inner-banner-img
2025
2022/Sig/EI/Policy-Part(1) 09.05.2025 Replacement of Panel/RRI by Electronic Interlocking (EI).
2018/SIG/7/6-RVNL/1 15.01.2025 Empowering RVNL for approval of logic & Interface circuits.
2024
2012/Sig/ATSS/Pt. 14.02.24 Technical System Application Approval (TSAA) of Electronic Interlocking
2018/Sig/36-SD-1 02.08.24 Standardization of Typical Circuits for Electronic Interlocking (EI) Ver. 3.0
2023
2020/Sig/18/EI/GEN-Part(2) 29.08.2023 Conceptualization of and Advance Version of EI
2012/Sig/ATSS 27.06.2023 Compliance of stipulations – TSAA of EI & other sanctions at PCSTEs level.
2012/Sig/ATSS/Pt. 28.02.2023 TSAA of Electronic Interlocking
2021/Sig/7/PSUs 05.01.2023 MRVC for approval of interface/logic circuit for EIs and PI/RRI
2022
2018/Sig/36-SD/1/Pt 18.11.2022 Nomination of Committee member for “Standardization of typical circuits for EI”.
2021
2013/Sig. Vig/01 (Part) 21.01.2021 System Improvement in works contract for commissioning of Electronic Interlocking (EI) system.
2021/Sig/25-Conf/5/SSC 26.02.2021 Special signal standards committee (SSC)’s meeting for EI.
2020
2012/Sig/ATSS 10.01.2020 Technical System Application Approval (TSAA) of Electronic Interlocking (EI)
2020/Sig/35-Policy/4/Interlocking 04.11.2020 Provision of isolation for simultaneous reception at stations due to chance in interlocking from std-I to std-II (R) for EI
2013/Sig/01/(pt)Dup 19.11.2020 System Improvement in works contract for commissioning of Electronic Interlocking (EI) System
2013/Sig/Vig/01(Part) 30.12.2020 System Improvement in works contract for commissioning of Electronic Interlocking (EI) System
2019
2008/Sig/SGF/4/EI/Gen/Pt. 08.03.2019 Implementation of recommendations contained in the report to bring “Self Reliance on Electronic Interlocking (EI)”In Indian Railways.
2008/Sig/SGF/4/EI
/Gen/Pt.1
06.06.2019 Automation in Signaling Drawing - Self Reliance in Electronic Interlocking (EI)
2010/Sig/SGF/EI
(MEDHA)
06.06.2019 Medha make EI model MEI 633: (i) Upgradation to executive software to version 1.2(ii) Restoration of Hot Standby mode.
2008/Sig/SGF/4/El/GEN 28.08.2019 EI OEMs Organization chart for post commissioning maintenance
2008/Sig/SGF/4/EI/GEN/pt-1 04.11.2019 Automation in Signal Drawing-Self Relince in Electronic Interlocking.
2014/Sig/M/83rd SSC 11.11.2019 Block working built into Electronic Interlocking.
2018/Sig/36-SD/1 20.11.2019 Standardization of Typical circuits for Electronic Interlocking.
 2008/Sig/SGF/4/EI/GEN 19.12.2019 Integrating Train operation into Electronic Interlocking (EI).
2018
2018/Sig/1/Sig-Equip/IPS/1. 12.01.2018 Siemens Electronic Interlocking-Provision of newer version power supply card PSU 24.
2011/Sig/EI/Policy. 22.03.2018 Review of Electronic Interlocking (EI) Application Data Design for achieving uniformity across approval vendors.
2008/Sig/SGF/4/EI/GN/Pt.1 03.08.2018 Self-Reliance on Electronic Interlocking (EI).
2017
STS/L/SSI/General 10.03.2017 Implementation of Recommendations contained in the report to bring “Self-Reliance on Electronic Interlocking (RI) in Indian Railways.
2008/Sig/SGF/4/EI/GEN 19.05.2017 Non 0bservation of General and Subsidiary Rules while Undertaking yard remodeling.
2013/Sig/IRSET. 09.08.2017 Review of Electronic Interlocking (EI) Application Data Design for achieving uniformity across approval vendors.
2016
2003/SIG/G/5 28.04.2016 Policy on type of interlocking to be adopted at stations provided with centralized operation of points and signals.
2008/Sig/SGF/4/EI/Gen/Pt.1 16.08.2016 Implementation of Recommendations contained in the Report to bring “Self-Reliance on Electronic Interlocking (RI) in Indian Railways”
2012/Sig/ATSS 06.10.2016 Technical System Application Approval (TSAA) of Advanced Technology Signalling: - EI installations up to 100 routes.
2015
2012/Sig/ATSS 02.09.2015 Technical System Application Application approval of Advanced Technology Signaling Systems.
2011/ Sig/EI/Policy 15.04.2015 Incorporation of condition or MoU with OEMs (RDSO approved sources) in technical eligibility criteria in tender award of works contract for Electronic Interlocking (EI)
2012/Sig/ATSS 16.04.2015 Technical System Application Approval (TSAA) of Advance Technology Signalling System.
2008/Sig/SGF/4/EI 30.06.2015 Failure of EI at Purna due to lightning.
2012/Sig/ATSS 02.09.2015 Technical System Application Approval (TSAA) of Advance Technology Signalling System.
2012/Sig/ATSS 26.11.2015 Signalling Installations at Major Junction Stations (> 100 routes).
2012
2012/Sig/ATSS 03.05.2012 Technical System Application Approval (TSAA) of Advance Technology Signalling System.
2010/Sig/SGF/EI(Ansaldo) 26.12.2012 Improvement of configuration for Microlok II Electronic Interlocking.
2010
2008/Sig/SGF/4/EI/GEN 22.07.2010 Microlock-II Approval of version CC3.0.
2009
2008/SIG/SGF/4/EI/GEN 29.07.2009 Provision of Electronic Interlocking System.
2006
2003/Sig/G/5. 14.09.2006 Policy on type of interlocking to be adopted at stations provided with centralized operation of points & Signals.
2005
2005/Sig/SGF/4/EI 01.06.2005 Improvement in Electronic Interlocking (SSI) Equipment- Micro Lock-II.
2005/Sig/SGF/4/EI 14.10.2005 Induction of new technologies for Electronic Interlocking.
Source : Ministry of Railways (Railway Board) CMS Team Last Reviewed on: 26-05-2025