| 2022/Safety(A&R)/19/32 | Dispensation under GR 3.47 regarding provision of new EI and associated works at Santacruz station in connection with 6th line project Ph-1 a(i) work in MMCT-BVI section of MMCT Divn of WR. | 28.12.2022 |
| 2020/Safety(A&R)/19/07 | Notification of Indian Railways (Open Lines) General Rule-increasing speed of trains to 30 KMPH during NI working | 23.12.2022 |
| 2022/Safety(A&R)/19/35 | SR 3.51 (a) & (b) regarding obtaining detection of point during maintenance/failure of point. | 21.12.2022 |
| 2022/Safety(A&R)/19/36 | Clarification about setting of Overlap while Opening the Trap(DS) in the overlap portion or closing of Trap in the overlap portion as per the “Railway Opening for Public Carriage of Passengers Rules, 2000.” | 20.12.2022 |
| 2021/Safety(A&R)/19/49 | Instructions of CCRS regarding Technical Circular No.35 | 19.12.2022 |
| 2022/Safety(A&R)/19/34 | Authority for preparation and updation of Accident Manual | 19.12.2022 |
| 2005/Safety(A&R)/6/4 Pt. | Train accidents investigation. | 12.12.2022 |
| 2005/Safety(A&R)/6/4 | Investigation of train accidents. | 09.12.2022 |
| 99/Safety(A&R)/6/1 | Guiding norms for imposing punishment in consequential accident cases. | 05.12.2022 |
| 2022/Safety(A&R)/19/13 | Restriction imposed by CRS/CC at Motipura Chowki station and Hinauta Ramban station in connection with Doubling | 04.11.2022. |
| 98/Safety(A&R)/19/16, | Train Operation during Foggy & inclement weather – Precautions. | 12.10.2022. |
| 2022/Safety(A&R)/22-23/2/16 | Safety Measures | 03.10.2022 |
| 2020/Safety(A&R)/19/07 | Notification of Indian Railways(Open Lines)General Rule-increasing speed of trains to 30 KMPH during NI working. | 05.09.2022 |
| 2022/Safety(A&R)/2/8 | Adherence to the provisions of 3.68, GR 3.69, GR 3.70-Precautions to be taken when Signal in defective. | 31.08.2022 |
| 2020/Safety(A&R)/19/5 | Protection of trains held up at first stop signal. | 29.08.2022. |
| 2022/Safety(A&R)/19/20 | Indian Railway (Open Lines) General (Second Amendment)Rules, 2022- Amendment of Rule 4.08(1)(a) of Indian Railways(Open Lines) General Rules, 1976- regarding Limits of speed generally | 28.07.2022 |
| 2022/Safety(A&R)/19/09 | Dispensation of detonating signals(detonators)from G.R. | 27.07.2022 |
| 2022/Safety(A&R)/19/14 | Adherence to the provision of GR 4.40 – Precautions to prevent unusual incidents due to movement cattles/wild animals (like elephants) in and around railway track | .20.6.2022 |
| 2022/Safety(A&R)/19/10 | Provision of use of Main Signal For shunting Purposes as per GR 3.46(2) and SR 5.13.01 in connection with CRS observation for Nuagaon, Jhartarabha & Jujumura stations. | 16.06.2022 |
| 2022/Safety(A&R)/19/03 | For retaining existing shunting movements at Shakur Basti (SSB) station | 02.05.2022 |
|
Dispensation of detonating signals(detonators) from G.R. |
25.04.2022 |
|
| 2022/Safety(A&R)/19/06 | Issue of Caution Order to Crew and Guard | 12.04.2022 |
| 2020/Safety(A&R)/19/17 | Amendment of Rule 4.35 of Indian Railways(Open Lines) General Rules, 1976 – regarding Starting of trains. | 14.03.2022 |
| 2022/Safety(A&R)/19/04 | RATLAM Yard remodeling work- Simultaneous reception/dspatch of train (GR 3.47) & Shunting operations (SR 5.16) | 05.03.2022 |
| 2021/Safety(A&R)/19/48 | Instruction of CCRS on inspection during NI. | 05.03.2022 |
| 2021/Safety(A&R)/19/39 | Infringement of DFCCIL track due to derailment on IR track or vice-versa. | 05.03.2022 |
| 2021/Safety(A&R)/19/34 | Approval for combination of two stop signals between PTNR & DBSI stations of Northern Railway. | 01.02.2022 |
| 2021/Safety(A&R)/19/10 | Use of detonating signal at gate stop signal & IBH signal during thick, foggy tempestuous weather impairing visibility. | 17.01.2022 |
| 2020/Safety(A&R)/19/37 | Precaution to be taken by Zonal Railways for winter session and arresting SPAD cases. | 14.01.2022 |
| 2021/Safety(A&R)/19/25 | Train operations after unusual occurrences/earthquakes etc. | 12.01.2022 |
| 2021/Safety(A&R)/19/47 | Dispensation of Block instruments at block stations where block proving Axle counters haven been provided. | 03.01.2022 |