| 22.1 |
General |
| 22.2 |
Signal structure |
| 22.3 |
Visibility of signals |
| 22.4 |
Cables and Cable Laying |
| 22.5 |
Signaling and Interlocking Circuits |
| 22.6 |
Line circuits |
| 22.7 |
Signal feed Circuitry |
| 22.8 |
Point operation and Detection |
| 22.9 |
Block working |
| 22.10 |
Track circuits |
| 22.11 |
Power Supply |
| 22.12 |
Axle counter |
| 22.13 |
ATP system |
| 22.14 |
Earthing |
| 22.15 |
Rules for Protection of Staff working on Signal & Telecommunication Installation Extracts of Para 20.5 of Appendix 1 of ACTM Vol. II, Part II |
| Annexure 31 |
Detailed Instructions for measurement of stray Direct Current before installation of DC Single Rail Track Circuits |
| Annexure 32 |
Provisions of Part 'J' of Permanent Way Manual |
| Annexure 33 |
RE Drawing from 22.1 to 22.16 |