| Track-II | ||
| 2025 | ||
| 2022/TK-II/22/7/3 | Quality Procurement-UDM Utilisation | 17.07.2025 |
| 2025/TK-II/22/1/2 | Uniformity in procurement of ERCs on Indian Railways | 11.06.2025 |
| 2024/TK-II/22/26/1/BLT | Adoption of Ballast less Tracks on IR. | 10.05.2025 |
| 2020/Track-III/TK/2 | Implementation of Rolling Block Plan guidelines | 03.04.2025 |
| 2022/Track-II/22/7/3 | Warranty claims and rejections on IREPS-UDM Module |
03.02.2025 |
| 2024 | ||
| 2020/Track-III/TK/2 | Rolling Block Plan guidelines |
06.12.24 |
| 2013/TK-II/22/7/4(Gen. Policy) | TPI of PSC Sleepers as Pilot Projects | 22.07.2024 |
| 2010/TK-II/22/11/1/1 | Procurement of Sleepers and Modern Fastenings as a set. | 07.08.2024 |
| 2013/TK-II/22/7/4 Gen. Policy | Letter to all ZRs for adoption of HVN liner | 02.08.2024 |
| 2023 | ||
| 2024/TK-II/22/7/2 | Third Party Inspection of Elastic Rail Clips (ERCs) | 12.06.2024 |
|
2019/TK-II/22/11/26/8630933/Pathri/NR
|
Sleeper Payment-Old Vs New Zonal Contract | 09.05.2023 |
|
2022/Track-II/22/11/1(3407429)
|
Modification in Procurement of civil engg item by Stores Dte | 08.02.2023 |
| 2022 | ||
|
2004/Track-II/22/11/5(Shifting)
|
EPC procurement of track items | 28.10.2022 |
|
2017/TK-II/22/14/1
|
Changes in clause of PVC payment in HTS wire | 22.06.2022 |
|
2022/TK-II/22/7/1
|
Decontrol-Retention of RDSO controlled items. | 22.02.2022 |
|
2016/TK-II/22/11/68/71292/Bhanpuri
|
Improving record keeping and supervision of sleeper | 17.01.2022 |
| 2021 | ||
| 2013/TK-II/22/19/1 (Specification) | Composite Sleeper Procurement Modified Policy | 28.10.2021 |
| 2021/TK-II/22/6/1 Meeting | Wider Sleeper design modification | 26.08.2021 |
| 2017/TK-II/22/14/1 | PVC payment methodology | 08.04.2021 |
|
2004/TK-II/22/11/5(Shifting)
2004/TK-II/22/11/5 |
Revised Policy for concrete sleeper plants on Indian Railways Policy guidelines for intra-railway shifting of existing concrete sleeper plant |
19.02.2021
22.02.2006 |
| 2020 | ||
| 2013/TK-II/22/7/2 Gen.Policy Pt.III | Procurement of P.Way fittings | 12.06.2020 |
| 2004/TK-II/22/11/5 (Shifting) | Policy of setting up new Concrete Sleeper Plant | 05.12.2019 |
| Enclosure of DLOA of CS-172-Para-5 | Wider Sleeper Tender-CS-172-Special Condition of Contract | 07.06.2019 |
| 2004/TK-II/22/5/7 | 6.2 mm CGRSP- serviceability criteria & action in case of premature failure. | 15.04.2019 |
| 2013/TK-II/22/7/2/ Gen. Policy | Centralized procurement of Track item for field trial of P.way component. | 07.02.2019 |
|
2004/TK-II/22/5/7 Policy circulars |
In-service serviceability criteria for 10mm CGRSP and action to be taken in case pre-mature failure. |
16.01.2019 |
| 2016/TK-II/22/6/6 Policy circulars | Policy for DP extension proposal of Zonal Railways. | 31.10.2018 |
| 2016/TK-II/22/2/2 | Policy direction regarding production of wider & Heavier Sleeper. | 17.10.2018 |
|
2016/TK-II/22/11/68/71292/Bhanpuri |
24.09.2018 |
|
| 2017/TK-II/22/14/2 | GST against sleepers supplied to RVNL | 12.09.2018 |
| 2013/TK-II/22/2/2 | 11.09.2018 & 30.05.2018 | |
| 2011/TK-II/22/11/1/Specification | Inspection of Concrete Sleeper Plants | 25.07.2018 |
| 2013/TK-II/22/2/2Pt.II | Implementation of wider & heavier sleeper RT-8527 | 09.07.2018 |
| 2013/Track-III/TK/11/Pt.1 | Mandatory RDSO approval of all specifications Track Machine & Civil Engg. Items | 26.06.2018 |
| 2013/Track-II/22/7/2 Gen Policy Pt | 12.03.2018 | |
| 2017/TK-II/22/14/2 | Goods and Service Tax (GST) related issues in Tender No. CS-169 for Manufacture and Supply of PSC sleepers | 27.12.2017 |
| 2013/TK-II/22/19/1 Pt. (Specification) | Use of Composite Sleepers on girder bridges and its proliferation | 13-12-2017 |
| 2017/TK-II/22/14/1 | Review the tender/contract conditions of Concrete Sleeper Tender CS-169/2016 in wake of implementation of GST by Government of India and New series of WPI indices (2011-12) by economic adviser. | 24.10.2017 |
| 2016/Tk-II/22/11/2 | Double vetting of indents of P.Way items | 05.09.2017 |
| 2012/Tk-II/22/14/2 | Clarifications regarding GST provisions for supply contracts | 25.07.2017 |
| 2013/TK-II/22/7/2 (Gen. Policy) | Provisions in ERC supply contracts to ensure raw material supply from approved sources. | 19.04.2017 |
| 2013/Tk-II/22/19/1 Pt.(Specification) | Regular Adoption of Composite Sleepers on Indian Railways | 30.01.2017 |
| 2011/TK-II/22/11/1/Specification | Amendment in IRS-T-39 regarding maximum cement content | 03.06.2016 |
| 2013/TK-II/22/19/1 (specification) | Regular adoption of composite sleepers on Indian Railways | 23.05.2016 |
| 2013/TK-II/22/7/4 (Gen Policy) | New Policy on development and adoption of new products/technologies for track/bridge related itesms | 09.03.2016 |
| 2013/TK-II/22/7/2 (Gen.Policy) | Uploading of P.O. details on " Track Management System (TMS)". | 06.01.2016 |
| 2004/Tk-II/22/5/7 | Furnishing the status of procurement of track fitting/items in monthly PCDO | 01.01.2016 |
| 2015/TK-II/22/11/4(Policy) | Sleeper procurement -Private & PSUs | 31.12.2015 |
| 2014/Tk-II/22/7/1 (Policy) | Applicability of Inspection Charges and General Charges on sleepers being issued to construction projects and private parties | 16.11.2015 |
| 2012/Tk-II/22/7/3/Track fitting | Revised PVC formula for ERC-Mk III and Mk V | 23.07.2015 |
| 2004/TK-II/22/5/7 | IRICEN’s Session No. 15301 – Seminar for CE/TP, held on 7th & 8th May, 2015 – Clarification regarding “Serviceabilty Creteria of CGRSP” | 07.07.2015 |
| 2012/Tk-II/22/7/3/Track fitting | Revised PVC formula for ERC-Mk III and Mk V | 25.05.2015 |
| 2011/Tk-II/22/11/4/Policy | Sale of released serviceable surplus 52 kg PSC sleepers for use of private parties | 27.04.2015 |
| 2014/TK-II/22/7/1 Policy | 10.03.2015 | |
| 2011/TK-II/22/11/4 Policy |
Sale of released serviceable surplus 52 kg PSC sleepers for use of private parties |
10.03.2015 |
| 2011/TK-II/22/5/1/PVC | Calculation of H1/H0 at the time of payment of price variation against sleeper contract CS-166/13 | 10.02.2015 |
| 2013/Tk-II/22/7/2/Genl. Policy Pt. | Quality checks of CSPs | 19.11.2014 |
| 2013/Tk-II/22/7/2/Genl. Policy | Quality audit and checks of CSPs | 18.11.2014 |
| 2012/Tk-II/22/7/3/Track Fittings | Revision of certain “Special Tender Conditions” related to procurement of P.way items | 10.11.2014 |
| 2012/TK-II/22/15/3/ 71136/Ambuja | Utilization of 53-S Grade Ordinary Portland Cement supplied by M/s Ambuja, Rawan Plant | 03.11.2014 |
|
2011/TK-II/22/5/1/PVC |
16.9.14 |
|
|
2013/TK-II/22/7/2/GP/pt |
3.9.14 |
|
|
2002/TK-II/22/7/1/TSC/pt |
2.9.14 |
|
|
2013/TK-II/22/11/32/71165/NCR |
30.7.14 |
|
|
2001/TK-II/22/7/7/pt.ii |
5.6.14 |
|
|
2014/TK-II/22/7/1/policy |
8.5.14 |
|
|
2002/TK-II/22/7/1 |
30.4.14 |
|
|
2012/TK-II/22/15/1/71134/JP |
28.3.14 |
|
|
2011/TK-II/22/5/1PVC |
4.3.14 |
|
|
2004/TK-II/22/5/7 |
4.3.14 |
|
|
2004/TK-II/22/5/7 |
23.12.13 |
|
|
2011/TK-II/22/5/1 |
10.12.13 |
|
|
96/TK-II/22/4/2 Pt.II |
28.11.13 |
|
|
2009/TK-II/22/11/1/policy |
20.11.13 |
|
|
2013/TK-II/22/7/2/GP |
18.11.13 |
|
|
2010/TK-II/22/11/4 |
14.11.13 |
|
|
2004/TK-II/22/5/7 |
22.10.13 |
|
|
2011/TK-II/22/5/1 |
16.9.13 |
|
|
2013/TK-II/22/7/2/GP vol.II |
24.5.13 |
|
|
2011/TK-II/22/11/1/Spe. |
11.3.13 |
|
|
2007/TK-II/22/11/3 land licence policy |
1.3.13 |
|
|
2009/TK-II/22/5/2 |
1.2.13 |
|
|
2010TK-II/22/11/4 |
17.1.13 |
|
|
2009/TK-II/22/11/52/71098/SR |
31.12.12 |
|
|
2011/TK-II/22/11/4/MF |
21.12.12 |
|
|
2009/TK-II/22/11.21/71067/ER |
9.8.12 |
|
|
2012/TK-II/22/7/3 TK fittings |
27.7.12 |
|
|
2008/TK-II/22/11/77/71038/SWR |
22.6.12 |
|
|
2012/TK-II/22/18/1/Lok Sabha Question |
14.6.12 |
|
|
2009/TK-II/22/11/52/71098/SR |
11.6.12 |
|
|
2010/TK-II/22/11/4 |
18.5.12 |
|
|
2012/TK-II/22/6/3 |
4.5.12 |
|
|
2005/TK-II/22/11/7/Policy |
27.4.12 |
|
|
2009/TK-II/22/11/1/policy |
12.4.12 |
|
|
2012/TK-II/22/11/2 |
9.4.12 |
|
|
2009TK-II/22/11/1 Policy |
Pre-mature failure of sleepers |
9.4.12 |
|
2009/TK-II/22/1/2 |
28.12.11 |
|
|
2004/TK-II/22/5/7 |
9.12.11 |
|
|
2011/TK-II/22/21/1 |
8.11.11 |
|
|
2003/TK-II/22/11/78 pt. A |
3.10.11 |
|
|
2011/TK-II/22/11/4 Policy |
6.9.11 |
|
|
2010/TK-II/22/11/4/STR |
Schedule of technical requirement for manufacture of PSC sleeper |
26.8.11 |
|
2011/TK-II/22/5/1/PVC |
16.6.11 |
|
|
2011/TK-II/22/5/1/PVC/GRSP |
27.5.11 |
|
|
2011//TK-II/22/7/1/LF |
19.5.11 |
|
|
2011/ TK-II/22/7/1 |
15.04.11 |
|
|
2001/TK-II/22/7/2 pt |
27.8.10 |
|
|
2008 /TK-I/22/11/8pt |
14.05.10 |
|
|
2001/ TK-II/22/5/7 |
09.06.10 |
|
|
2001/ TK-II/22/7/2/G. Policy |
26.03.10 |
|
|
2001/ TK-II/22/7/7pt |
17.03.10 |
|
|
2005/ TK-II/22/11/7policy |
05.03.10 |
|
|
99/TK-II/22/7/6 |
19.09.2008 |
|
| Payment for wider sleeper- CS-169/2016 | ||
| Warranty claims and rejections on IREPS-UDM Module | ||
| Source : Ministry of Railways (Railway Board) CMS Team Last Reviewed on: 22-07-2025 | ||