| Permissible Carrying Capacity(PCC) | ||||
| Rates Master Circular on Permissible Carrying Capacity | ||||
| Corrigenda to RMC on PCC 2020 dated 01.05.2020 | ||||
|
Corrigendum |
Board’s Letter No. |
Date of Issue |
Date of effect |
Content in brief |
| TCR/1394/2022/PCC/3402081 | 12.11.2025 |
14.11.2025 |
PCC of Open wagons-"Salt" |
|
| Corri No 12 to Corri No. 97 to RMC/PCC/CC+8/etc Corri. No. 61 to RMC on Block Rake/Mini Rake/ Two Point Combination. | TCR/1394/2022/PCC/BTPNM1/3402236 | 23.10.2025 | 27.10.2025-TFA | PCC,Loading Tolerance and Designed Tare weight of BTPNM1 wagon |
| Corrigendum No. 142 | TCR/1394/2024/CC+8/1/3467808 | 06.10.2025 | 08.10.2025 | ER-Two routes of CC+8 (i)Barahat-Banka(ii) Tinpahar Jn.-Rajmahal |
| Corrigendum No.141 | TCR/1394/2020/4(Part)/3343161 | 08.08.2025 | 12.08.2025-TFA | en routes over WDFC-DFCCIL |
| Corrigendum No.140 | TCR/1394/2023/Universalized CC+8/3451238 | 28.07.2025 | 30.07.2025-TFA | One routes for Karota Patner(KRTR)-Ashokdham(ADHT) over ECR |
| Corrigendum No. 139 | TCR/1394/2024/CC+8/2/3468730 | 23.07.2025 | 25.07.2025-TFA | Two routes NCR-KIK & KIK-PEM for CC+8 load over SR |
| Corrigendum No.138 | TCR/1394/2020/4-Part(2)/3335729 | 21.07.2025 | 24.07.2025-TFA | One route NTPY-HIJ-RNTL for 25Taxle load wagons over SER |
| TCR/1394/2023/UniversalizedCC+8/3451238 | 25.06.2025 | 28.06.2025-TFA | Three routes on CC+8 over NER | |
| Corrigendum No.136 | TCR/1394/2024/CC+8/2/3468730 | 11.06.2025 | 14.06.2025-TFA | One route CC+8 CSZ-MBB(Up&Dn) over ER |
| Corrigendum No.135 | TCR/1394/2024/25T/3477701 | TCR/1394/2024/25T/3477701 | 11.05.2025-TFA | One route 25 T HPT-TNGL over SWR |
| Corrigendum No.134 | TCR/1394/2023/CC+8/3451238 | 30.04.2025 | 03.05.2025-TFA | CC+8 route BDC-KWAE over ER |
| Corrigendum No.133 to Rates Master Circular/PCC/CC+8 etc/2020/0 | TCR/1394/2024/25T/3477701 | 01.04.2025 | 01.04.2025-TFA | one route 25T HPT-VC-SMLI over SWR |
| Corrigendum No.8 to Corri 97 | TCR/1394/2022/TareWt/3402236 | 25.03.2025 | 28.03.2025-TFA | PCC of BTCS wagon. |
| Corrigendum No.132 | TCR/1394/2024/CC+8/1/3467808 | 17.03.2025 | 20.03.2025-TFA | One route for CC+8 ERN-ERS over SR |
| TCR/1394/2020/4/3319486 | 05.03.2025 |
08.03.2025-TFA |
3 Routes of 25 T over SER (i) HLZ-NMP (ii) PRR-DRGU (iii) TATA-BMPR
|
|
|
Corrigendum No.07 to Corrigendum No.97 to Rates Master Circular/PCC/CC+8 etc./2020/0 |
TCR/1394/2021/PCC/Container/3357058 | 18.02.2025 |
19.02.2025-TFA |
CC of BLCS(A-car & B-Car) wagon |
| TCR/1394/2023/CC+8/3451238 | 17.02.2025 |
20.02.2025-TFA |
Four routes for CC+8 1) MBB-AZ, 2) BZL- DKAE, 3) BLYC- BZL and 4) SRP- SHE over ER |
|
|
Corrigendum No.129 to Rates Master Circular/PCC/CC+8 etc/2020/0 |
TCR/1394/2024/CC+8/1/3468730 | 07.01.2025 |
09.01.2025-TFA |
One routes for CC+8 VSHI-DEIA over ECR |
| Corrigendum No. 06 to Corrigendum No. 97 to Rates Master Circular/PCC/CC+8etc./2020/0 | TCR/1394/2021/PCC/Container/3357058 | 02.01.2025 |
06.01.2025-TFA |
PCC of Container wagons. |
| TCR/1394/2014/02 Pt./3344756 | 31.12.2024 | 01.01.2025-31.12.2026 | PCC of Steel Pipes. | |
| Corrigendum No. 05 to Corrigendum No.97 | TCR/1394/2020/4/Pt.1/3467040 | 20.12.2024 | 24.12.2024-TFA | PCC of BOXNHL & BOXNHL25T |
| Corrigendum No.127 | TCR/1394/2024/25 T/3477701 | 27.11.2024 | 30.11.2024-TFA | One Route for operation of 25 T Axle Load Trains over SECR |
| TCR/1394/2020/4/3319486 | 27.11.2024 | 30.11.2024-TFA | One Route for operation of 25 T Axle Load Trains over SER | |
| TCR/1394/2024/CC+8/3466778 | 26.11.2024 | 29.11.2024-TFA | 3 Routes for CC+8 over NR | |
|
|
TCR/1394/2020/4(part)/3343161 | 26.11.2024 | 28.11.2024-TFA | Three Routes for operation of 25 T Axle Load Trains over SECR |
| TCR/1394/2020/4-Part(2)/3335729 | 26.11.2024 | 28.11.2024-TFA | Two Routes for operation of 25 T Axle Load Trains over SER | |
| Corrigendum No.122 | TCR/1394/2024/25 T/3477701 | 18.11.2024 | 20.11.2024-TFA | Two Routes for operation of 25 T Axle Load Trains over ECoR |
| Corrigendum No.121 | TCR/1394/2023/UniversalizedCC+8/3451238 | 14.11.2024 | 18.11.2024-TFA | 3 Routes for CC+8 over NWR & SR |
| Corrigendum No.120 | TCR/1394/2024/4-Part(2)/3335729 | 11.11.2024 | 14.11.2024-TFA | 6 Routes of 25 Tonne Axle Load wagons over SER |
| Corrigendum No.119 | TCR/1394/2024/CC+8/1/3467808 | 05.11.2024 | 09.11.2024-TFA | One route JUC-NRO over NR |
| Corrigendum No. 118 | TCR/1394/2022/BCNHL/SUGAR/339125 | 25.10.2024 | 01.11.2024-TFA | PCC of BCNHL for loading of Sugar |
| Corrigendum No.117 | TCR/1394/2024/CC+8/1/3467808 | 15.10.2024 | 17.10.2024-TFA | 3 routes for CC+8 (i) JSME-BDME,(ii)HWH-BLY(iii)LLH-BRMH over ER |
| Corrigendum No.116 | TCR/1394/2024/CC+8/3466778 | 19.09.2024 | 21.09.2024-TFA | One route for CC+8 DSA-TPZ over NR |
| Corrigendum No. 115 to Rates Master Circular/PCC/CC+8etc./2020/0 | TCR/1394/2024/CC+8/2/3468730 | 05.09.2024 | 07.09.2024-TFA | One route for CC+8 BTC-TRDI over SECR |
| Corrigendum No.04 to Corrigendum No.97 to Rates Master Circular/PCC/CC+8 etc./2020/0 | TCR/1394/2020/4/Pt.1/3467040 | 23.08.2024 | 27.08.2024 | PCC of BOXNHL & BOXNHL25T |
| Corrigendum No. 3 to Corri 97 | TCR/1394/2023/New Wagons/3437479 | 14.08.2024 | 20.08.2024-TFA | PCC of BOSM |
| Corrigendum No.2 to Corrigendum No.97 | TCR/1394/2023/New Wagons/3437479 | 14.08.2024 | 20.08.2024-TFA | PCC of ACT1,ACT2 & ACT3 |
| Corrigendum No.114 | TCR/1394/2024/CC+8/1/3467808 | 29.07.2024 | 31.07.2024-TFA |
Three(3) routes of CC+8 over SWR
(i) GIN-GGVT (ii) BGK-KJDI (iii) PKD-DMM via SSPN
|
| Corrigendum No.113 | TCR/1394/2024/CC+8/3466778 | 24.07.2024 | 26.07.2024-TFA |
Two(2) routes of CC+8 over SR
(i) SRR-NTVT-MAJN-JOKT-PNMB
(ii)SRR-NTVT-MAJN-JOKT-TOK
|
| Corrigendum No. 112 | TCR/1394/2024/CC+8/2/3468730/3338337 | 22.07.2024 | 27.07.2024-TFA | Three(3) routes over WR & NER |
| Corrigendum No.111 | TCR/1394/2020/4/3319486 | 09.07.2024 | 11.07.2024 | PCC of BOXNHL25T for loading of Clinker. |
| Corrigendum No.110 | TCR/1394/2020/4(Part)/3338337 | 21.06.2024 | 25.06.2024-TFA | Two route BHRJ-MSIB &MSH-VTDI over WR |
| Corrigendum No. 109 | TCR/1394/2023/UniversalizedCC+8/3451238 | 05.06.2024 | 07.06.2024-TFA | One routes BJU_BCA HJP CPR over ECR |
| Corrigendum No.108 | TCR/1394/2020/4(Part)/3338337 | 22.05.2024 | 27.05.2024 |
Four routes of CC+8 over ER |
|
Corrigendum No. 01 to Corrigendum No. 97 to Rates Master Circular/PCC/CC+8etc./2020/0 Corrigendum No. 02 to Corrigendum No.97 to Rates Master
Corrigendum No.05 dt. 20.12.2024
|
TCR/1394/2022/3396049 | 20.05.2024 | 26.04.2024 | PCC of BWTA and BWTB |
| Corrigendum No. 107 | TCR/1394/2023/4/universalized cc+8/3451238 | 23.04.2024 | 26.04.2024 | Five routes of CC+8 over North Western Railway |
| Corrigendum No.106 | TCR/1394/2020/4(Part)/3338337 | 19.04.2024 | 22.04.2024 | Four routes of CC+8 over NR |
| Corrigendum No.105 | TCR/1394/2020/4(Part)/3338337 | 08.03.2024 |
12.03.2024 |
One route of CC+8 BQA-SONA over SER |
| Corrigendum No.104 to Rates Master Circular/PCC/CC+8etc/2020/0 | TCR/1394/2022/3396049 | 27.02.2024 | Permissible Carrying Capacity(PCC) of BOST type wagons over CC+8 routes. | |
| Corrigendum No.103 to Rates Master Circular/PCC/CC+8etc/2020/0 | TCR/1394/2023/universalized CC+8/3451238 | 27.02.2024 | 05.03.2024-TFA | Running of freight trains on CC+8 tonne routes. |
| Corrigendum No. 102 | TCR/1394/2020/4(Part)/3343161 | 19.02.2024 | 22.02.2024-TFA | 25 Tonne Axle load-Three routes Angul-Sukinda over ECOR |
| Corrigendum No.101 | TCR/1394/2020/4(Part)/3343161 | 01.02.2024 | 03.02.2024-TFA | 4 Rotes of 25 ton axle over SER(GRB-ADRA,MURI-BRKA,MDKD-RDR,BKSC-PBJT) |
| Corrigendum No.100 | TCR/1394/2020/4-Part/3338337 | 15.01.2024 | 17.01.2020-TFA | Three routes of CC+8 STPD-MBNR-DKC,SC-FM(DN),MBNR-DKC(SL) over SCR |
| Corrigendum No.99 | TCR/1394/2020/4/3319486 | 08.01.2024 | 10.01.2024-TFA | One routes of CC+8 Hazratpur(HZH-Bhimgara Jn.(BMGA) over ER. |
| Corrigendum No. 98 | TCR/1394/2014/2(Part)/3344756 | 29.12.2023 | beyond 31.12.23 to 31.12.2024 |
Concessional Permissible Carrying Capacity(PCC) and loading tolerance on various routes.-Steel Pipes. |
|
Corri No. 10 to Corri No. 97 dt 11.07.2025 Corrigendum No.09 to Rates Master Circular/PCC/CC+8 etc/2020/0 Corrigendum No.8 to Corri 97 dt 25.03.2025 Corrigendum No.07 to Corrigendum No.97 to Rates Master Circular/PCC/CC+8 etc./2020/0 Corrigendum No. 06 dt. 02.01.2025 Corrigendum No.05 dt 20.12.2024 Corrigendum No. 3 of 97 dt. 14.08.2024 |
TCR/1394/2022/3396049 | 20.12.2023 | 01.01.2024 |
Notification of Permissible Carrying Capacity(PCC) of various wagons up to one decimal place. |
| Corrigendum no. 96 | TCR/1394/2020/4-Part/3338337 | 12.12.2023 | 14.12.2023 | One route of CC+8 Nardana-WCNA over Western Railway. |
| Corrigendum No. 95 | TCR/1394/2020/4-Part/3338337 | 20.10.2023 | 23.10.2023-TFA | One route of CC+8 LKU-KPV of NER |
| Corrigendum No.94 | TCR/1394/2022/BCNHL/3391253 | 18.10.2023 | 01.11.2023-31.10.2024 | PCC of BCNHL for loading of Sugar |
| Corrigendum No.93 | TCR/1394/2023/New Wagons/3437479 | 06.10.2023 | 10.10.2023-TFA | Commercial Specifications of "ACT1 and ACT2(A-Car, B-Car,C-Car)" |
| TCR/1394/2020/4-Part(2)/3335729 | 14.09.2023 | 16.09.2023 | 25 Tonne Axle load for DRZ-AAGH over SECR | |
| Corrigendum 91 | TCR/1394/2020/4/Pt.I/3329526 | 13.09.2023 | 17.09.2023 | PCC, Loading Tolerance, Standard Rake Size, minimum no. of wagons to be loaded for trainload freight, Designed Tare Weight. |
| Corrigendum 90(Deleted) | TCR/1394/2022/3396049 | 01.09.2023 | 08.09.2023 | Notification of Permissible Carrying Capacity(PCC) of various wagons up to one decimal place. |
| Corrigendum No.89 | TCR/1394/2020/4/-Part(2)/3335729 | 30.08.2023 | 01.09.2023 | 25 Tonne Axle Load wagons over RKI-CRS of SER |
| Corrigendum No.88 | TCR/1394/2020/4-Part/3338337 | 19.07.2023 | 21.07.2023-TFA | DUMK-MDLE &HSDA-GODDA of ER |
| Corrigendum No.87 | TCR/1394/2021/RedMud/3387958 | 06.07.2023 | 08.07.2023 | PCC of BOXN type for loading of Red Mud |
| Corrigendum No.86 | TCR/1394/2020/4/3319486 | 06.07.2023 |
08.07.2023 | 25 Tonne axle load wagons over ECOR for Angul to Balaram and Angul to Sukinda New BG line. |
| Corrigendum No. 85 | TCR/1394/2014/02 Pt./3344756 | 30.06.2023 | 01.07.2023 | PCC of Steel Pipes. |
| Corrigendum No.8430.06.2023 | TCR/1394/2020/4-Part/3338337 | 18.05.2023 | 28-05-2023-TFA | Running of freight trains on CC+8 etc/2020/0 |
|
TCR/1394/2022/BFNS/3406914 |
29.03.2023 |
01-04-2023- TFA |
PCC etc of BFNSM1 wagon notified |
|
|
TCR/1394/2020/4-Part/3338337 |
29.03.2023 |
31-03-2023- TFA |
One CC+8 route added over WR |
|
|
TCR/1394/2023/BOBRNHSM1/3424182 |
22.03.2023 |
23-03-2023- TFA |
PCC etc of BORNHSM1 Wagon notified |
|
|
TCR/1394/2023/BOBRNM1/3424186 |
21.03.2023 |
22-03-2023- TFA |
PCC etc of BORNM1 Wagon notified |
|
|
TCR/1394/2023/BOST/3424239 |
21.03.2023 |
22-03-2023- TFA |
PCC etc of BOST and BOSTHSM1 wagon notified |
|
|
TCR/1394/2020/ 4-Part/3329526 |
17.02.2023 |
20-02-2023- TFA |
7 wagons notified as high speed wagons under mission Raftaar |
|
|
TCR/1394/2020/ 4-Part/3338337 |
15.02.2023 |
17-02-2023- TFA |
One CC+8 Tonne route added over WR. |
|
|
TCR/1394/2020/ 4-Part/3338337 |
06.02.2023 |
08-02-2023- TFA |
One CC +8 Tonne route added over WR |
|
|
TCR/1394/2022/REDMUD/3387958 |
17.01.2023 |
20-01-2023- TFA |
Reduced PCC of BOXN type of wagons for loading of Red Mud notified |
|
|
TCR/1394/2022/BCNWAGONS/3405719 |
17.01.2023 |
19-01-2023- TFA |
PCC of “BCNAHSM1” Wagon notified. |
|
|
TCR/1394/2020/05/3320327 |
05.01.2023 |
09-01-2023- TFA |
PCC etc of BOMN wagon notified. |
|
|
TCR/1394/2020/4(Part)/3343161 |
09.12.2022 |
12-12-2022- TFA |
Two 25 tonne axle load routes added over SER. |
|
|
TCR/1394/2020/4-Part/3338337 |
10.11.2022 |
12-11-2022- TFA |
Five CC +8 routes added over NWR |
|
|
TCR/1394/2022/BCNHL/SUGAR/3391253 |
11.10.2022 |
14-10-2022- 31-10-2023 |
Reduced PCC of BCNHL for loading of sugar for the period |
|
|
TCR/1394/2020/4/3319486 |
29.09.2022 |
01-10-2022- TFA |
25 tonne axle load route notified over DFCCIL along with connectivity line of NWR |
|
|
TCR/1394/2020/4(Part)/3343161 |
21.9.2022 |
23-09-2022- TFA |
25 tonne axle load, Tie line approved |
|
|
TCR/1394/2020/4-Part/3338337 |
14.09.2022 |
16-09-2022- TFA |
One CC+8 route added over NWR |
|
|
TCR/1394/2020/4/Pt.1/3329526 |
13.09.2022 |
30.07.2022- TFA |
Notification for PCC etc of various wagon
|
|
|
TCR/1394/2020/4/Pt.1/3329526 |
05.09.2022 |
|||
|
TCR/1394/2020/4/Pt.1/3329526 |
27.07.2022 |
|||
|
TCR/1394/2020/4-Part/3338337 |
11.07.2022 |
13-07-2022- TFA |
One CC+8 route added over NER |
|
|
TCR/1394/2020/4-Part-1/3343161 |
01.07.2022 |
04-07-2022- TFA |
One 25 Tonne Axle load wagons. Added over SCR |
|
|
TCR/1394/2020/4- Part/338337 |
01.07.2022 |
04-07-2022- TFA |
One CC+8 route added over NWR |
|
|
TCR/1394/2014/02/ Pt./3344756 |
30.06.2022 |
30-06-2022 Till 30-06-2023 |
Reduced PCC OF WAGONS for loading (STEEL PIPES) extended beyond 30-06-2022Till 30-06-2023 |
|
|
TCR/1394/2020/4/3319486 |
17.06.2022 |
20-06-2022- TFA |
PCC of BOXNHL25 Tonne over all routes notified |
|
|
TCR/1394/2020/4/3319486 |
20.4.2022 |
21-04-2022- TFA |
25 Tonne Axle load added over SER |
|
|
TCR/1394/2020/4/3319486 |
19.04.2022 |
|||
|
TCR/1394/2020/03/3316598 |
11.04.2022 |
18-04-2022- TFA |
NOTIFICATION OF PCC OF VARIOUS WAGON |
|
|
TCR/1394/2020/4/3319486 |
25.03.2022 |
28-03-2022- TFA |
25 Tonne Axle load added over SER |
|
|
TCR/1394/2020/4-Part/3338337 |
11.02.2022 |
12-02-2022- TFA |
Two CC+8 routes added over NWR |
|
|
TCR/1394/2021/loadabilityofpaddy/3340404 |
18.01.2022 |
19-01-2022- TFA |
PCC of various wagons revised for loading of Rice and Wheat |
|
|
TCR/1394/2020/4(Part)/3343161 |
21.12.2021 |
22-12-2021- TFA |
Four 25 Tonne Axle load routes added over ECOR. |
|
|
TCR/1394/2020/4-Part(1)/3329526 |
14.12.2021 |
16-12-2021- TFA |
Two CC+8 routes added over ECR |
|
|
TCR/1394/2020/4 Part(3338337) |
23.11.2021 |
25-11-2021- TFA |
Three CC+8 routes added over NR |
|
|
TCR/1394/2020/03/3316598 |
22.10.2021 |
22.10.2021 to 31.03.2022 |
Reduced PCC of various wagons for loading of Pet coke extended from 22.10.2021 to 31.03.2022 |
|
|
TCR/1394/2020/4-Part (1)/3329526 |
29.09.20221 |
01-10-2021- TFA |
Four CC+8 routes added over NR |
|
|
TCR/1394/2020/4(Part (i)/3329526 |
07.09.2021 |
09-09-2021- TFA |
One CC+8 routes added over SECR |
|
|
TCR/1394/2020/4(3319486)) |
07.09.2021 |
09-09-2021- TFA |
25 Tonne Axle load added over DFCCIL |
|
|
TCR/1394/2020/4-Part(3338337) |
06.09.2021 |
08-09-2021- TFA |
Two CC+8 routes added over NR |
|
|
TCR/1394/2021/PCC/BFNV/3360537 |
19.08.2021 |
19-08-2021- TFA |
PCC etc of BENV wagon notified |
|
|
TCR/1394/2020/4/-Part/3338337 |
12.08.2021 |
14-08-2021- TFA |
One CC+8 route added over (NER)- |
|
|
TCR/1394/2020/4/3319486 |
26.07.2021 |
28-07-2021- TFA |
9 Routes added over ECOR 25 Tonne Axle load |
|
|
TCR/1394/2020/4/3319486 |
14.07.2021 |
16-07-2021- TFA |
PCC OF wagon over BOXNHL25T Axle load route notified |
|
|
TCR/1394/2020/4-Part/3338337 |
09.07.2021 |
11-07-2021- TFA |
Added over CC+8 routes. (WR) |
|
|
TCR/1394/2020/04/3319486 |
02.07.2021 |
04-07-2021- TFA |
Route added over 25 Tonne Axle load DFCCIL |
|
|
TCR/1394/2014/02 Pt./3344756 |
21.06.2021 |
30-06-2021 to 30-06-2022 |
Reduced PCC OF WAGONS for STEEL PIPE. |
|
|
TCR/1394/2020/4(Part)/3343161 |
15.06.2021 |
17-06-2021- TFA |
Route added over 25 Tonne Axle load (SER) |
|
|
TCR/1394/2020/4/3319486 |
25.05.2021 |
27-05-2021- TFA |
Route added over 25 Tonne Axle load (ER) |
|
|
TCR/1394/2020/04-Part/3338337 |
18.05.2021 |
20-05-2021- TFA |
One CC+8 route added over(ER |
|
|
No.TCR/1394/2020/4-Part(1)/3329526 |
13.05.2021 |
14-05-2021- TFA |
One CC+8 route added over SWR |
|
|
No.TCR/1394/2020/4-Part(1)/3329526 |
12.05.2021 |
|||
|
No.TCR/1394/2020/4-Part(1)/3329526 |
05.05.2021 |
06-05-2021- TFA |
One CC+8 route added over WR |
|
|
TCR/1394/2020/06 /3323461 |
27.04.2021 |
29-04-2021- TFA |
PCC of BOBRNHSM2 wagons notified |
|
|
TCR/1394/2020/03 /3316598 |
16.04.2021 |
31.03.2021 upto 15-10-2021 |
PCC OF WAGONS FOR LOADING OF PET COKE |
|
|
TCR/1394/2014/02 Pt./3344756 |
14.04.2021 |
31.03.2021 upto 30.06.2021 |
PCC BOST, for loading of steel Pipes of different diameters, |
|
|
TCR/1394/2020/4-Part(1)/3329526 |
12.03.2021 |
15-03-2021 TFA |
5 CC+8route added over SR |
|
|
TCR/1394/2021/loadability/paddy/3340404 |
11.03.2021 |
12-03-2021- 11-03-2022
|
Reduced PCC for various wagon for loading of Paddy notified |
|
|
TCR/1394/2021/loadability/paddy/3340404 |
10.03.2021 |
Reduced PCC OF WAGONS FOR LOADING OF PEDDY notified |
||
|
TCR/1394/2020/4/3319486 |
10.03.2021 |
12-03-2021-TFA |
Part of route notified as 25 Tonne Axle load route over SER |
|
|
TCR/1394/2020/4-Part(1)/3329526 |
09.03.2021 |
11-03-202 -TFA |
4 CC+8 added as 1 over ER; 2 over WR; and 1over SECR |
|
|
TCR/1394/2020/4/(Part) 3343161 |
08.03.2021 |
08-03-2021-TFA |
PCC of BOXNS over 25 tonne axle route for various commodities notified |
|
|
TCR/1394/2020/4/3319486 |
02.03.2021 |
05.03.2021 -TFA |
One 25 tonne axle load route added over ER |
|
|
TCR/1394/2020/4 Part e-file-3338337 |
26.02.2021 |
28-02-2021-TFA |
One CC+8route added over SECR |
|
|
|
|
|||
|
TCR/1394/2020/4 Part(1) e-file-3329526 |
26.02.2021 |
28.02.2021- TFA |
3 CC+8route added over ER |
|
|
TCR/1394/2020/4/3319486 |
17.02.2021 |
02-02-2020-TFA |
Route for Running 25 tonne axle load |
|
|
TCR/1394/2020/4/3319486 |
15.02.2021 |
02-02-2021-TFA |
PCC of BOXNHL25T over various route notified in continuation to Corigendum No.23 |
|
|
TCR/1394/2020/4/3319486 |
02.02.2021 |
02-02-2021-TFA |
PCC of BOXNHL25T over 25 Tonne Axle route notified |
|
|
TCR/1394/2020/4-Part/3338337 |
02.02.2021 |
04-02-2021-TFA |
1(one) CC+8route(ER) added over |
|
|
TCR/1394/2020/4-Part/3338337 & 3329526 |
25.01.2021 |
28-01-2021-TFA |
3 CC+8route one each over SECR,NCR and WR added |
|
|
TCR/1394/2020/4-Part/3338337 |
20.01.2021 |
22-01-2021-TFA |
2CC+8route(WESTERN RAILWAY) added over |
|
|
TCR/1394/2020/4-Part(2)/3335729 |
19.01.2021 |
19-01-2021 - TFA |
25 tonne axle load(3 routes) allowed over one route of SER and one route over ER |
|
|
TCR/1394/2020/4- Part/3338337 |
14.01.2021 |
16-01-2021-TFA |
3 CC+8 routes added over NER |
|
|
TCR/1394/2020/4-Part(2)/3335729 |
14.01.2021 |
14-01-2021 -TFA |
25 toune axle load (one route)over ECOR RAILWAY allowed |
|
|
TCR/1394/2020/4-Part(2)/3335729 |
07.01.2021 |
09-01-2021-TFA |
25 tonne axle load (2 routes) allowed over DFCCIL |
|
|
TCR/1394/2020/4- Part/3338337 |
30.12.2020 |
01-01-2021 - TFA |
2 CC+8route added over (WESTERN RAILWAY |
|
|
TCR/1394/2020/4- Part(1)/3329526 |
29.12.2020 |
31-12-2020 - TFA |
2 CC+8route added over (WESTERN RAILWAY) |
|
|
TCR/1394/2020/4-Part(2)/3335729 |
11.12.2020 |
11-12-2020 -TFA |
25 tonne axle routes (Two) added over SER |
|
|
TCR/1394/2020/4-Part(2)/3335729 |
25.11.2020 |
|
Notification for restarting of 25 tonne axle routes over ECOR,SECR,SER and SWR |
|
|
TCR/1394/2020/4-Part(1)/3329526 |
23.11.2020 |
25-11-2020- TFA |
2 CC+8 routes added over Northern Railway |
|
|
TCR/1394/2020/03/3316598 |
10.10.2020 |
11-10-2020 till 31.03.2021 |
Reduced (PCC) of Wagons for loading of Pet Coke |
|
|
TCR/1394/2020/4-Part(1)/3329526 |
08.10.2020 |
11-10-2020-TFA |
5 CC+8 routes added over SWR |
|
|
TCR/1394/2020/4-Part(1)/3329526 |
23.09.2020 |
25-09-2020- TFA |
1 CC+8 route added over SWR |
|
|
TCR/1394/2020/4/3319486 |
21.09.2020 |
23-09-2020- TFA |
2 CC+8 route added over ECoR |
|
|
TCR/1394/2020/2/3319524 |
17.09.2020 |
17-09-2020- TFA |
PCC and loading tolerance of bcfc and BCFCM wagons revised |
|
|
TCR/1394/2020/04 |
14.08.2020 |
17-08-2020- TFA |
7 CC+8 routes added over (Northern Railway) |
|
|
TCR/1394/2020/03 |
03.08.2020 |
05-08-2020 till 11.10.2020 |
Reduced PCC of wagon for loading of pet coke (For various wagons) |
|
|
TCR/1394/2020/02 |
08.07.2020 |
10-07-2020 TFA |
PCC of BCFCM wagons |
|
|
TCR/1394/2020/03 |
25.06.2020 |
27-06-2020 till 11.10.2020 |
Reduced PCC of wagons for loading of pet coke |
|
|
TCR/1394/2020/4 |
19.06.2020 |
21-06-2020- TFA |
3 CC+8route added over Northern Railway |
|
| 29.11.2024-TFA | ||||
| 27.11.2024 | ||||
| 08.10.2025 | ||||
| Source : Ministry of Railways (Railway Board) CMS Team Last Reviewed on: 12-11-2025 | ||||