| . |
INSTALLATION |
| . |
SECTION 'A' � CABINS |
| . |
SECTION 'B' - LEVER FRAME |
| 12.1 |
Cabins |
| 12.2 |
Conformity to drawing and specifications |
| 12.3 |
Marking of parts |
| 12.4 |
Assembling mechanical locking |
| 12.5 |
Checking of components |
| 12.6 |
Erection |
| 12.7 |
Subsequent additions and alterations |
| 12.8 |
Information to the Divisional Signal & Telecommunication Engineer |
| . |
SECTION 'C - LEAD OUTS (RODDING) |
| 12.9 |
Type |
| 12.10 |
Arrangement of Accommodating Cranks |
| 12.11 |
Down rods |
| 12.12 |
Rod connections to accommodating cranks |
| 12.13 |
Crank fastening bolts |
| 12.14 |
Movement of lead off cranks |
| 12.15 |
Use of high cranks |
| 12.16 |
Rod run on curves |
| . |
SECTION 'D' - POINT RODDING AND FITTINGS |
| 12.17 |
Point Rodding |
| 12.18 |
Alignment |
| 12.19 |
Distance from the centre of track |
| 12.20 |
Branching Off |
| 12.21 |
Rodding running under track |
| 12.22 |
Fixing Roller Standard |
| 12.23 |
Spacing of rollers |
| 12.24 |
Location of cranks, compensators, couplings & lug eyes |
| 12.25 |
Offsets in roddings |
| 12.26 |
Offset in cranks and compensators |
| 12.27 |
Fixing Trestles of Point Rod Rollers |
| 12.28 |
Fixing Trestles foundations |
| 12.29 |
Provision of compensators |
| 12.30 |
Fixing cranks and compensators |
| 12.31 |
Joints for connections to cranks and compensators |
| 12.32 |
Joints for branching off |
| 12.33 |
Location of screw joint |
| 12.34 |
Point adjusting screws |
| 12.35 |
Adjustable cranks |
| 12.36 |
Bolts, Nuts, Washers & Pins |
| 12.37 |
Washers |
| 12.38 |
Coach screws |
| 12.39 |
Reaming of pin holes |
| . |
SECTION 'E' - POINTS |
| 12.40 |
Essential requirements before interlocking |
| 12.41 |
Adjustment of Point Switches |
| 12.42 |
Permissible Distances |
| . |
SECTION 'F' - FACING POINT LOCKS, SWITCH & LOCK |
| . |
MOVEMENTS AND SPRING POINT LEVERS - SELF REVERSING |
| 12.43 |
Layout |
| 12.44 |
Notches |
| 12.45 |
Facing Point Lock-plunger type |
| 12.46 |
Obstruction Test |
| 12.47 |
Switch & lock layouts |
| . |
SECTION 'G' - LOCK BARS |
| 12.48 |
Length |
| 12.49 |
Adjustment |
| . |
SECTION 'H' - POINT, TRAP AND SHUNTING PERMITTED |
| . |
INDICATORS |
| 12.50 |
Type, Provision, Placing and Indication |
| . |
SECTION T - LOCATION OF SIGNALS |
| 12.51 |
Deviation to SOD |
| 12.52 |
special instructions |
| 12.53 |
Inspection by a Signal sighting committee |
| . |
SECTION 'J' - SIGNALS AND FITTINGS |
| 12.54 |
Signal arms and its fittings |
| 12.55 |
Slotting |
| 12.56 |
Shunt Signals |
| 12.57 |
Balance Levers |
| 12.58 |
Back Lights |
| 12.59 |
Lopping of trees obstructing visibility |
| 12.60 |
Artificial backgrounds |
| 12.61 |
Posts |
| 12.62 |
Deck Boards |
| 12.63 |
Provision of Signal Dubbers and Kerosene |
| 12.64 |
Cleaning of Signal roundels and lamp lenses |
| . |
SECTION 'K' - DETECTORS |
| 12.65 |
Fitting and placing |
| 12.66 |
Wire connections and adjustment |
| 12.67 |
Signal Slide Notches |
| 12.68 |
Obstruction tests |
| . |
SECTION 'U - SIGNAL WIRE RUN (SINGLE WIRE) |
| 12.69 |
Spacing of pulleys |
| 12.70 |
Sharp Diversions |
| 12.71 |
Wire runs under track |
| 12.72 |
Wire runs under level crossings |
| 12.73 |
Wire runs on curves |
| 12.74 |
Leading away wire from a main run |
| 12.75 |
Bridge stakes |
| 12.76 |
Wire crossing |
| 12.77 |
Signal wires |
| . |
SECTION 'M' - PULLEY STAKES AND PULLEYS |
| 12.78 |
Fixture and alignment |
| 12.79 |
Fastening pulley brackets |
| 12.80 |
Maximum spacing between the pulley stakes |
| 12.81 |
Alignment of Pulley stakes |
| . |
SECTION 'N' WIRE JOINTS AND SPLIT LINKS |
| 12.82 |
Wire Joints |
| 12.83 |
Split links |
| . |
SECTION 'O' - WIRE ROPE |
| 12.84 |
Galvanized wire rope |
| 12.85 |
Wire rope round wheels |
| 12.86 |
Wire rope on cabin wire adjusters |
| 12.87 |
Precautions in cutting |
| 12.88 |
Lubrication |
| . |
SECTION 'P' - WIRE ADJUSTING APPARATUS (SINGLE WIRE) |
| 12.89 |
Wire adjusting screw |
| 12.90 |
Cabin Wire Adjuster |
| 12.91 |
Additional adjusting screws |
| . |
SECTION 'Q' - FOUNDATIONS (SINGLE WIRE) |
| 12.92 |
Foundations generally |
| 12.93 |
Foundations for cranks and compensators |
| 12.94 |
Foundations for wheels, detectors, point indicators and dwarf signals .. |
| 12.95 |
Fixture of cranks, wheels, detectors, point indicators and dwarf signals to foundations |
| 12.96 |
Foundations for signals |
| 12.97 |
Pits for foundation adjacent to tracks |
| 12.98 |
Concrete foundations |
| . |
SECTION 'R' - DOUBLE WIRE INSTALLATIONS - INTERLOCKING FRAMES AND LEAD OUTS |
| 12.99 |
Type |
| 12.100 |
Double wire levers |
| 12.101 |
Size of Drums |
| 12.102 |
Erection |
| 12.103 |
Levers for operating Points, locks, detectors and signals |
| 12.104 |
Clutch lever-adjustment of clutch |
| 12.105 |
Clutch Resetting Lever |
| 12.106 |
Wire crosses |
| 12.107 |
Double wire operation from single wire lever |
| 12.108 |
Compensators |
| 12.109 |
Application |
| 12.110 |
Installation |
| 12.111 |
Pulleys & Stakes |
| 12.112 |
Fixture and alignment of stakes |
| 12.113 |
Running out wire |
| . |
DIVERSIONS IN TRANSMISSIONS |
| 12.114 |
Use of wire pulleys |
| 12.115 |
Use of wheel with wire rope |
| 12.116 |
Wheel Guides |
| 12.117 |
Length of rope and spacing of joints at diversions |
| . |
WHEEL BASE |
| 12.118 |
Fixing Wheels and Wheel Base foundations |
| . |
JOINTS |
| 12.119 |
Type and location |
| 12.120 |
Disconnecting Link |
| . |
ADJUSTING SCREWS |
| 12.121 |
Provision |
| 12.122 |
Minimum Spacing |
| 12.123 |
Opening |
| . |
POINT, LOCK AND SIGNAL MECHANISMS |
| 12.124 |
Type |
| 12.125 |
Installation of mechanisms |
| 12.126 |
Size of Wire |
| . |
DETECTORS |
| 12.127 |
Fitting of detectors to Points |
| 12.128 |
Connections |
| 12.129 |
Number and spacing |
| 12.130 |
Size of wire |
| 12.131 |
Adjustment |
| 12.132 |
Protecting Covers |
| . |
SECTION 'S' - PAINTING |
| 12.133 |
Equipment to be painted |
| 12.134 |
Colouring Scheme |
| 12.135 |
Interval of Painting |
| 12.136 |
Record of Painting |
| . |
GENERAL INSTRUCTIONS |
| 12.137 |
Stores |
| 12.138 |
Mixing of Paints |
| 12.139 |
Painting of steel works |
| 12.140 |
Enamel Signal Arms |
| 12.141 |
Numbering of Points and Signals |
| 12.142 |
Dates of Painting |
| . |
MAINTENANCE |
| . |
SECTION 'A'- CABINS. |
| 12.143 |
Cabins-cleanliness, repair and fittings |
| 12.144 |
(Left blank Intentionally) |
| . |
SECTION 'B' - LEVER FRAME |
| 12.145 |
Responsibility |
| 12.146 |
Instructions for maintainers |
| 12.147 |
Instructions for Junior Engineer (Signal) |
| . |
SECTION 'C - LEAD OUTS (RODDING) |
| 12.148 to 12.149 |
Lead outs |
| . |
SECTION 'D' - POINT RODDING AND FITTINGS |
| 12.150 |
Examination |
| 12.151 |
Alignment |
| 12.152 |
Rollers |
| 12.153 |
Rollerfoundations |
| . |
SECTION 'E' - CRANKS, COMPENSATORS, SCREWS, BOLTS, NUTS, PINS AND COTTERS |
| 12.154 |
Examination |
| 12.155 |
Replacement of cracked or broken parts |
| 12.156 |
Cleaning of oil holes |
| 12.157 |
Screws, bolts and nuts |
| 12.158 |
Adjusting Screws |
| 12.159 |
Pins |
| 12.160 |
Keys and Cotters |
| . |
SECTION 'F' - POINTS |
| 12.161 |
Visual inspection |
| 12.162 |
Responsibility of SSE/SE/JE (P-Way) & SSE/SE/JE (Signal) |
| 12.163 |
Damaged switches and packing of sleepers |
| 12.164 |
Testing and adjustment |
| . |
SECTION 'G' - FACING POINT LOCKS, SWTICH & LOCK MOVE-MENTS AND SPRING POINT LEVERS - SELF REVERSING |
| 12.165 |
Facing point locks |
| 12.166 |
Switch & Lock Movement |
| 12.167 |
Loose or cracked parts |
| 12.168 |
Cross Slides .. |
| 12.169 |
Testing Switch and Lock movements and facing point locks |
| . |
SECTION 'H' - LOCK BARS |
| 12.170 |
General |
| 12.171 |
Testing Lock Bars |
| . |
SECTION 'I' - DETECTORS |
| 12.172 |
Detector examination and lubrication |
| 12.173 |
Detector notches |
| 12.174 |
Cleaning of detector shoes and angle slides |
| 12.175 |
Testing detectors |
| 12.176 |
Replacement of cracked or broken parts |
| . |
SECTION 'J' - SIGNAL WIRE RUN (SINGLE WIRE) |
| 12.177 |
Alignment |
| 12.178 |
Wires generally |
| 12.179 |
Wires under track |
| . |
SECTION 'K' - PULLEY STAKES AND PULLEYS |
| 12.180 |
Pulleys and Pulley stakes |
| . |
SECTION 'L' - ELECTRICAL REPEATERS AND SIGNAL LAMPS |
| 12.181 |
Periodical inspection by JE/SE (Signal) |
| 12.182 |
Examination and replacement of Signal & Indicator lamps |
| . |
SECTION 'M' - DOUBLE WIRE INSTALLATIONS - INTERLOCKING FRAMES AND LEAD OUTS |
| 12.183 |
Transmissions Generally |
| 12.184 |
Maintenance of Compensators |
| 12.185 |
Testing Point, Lock, Detector and Signal Levers |
| 12.186 |
Broken wire lock |
| 12.187 |
Broken wire tests |
| 12.188 |
Reconnection or repairs after wire breakage |
| 12.189 |
Responsibility and Periodicity of Broken Wire Tests |
| 12.190 |
Wire stretch on newly laid Double Wire transmission |
| . |
SECTION 'N' - PAINTING |
| . |
SECTION 'O' - MAINTENANCE SCHEDULES |
| Annexure 5 |
Essential Requirements before interlocking of a point |
| Annexure 6 |
Colouring scheme |
| Annexure 7 |
Maintenance schedule for mechanical signalling |