply contracts 25.07.2017
2013/TK-II/22/7/2 (Gen. Policy) Provisions in ERC supply contracts to ensure raw material supply from approved sources. 19.04.2017
2013/Tk-II/22/19/1 Pt.(Specification) Regular Adoption of Composite Sleepers on Indian Railways 30.01.2017
2011/TK-II/22/11/1/Specification Amendment in IRS-T-39 regarding maximum cement content 03.06.2016
2013/TK-II/22/19/1 (specification) Regular adoption of composite sleepers on Indian Railways 23.05.2016
2013/TK-II/22/7/4 (Gen Policy) New Policy on development and adoption of new products/technologies for track/bridge related itesms 09.03.2016
2013/TK-II/22/7/2 (Gen.Policy) Uploading of P.O. details on " Track Management System (TMS)". 06.01.2016
2004/Tk-II/22/5/7 Furnishing the status of procurement of track fitting/items in monthly PCDO 01.01.2016
2015/TK-II/22/11/4(Policy) Sleeper procurement -Private & PSUs 31.12.2015
2014/Tk-II/22/7/1 (Policy) Applicability of Inspection Charges and General Charges on sleepers being issued to construction projects and private parties 16.11.2015
2012/Tk-II/22/7/3/Track fitting Revised PVC formula for ERC-Mk III and Mk V 23.07.2015
2004/TK-II/22/5/7 IRICEN’s Session No. 15301 – Seminar for CE/TP, held on 7th & 8th May, 2015 – Clarification regarding “Serviceabilty Creteria of CGRSP” 07.07.2015
2012/Tk-II/22/7/3/Track fitting Revised PVC formula for ERC-Mk III and Mk V 25.05.2015
 2011/Tk-II/22/11/4/Policy Sale of released serviceable surplus 52 kg PSC sleepers for use of private parties 27.04.2015
2014/TK-II/22/7/1 Policy

Applicability of inspection and other charges on sleeper being issued to construction projects and private parties

10.03.2015
2011/TK-II/22/11/4 Policy

Sale of released serviceable surplus 52 kg PSC sleepers for use of private parties

10.03.2015
2011/TK-II/22/5/1/PVC Calculation of H1/H0 at the time of payment of price variation against sleeper contract CS-166/13 10.02.2015
2013/Tk-II/22/7/2/Genl. Policy Pt. Quality checks of CSPs 19.11.2014
2013/Tk-II/22/7/2/Genl. Policy Quality audit and checks of CSPs 18.11.2014
2012/Tk-II/22/7/3/Track Fittings Revision of certain “Special Tender Conditions” related to procurement of P.way items 10.11.2014
2012/TK-II/22/15/3/ 71136/Ambuja Utilization of 53-S Grade Ordinary Portland Cement supplied by M/s Ambuja, Rawan Plant 03.11.2014

2011/TK-II/22/5/1/PVC

Revision of review of mix design sleepers

16.9.14

2013/TK-II/22/7/2/GP/pt

Oversight inspection of Antri

3.9.14

2002/TK-II/22/7/1/TSC/pt

Guide lines of criteria GFN & metal liners 

2.9.14

2013/TK-II/22/11/32/71165/NCR

Oversight inspection of Antri

30.7.14

2001/TK-II/22/7/7/pt.ii

Placing of educational orders on firms

5.6.14

2014/TK-II/22/7/1/policy

Inspection  & passing of PSC sleepers for Pvt. parties

8.5.14

2002/TK-II/22/7/1

Policy for using GFN liners

30.4.14

2012/TK-II/22/15/1/71134/JP

Action taken of 53-S grade cement

28.3.14

2011/TK-II/22/5/1PVC

Clarification of various issues

4.3.14

2004/TK-II/22/5/7

 System improvements

4.3.14

2004/TK-II/22/5/7

Use of composite rubber pads

23.12.13

2011/TK-II/22/5/1

Reimbursement of VAT ON CEMENT

10.12.13

96/TK-II/22/4/2 Pt.II

Specification of metal liner for ERC

28.11.13

2009/TK-II/22/11/1/policy

Road freight for special cement

20.11.13

2013/TK-II/22/7/2/GP

Use of ERC MK-V

18.11.13

2010/TK-II/22/11/4

Equipment of STR

14.11.13

2004/TK-II/22/5/7

Composite GRSP

22.10.13

2011/TK-II/22/5/1

Considering of CST/VAT-CS-162

16.9.13

2013/TK-II/22/7/2/GP vol.II

Stamping of spring steel /RINL

24.5.13

2011/TK-II/22/11/1/Spe.

Revision of IRST-39

11.3.13

2007/TK-II/22/11/3 land licence policy

Land licence policy

1.3.13

2009/TK-II/22/5/2

Security measures of GFN

1.2.13

2010TK-II/22/11/4

Implementation of STR for PSC sleeper

17.1.13

2009/TK-II/22/11/52/71098/SR

Judgment of supreme court

31.12.12

2011/TK-II/22/11/4/MF

Sale of second hand sleepers

21.12.12

2009/TK-II/22/11.21/71067/ER

Placement of additional order

9.8.12

2012/TK-II/22/7/3 TK fittings

Track renewal estimate

27.7.12

2008/TK-II/22/11/77/71038/SWR

Determination of contract CS-160/07

22.6.12

2012/TK-II/22/18/1/Lok Sabha Question

Premature failure of sleeper

14.6.12

2009/TK-II/22/11/52/71098/SR

Contract award CS-162/08

11.6.12

2010/TK-II/22/11/4

Implementation of technical requirement

18.5.12

2012/TK-II/22/6/3

Audit para no. 3.5.3/07-08

4.5.12

2005/TK-II/22/11/7/Policy

Calculation of PVC-CS-162

27.4.12

2009/TK-II/22/11/1/policy

Pre-mature failure of sleepers Chota  ambona

12.4.12

2012/TK-II/22/11/2

Pre-mature failure of sleepers Champa-Baradwar

9.4.12

2009TK-II/22/11/1 Policy

Pre-mature failure of sleepers

9.4.12

2009/TK-II/22/1/2

Procurement of of P.Way for Metro Railway

28.12.11

2004/TK-II/22/5/7

Procurement of GRSP

9.12.11

2011/TK-II/22/21/1

Metal Liner in costal areas

8.11.11

2003/TK-II/22/11/78 pt. A

Composite sleepers

3.10.11

2011/TK-II/22/11/4 Policy

Disposal of MF  sleepers

6.9.11

2010/TK-II/22/11/4/STR

Schedule of technical  requirement for  manufacture of PSC sleeper

26.8.11

2011/TK-II/22/5/1/PVC

Procurement of GR sole plate

16.6.11

2011/TK-II/22/5/1/PVC/GRSP

Revise  PVC formula GRSP

27.5.11

2011//TK-II/22/7/1/LF

Price variation formula of P. Way items

19.5.11

 2011/ TK-II/22/7/1

Price variation formula of P. Way items

15.04.11

2001/TK-II/22/7/2 pt

Annual requirement of ERC

27.8.10

 2008 /TK-I/22/11/8pt

Deficiencies  observed by RDSO

14.05.10

2001/ TK-II/22/5/7

Adoption of composite rubber pad

09.06.10

2001/ TK-II/22/7/2/G. Policy

Review of consignee end policy

26.03.10

2001/ TK-II/22/7/7pt

Development order

17.03.10

2005/ TK-II/22/11/7policy

Manufacture & supply of PSC line sleeper for Pvt. parties

05.03.10

99/TK-II/22/7/6

Adoption of New track fittings items

19.09.2008

Payment for wider sleeper- CS-169/2016
Warranty claims and rejections on IREPS-UDM Module
Source : Ministry of Railways (Railway Board) CMS Team Last Reviewed on: 22-07-2025