2021/Sig/Estimates/DPR

22.06.2023

Checklist for S&T sub estimates submitted with DPR.

2023/GS/Sig./Typical Abstract Estimate

01.05.2023 Preliminary cost estimation for preparation of DPR for Signaling works.
2020/Sig/TCAS/Estimates 18.05.2023

Components of Kavach/CTC inclusion in yard remodeling/ABS/LC gate/Signalling works.

2017/Sig/WP/Double Distant 11.05.2023

Raising of Sectional Speed to 130 kmph on BG Routes over Indian Railways.

      2022

2021/Sig/KAVACH/EPC

21.01.2022

Standard EPC Tender Document for Single Stage Two packet System

2021/Sig/Estimates/DPR (e file-3363771)

25.08.2022

Checklist & Appraisal Performa for S&T sub estimates.

2020/Sig/31/Misc/24/Precautions 19.10.2022 Winter and fog Precautions for Signalling Systems.

2017/Sig/WP Progress/1

23.11.2022 Works to be sanctioned within the Railway powers.

2021

2020/Sig/ph-29/Zonal Exe. Auth.

14.01.2021

Change in nodal authority for plan Head 2900 (Road Safety Works Level Crossings) at Zonal Railways.

2020/Sig/CBTC

19.01.2021

Execution of work of CBTC on Mumbai suburban section by MRVC setting up of a Core group

2020/Sig/nomination East Kidwai Nagar, New Delhi

26.02.2021

Letter of Acceptance for executive of Signalling works.

2020/Sig/nomination Saket, New Delhi

26.02.2021

Letter of Acceptance for executive of Signalling works.

2020/Sig/nomination Gurgaon, Haryana

26.02.2021

Letter of Acceptance for executive of Signalling works.

2020

2016/Sig/PMO/1

01.01.2020

Expenditure Efficiency: Action Plan for reducing wasteful expenditure.

2017/Sig/Signallng/Modernization

27.02.2020

Workshop on Railways and Defence Sector to promote Steel usage in the country.

2018/E&R/3(2)/1

04.03.2020

D&G charges in various works estimates

2018/Sig/17/16/1

13.03.2020

Price Variation Cause for 6 Quad Cable as per IRS: TC 30.2005 (Ver.-1) Amd

2021/Sig/WP/IR/1

16.04.2020

Umbrella work  for provision of Remote  Diagnostic & Predictive maintenance system at 100 stations on Golden Quadrilateral & Golden Diagonal (GQ & GD) routes

2018/Sig/7/6-RVNL/1

16.06.2020

Empowering RVNL for approval of design documents of S&T installations on Indian Railway for doubling/ tripling/ new line projects being executed by RVNL

2020/Sig/7/3-RITES/1

06.07.2020

Empowering RITES Ltd for Approval of Design documents for S&T installation under RITES project

 

2018/Sig/17/16/1

05.08.2020

PVC clause for 6 Quad cable as per IRS: TC30/2005 with latest amendments

2020/Sig/WP/RE Works

18.09.2020

Elimination of balance Mechanical Signalling installations on IR

2020/Sig/35-Policy/4/Interlocking

20.10.2020

Implementation of Standard Layout.

2016/Sig/PMO/1

11.11.2020

Monitoring of action plan suggested by CVC for Indian Railways

2019

2019/Sig/31/17-Plg Matters

23.01.2019

Directions given by Hon’ble MR during presentation on 07.12.2018.

2012/Sig/M/7/Gen(D AC)

17.07.2019

Procurement of Signalling items against works contract from RDSO approved vendor list

2018/Sig/7/6/RVNL/1

26.07.2019

Empowering RVNL for approval of Design documents of S&T installations

2018/Sig/7/6/RVNL/1

28.10.2019

Emprowering RVNL for Approval of Design documents of S&T installation in BZA-GDV-BVRM-NDD-NS-MTM Doubling,UR-MBNR and MMTS phase ii Dubling Project on South Central Railway.

2018

2017/Sig/WP/Misc.

26.03.2018

Interlocking of manned level crossings with high TVUs.

2017/SIG/WP/Works Progress

10.05.2018

Work to be sanctioned with in the Railway Power

2014/sig/siding

11.09.2018

Levy of D&G Charges- SKS Power Generation (Chhattisgarh) Ltd. Taking off from mod section between Robertson and Bhupdeopur station in Bilaspur Division.

2017/Sig/3/Misc./GST

17.09.2018

Erroneous Income Tax Deduction effected on Dues receivable by Railways.

2018/Sig/31/11-REMatters/1

13.11.2018

Assistance required for Faster execution of S&T Works.

2017/Sig/Misc.

18.12.2018

Up-gradation of Signaling and Interlocking on HDN/HUN Routes.

2017

2016/SIG/WP/Work Review/1

10.02.2017

Review of progress of works and finalization of targets.

2017/Sig/WP/IR/RF/& IDS

03.04.2017

Execution of Works for Trial of Rail fracture & Intrusion detection system on N.C Railway & NF Railway.

2016/Sig./Works Review

11.04.2017

Execution of Works for under Plan head 33.

2017/Sig/3/ Genl/1

01.06.2017

Execution of Engineering Works along the Railway Tracks.

2017/Sig/3/Misc/GST.

31.07.2017

Implementation of introduction of Goods & Service Tax (GST) on the ongoing contracts.

2016/SIG/WP/Works Review/1.

21.08.2017

Augmentation/Creation of Training facilities for S&T personnel.

2017/Sig/WP/RE Works.

29.08.2017

Replacement / Modification in Signalling to suit RE.

2015/Sig/Vision/2030.

30.08.2017

Information relating to setting of specific goals of signal and Telecommunication to be achieved by 2022.

2017/SIG/WP/Misc.

31.08.2017

Inclusion of proposals for works in PWP 2018-19.

2017/CE-I/CT/7/GST

27.10.2017

Impact of GST Existing Works Contracts.

2017/SIG/WP/Misc.

28.11.2017

Modernization of Signaling and Telecommunication systems on golden Quadrilateral and Diagonals.

2016

2014/Sig/CRB/Projects/Pt. II

06.01.2016

S&T Works in connection with targeted doubling/third line projects

D.O.2014/Sig/PMO

13.01.2016

Change of allocation of sanctioned S&T works to capital

2013/Sig/GCC

09.06.2016

Price Variation Clause in Signalling Contracts

2016/Mobility(S&T)/9/1

29/31.08.2016

Mission Raftaar - Data for Signalling Asset Reliability and Road Map.

2015/Sig/WP/Alloc./SER

19.09.2016

Change of Allocation of Sanctioned signaling Works from DRF/DF to Capital/EBR.

2015

2014/Sig/FDI

18.06.2015

Sectoral guidelines for Domestic/Foreign Direct Investment in Railways.

2010

2008/Sig/Estimate/Gen

03.06.2010

Preparation of Abstract Estimates. 

2008

2008/SIG/RE/(Works)

25.06.2008

Execution of  S&T Works in RE Areas.

2007

2007/SIG/SGF/2

23.04.2007

Guidelines for floating and finalization of Composite tenders for S&T projects/works.

2000/RE/161/11.

01.05.2007

Execution of S&T works in RE area.

2005

2005/W-I/RVNL/5

12.05.2005

Timely and smooth execution of RVNL project.

2004/SIG/G/7

13.12.2005

Execution of Engineering works along the railway Track.

 

 