inner-banner-img

Letter No.

Date

Subject

2025
2024/SIG/18/1/SigDATE 08.04.2025 Generation of Route Control Charts (RCCs) using Signalling Design Automation Tool SigDATE for Electronic Interlockings.
2024
2024/Sig/24 Conf./89th SSC Mtg. 13.03.2024 Approval of HQ level Circuit diagrams for EI works

 

2023

2018/Sig/36-SD/1/Pt. 30.05.2023 Nomination of Committee members for “Standing Committee for standardization of typical circuits for EI and development of SigDATE”

2022

2018/Sig/36-SD/1/Pt

18.11.2022

Nomination of Committee member for “Standardization of typical circuits for EI”.

2020

2018/Sig/36-SD/1

06.01.2020

Standardization of Signalling  Drawings

2018/Sig/7/6-RVNL/1

13.02.2020

Empowering RVNL for approval of Design Documents of S&T installation of Indian Railways

2018/Sig/7/6-RVNL/1(e-3273833)

17.04.2020

Empowering RVNL for approval of Design Documents of S&T installations on IR for Doubling/3rd Line/New Line Projects executed by RVNL

2019

2018/Sig/7/6-RVNL/1

18.02.2019

Empowering RVNL for Approval of design documents of S&T installation under RVNL Projects.

2018/Sig/36-SD/1

20.11.2019

Standardization of S&T Drawings.     

2018/Sig/36-SD/1

26.11.2019

Standardization of Signalling Drawing.

2015/Sig/WG/Standardize Layouts

09.12.2019

Standardization of Station Yard Layouts and Signalling Documents.

2018/Sig/36-SD/1

18.12.2019

Uploading of SIP & Roll Diagram.

2015/Sig/WG/Standardise Layouts

26.12.2019

Standardization of Station Yard Layouts and Signalling Documents.

2018/Sig/7/6/RVNL/1

28.10.2019

Emprowering RVNL for Approval of Design documents of S&T installation in BZA-GDV-BVRM-NDD-NS-MTM Doubling,UR-MBNR and MMTS phase ii Dubling Project on South Central Railway.

2017

2015/sig/WG/Standardize layout.

12.07.2017

Standardize of station Yard Layouts and Signalling Documents.

2016/Sig./Drg. Off./1

09.11.2017

Approval of Signal and Interlocking Plan (SIP).

2016

2016/Sig/Drg.off/1

18.04.2016

Review of Drawing office Practices.

2015

2015/Sig/Roll Diagram

03.07.2015

Details of Signalling as on 30.06.2014-Roll Diagrams & System Maps with proper indexing.

 

 




Source : Ministry of Railways (Railway Board) CMS Team Last Reviewed on: 26-05-2025