inner-banner-img

Latest Letters

Latest Letters

Title
TYPE/SIZE
Title:

Applicability of deduction of Building and Other Construction Workers Welfare Cess (BOCWW Cess)

Type/Size:
171.66 KB
Type/Size:
Title:

19.12.2025 Model Document of Request for Proposal for appointment of Project Supervision Services Agency (PSSA) for providing Project Supervision Service (PSS)

Type/Size:
2.57 MB
Type/Size:
Title:

09.12.2025 Minimum Eligibility Criteria in Works Tenders

Type/Size:
235.92 KB
Type/Size:
Title:

27.11.2025 Ensuring timely payment in Works Contracts

Type/Size:
187.86 KB
Type/Size:
Title:

17.11.2025 Standard EPC Tender Document for single stage two packet system dated 07.04.2025 ( Amendment No. 1)

Type/Size:
736.83 KB
Type/Size:
Title:

13.11.2025 Adoption of CPWD Delhi Schedules of Rates- 2023 (DSR-Vol. I, DSR-Vol. II, Analysis of Rates for DSR (AOR-Vol.I, AOR-Vol.II)

Type/Size:
184.98 KB
Type/Size:
Title:

26.09.2025 Procurement of Project Supervision Services Agency (PSSA)

Type/Size:
168.49 KB
Type/Size:
Title:

14.08.2025 Exemption from deposition of Earnest Money (EMD) & Security Deposit (SD) for award of the Work

Type/Size:
290.89 KB
Type/Size:
Title:

31.07.2025 Implementation of IT Application for Works Contract Management System (IR-WCMS) on Production units and Workshops​

Type/Size:
298.71 KB
Type/Size:
Title:

24.06.2025 Seeking clarification on applicability of GCC Correction Slip No. 10Amendment to Rule for opening, Gazette Notification Dt. 07.07.2025

Type/Size:
740.94 KB
Type/Size:
Title:

24.06.2025 Seeking clarification on applicability of GCC Correction Slip No. 10Amendment to Rule for opening, Gazette Notification Dt. 07.07.2025

Type/Size:
61.77 KB
Type/Size:
Title:

19.12.2025 Model Document of Request for Proposal for appointment of Project Supervision Services Agency (PSSA) for providing Project Supervision Service (PSS)

Type/Size:
2.57 MB
Type/Size:
Title:

28.03.2025 Corrigendum to Advance Correction Slip (ACS) No. 63 to Indian Railways Code for Engineering Department, Revised Edition - 1982 and Fourth Re-print 2012

Type/Size:
713.11 KB
Type/Size:
Title:

07.04.2025 Standard EPC Agreement with Schedule G-1 for Railway Projects

Type/Size:
4.07 MB
Type/Size:
Title:

07.04.2025 Standard EPC Agreement without Schedule G-1 for Railway Projects

Type/Size:
3.84 MB
Type/Size:
Title:

07.04.2025 Standard EPC Tender Document for Single stage Two Packet System (RFP

Type/Size:
1.33 MB
Type/Size:
Title:

Model Document of Request for Proposal for appointment of Authority Engineer for providing Project Management Services (PMS)

Type/Size:
2.07 MB
Type/Size:
Title:

Amendment to Rule for opening, Gazette Notification Dt. 07.07.2025

Type/Size:
740.94 KB
Type/Size:
Title:

26.09.2025 Procurement of Project Supervision Services Agency (PSSA)

Type/Size:
168.49 KB
Type/Size:
Title:

10.11.2025 Indian Railway Works Manual, 2000 (Advance Correction Slip No. 13)

Type/Size:
127.98 KB
Type/Size:
Title:

14.08.2025Exemption from deposition of Earnest Money (EMD) & Security Deposit (SD) for award of the Work

Type/Size:
290.89 KB
Type/Size:
Title:

31.07.2025Implementation of IT Application for Works Contract Management System (IR-WCMS) on Production units and Workshops​

Type/Size:
298.71 KB
Type/Size:
Title:

30.07.2025Uploading of TechnicalKey personnel details on the IREPS portal at the time of bid submission of PMS, PSSA, GC etc. which shall be exclusively downloaded from INFRACON portal

Type/Size:
111.80 KB
Type/Size:
Title:

24.06.2025Seeking clarification on applicability of GCC Correction Slip No. 10

Type/Size:
61.77 KB
Type/Size:
Title:

03.7.2025Adoption of CPWD Delhi Schedules of Rates-2023 (DSR Vol.-I, DSR Vol.-II), Analysis of Rates for DSR (AOR Vol.-I, AOR Vol. - II)

Type/Size:
232.17 KB
Type/Size:
Title:

04.03.2025 Indian Railways Standard General Conditions of Contract, April-2022 Advance Correction Slip No. 10 (ACS-10)

Type/Size:
436.20 KB
Type/Size:
Title:

24.03.2025 Addendum & Corrigendum Slip ACS No. 05 to IRSOD (BG), Revised - 2022

Type/Size:
143.40 KB
Type/Size:
Title:

Expediting the process of challenging the arbitration award

Type/Size:
328.70 KB
Type/Size:
Title:

09.01.2025Indian Railways Standard General Conditions of Contract, April-2022 Advance Correction Slip No. 9 (ACS-9)

Type/Size:
375.25 KB
Type/Size:
Title:

20.12.2024Indian Railways Standard General Conditions of Contract, April-2022 Advance Correction Slip No. 8 (ACS-8)

Type/Size:
150.44 KB
Type/Size:
Title:

25.09.2024Indian Railways Standard General Conditions of Contract, April-2022 Advance Correction Slip No. 7 (ACS-7)

Type/Size:
231.20 KB
Type/Size:
Title:

Processing for Works Programme 2025-26 on Indian Railways -Procedure of Works Programme in Board's Office

Type/Size:
279.99 KB
Type/Size:
Title:

GuidelinesModel Document for the appointment of Design Consultants

Type/Size:
43.84 KB
Type/Size:
Title:

Procedure order for Measurement, Test Check limit, Material passing & Payments etc. wherein PMSPSSA contracts are in place

Type/Size:
388.89 KB
Type/Size:
Title:

References for changes amendments in existing instructions on GCC and EPC documents

Type/Size:
99.68 KB
Type/Size:
Title:

28.06.2024 Modified MCNTM (Manpower and cost Norms for Track Maintainers) Formulae'2024 - NormsYardsticks for Track Maintainers

Type/Size:
442.45 KB
Type/Size:
Title:

Clarification regarding submission of Annexure-V of GCC with Tenders

Type/Size:
38.00 KB
Type/Size: