| CIRCULER NO. |
SUBJECT |
ISSUE DATE |
| 2023/Proj./ModelDBR/UndergroundStructure/30/42 | Model DBR - Underground Structures for Cut & Cover Method | 18.09.2023 |
|
E- 2010/Proj./DLI/34/3Pt. & E-2020/Safety(A&R)/19/31 |
Metro Railway General Rules, 2020 | 29.10.2020 |
| E-2020/Proj./METRONEO/30/33 | METRO-NEO | 29.10.2020 |
| NIL | MoU BETWEEN MRVC & MoR | 2018-19 |
| 2018/CEDO/SR/PC-6/0 | Policy Circular No. 06 | 31.10.2018 |
| 2014/Proj./C/11/4 | Authorization to GM, Metro Railway-21.05.2018 | 21.05.2018 |
| 2011/Proj/MOU/31/1 Vol.I | AUTHORISED SIGNATORY OF MRA FOR METRO TECHNICAL APPROVALS | 11.04.2018 |
| 2015/Proj./Model/DBR/2/2 | MODEL DBR FOR VIADUCTS | 15.01.2018 |
| 2015/Proj/Safety/30/5 | FIRE SAFETY STANDARDS FOR METRO STATIONS | 03.11.2017 |
| 2016/Proj/Washable Apron/9/1 | Washable Apron Policy-16.10.2017 | 16.10.2017 |
| 2016/Proj./ Washable Apron/9/1 | Washable Apron Policy | 05.07.2017 |
| 2016/WP/TF/Satt.Stns | POLICY ON SATELLITE TERMINALS | 20.06.2017 |
| 2011/Proj./MoU/31/1 Vol.I | AMENDMENT TO ANNEXURE-C1 | 21.04.2017 |
| 2016/Proj./Policy Matter/4/2 | POLICY ON IR SUBURBAN RAIL SYSTEMS | 18.04.2017 |
| 2011/Proj./MoU/31/1 Vol.I | METRO MANUAL-AMENDMENT TO ANN-C1 | 10.03.2017 |
| 2015/Proj./Model DBR/2/2 | DBR -BORED TUNNELS | 03.03.2017 |
| 2011/Proj./MoU/31/1 Vol.I | METRO MANUAL-AMENDMENT TO PARA 5.3 b | 17.02.2017 |
| 2015/CHG-II/37/01 | Traffic Block Charges | 01.07.2016 |
| 2015/Proj./Model DBR/2/2 | Model DBR – Elevated Stations | 21.06.2016 |
| 2011/Proj./9/2 | Ballastless Track-Washable Apron-Guidelines |
12.02.2016 |
| NIL | MoU BETWEEN MRVC & MoR | 2016-17 |
| 2011/Proj./MoU/31/1 Vol. I | DERAILEMENT GUARDS ON SINGLE TRACK TUNNELS | 26.11.2015 |
| 2011/Proj./MoU/31/1 Vol.-I | AMENDEMENT OF ANN-C2 OF METRO MANNUAL | 18.11.2015 |
| 2011/Proj./MoU/31/1 | METRO MANUAL-AMENDMENT TO PARA 9 | 16.04.2015 |
| 2011/Proj./ MOU/31/1 | CERTIFICATION OF METROS | 19.02.2015 |
| 2009/Proj./ MAS/9/2 | REVISED PERFORMANCE CRETRIA OF FASTENING SYSTEM | 18.02.2015 |
| 2014/Proj./C/11/4 | Authorization to GM, Metro Railway-04.12.2014 | 04.12.2014 |
| 2014/Proj./INSPECTION/40/5 | Metro Over bridge inspection | 20.08.2014, 18/21.07.2014 |
| 2013/Proj./Metro/40/10 Misc. | Accidents reports by Metros. | 24.03.2014 |
| 2011/Proj./9/2 | BLT trial on IR | 16.12.2013 |
| 2011/Proj./9/2 | BLT-IFS approval | 13.12.2013 |
| 2012/Proj./37/12 | Sub-Committee on track ETC-Minutes 19.11.2013 | 11.12.2013 |
| 2013/Proj./Metro/40/10 Misc. | Accidents at work site Metros. | 05.11.2013 |
| 2013/Proj./RMGL/30/6 | Oscillation trails for Metros | 12.07.2013 |
| 2009/Proj./MAS/9/2 (Voll.II) | Delkor ALT-I approval | 12.12.2012 |
| 2010/Proj./Bangalore/30/4 (Voll.II) | Metro Check rails on curves | 15.02.2012 |
| 2003/Proj./Bangalore/2/2 (Pt.) | DSBP Fastening approval | 07.10.2011 |
| 2011/Proj./MAS/9/2 | Loarg 336 approval | 19.08.2011 |
| 2011/Proj./MAS/9/2 | Performance criteria on fastening | 21.05.2010 |