Applicability of deduction of Building and Other Construction Workers Welfare Cess (BOCWW Cess)
19.12.2025 Model Document of Request for Proposal for appointment of Project Supervision Services Agency (PSSA) for providing Project Supervision Service (PSS)
09.12.2025 Minimum Eligibility Criteria in Works Tenders
17.11.2025 Standard EPC Tender Document for single stage two packet system dated 07.04.2025 ( Amendment No. 1)
13.11.2025 Adoption of CPWD Delhi Schedules of Rates- 2023 (DSR-Vol. I, DSR-Vol. II, Analysis of Rates for DSR (AOR-Vol.I, AOR-Vol.II)
26.09.2025 Procurement of Project Supervision Services Agency (PSSA)
14.08.2025 Exemption from deposition of Earnest Money (EMD) & Security Deposit (SD) for award of the Work
31.07.2025 Implementation of IT Application for Works Contract Management System (IR-WCMS) on Production units and Workshops​
24.06.2025 Seeking clarification on applicability of GCC Correction Slip No. 10Amendment to Rule for opening, Gazette Notification Dt. 07.07.2025
24.06.2025 Seeking clarification on applicability of GCC Correction Slip No. 10Amendment to Rule for opening, Gazette Notification Dt. 07.07.2025
19.12.2025 Model Document of Request for Proposal for appointment of Project Supervision Services Agency (PSSA) for providing Project Supervision Service (PSS)
28.03.2025Â Corrigendum to Advance Correction Slip (ACS) No. 63 to Indian Railways Code for Engineering Department, Revised Edition - 1982 and Fourth Re-print 2012
07.04.2025Â Standard EPC Agreement with Schedule G-1 for Railway Projects
07.04.2025Â Standard EPC Agreement without Schedule G-1 for Railway Projects
07.04.2025Â Standard EPC Tender Document for Single stage Two Packet System (RFP
Model Document of Request for Proposal for appointment of Authority Engineer for providing Project Management Services (PMS)
Amendment to Rule for opening, Gazette Notification Dt. 07.07.2025
26.09.2025 Procurement of Project Supervision Services Agency (PSSA)
10.11.2025 Indian Railway Works Manual, 2000 (Advance Correction Slip No. 13)
14.08.2025Exemption from deposition of Earnest Money (EMD) & Security Deposit (SD) for award of the Work
31.07.2025Implementation of IT Application for Works Contract Management System (IR-WCMS) on Production units and Workshops​
30.07.2025Uploading of TechnicalKey personnel details on the IREPS portal at the time of bid submission of PMS, PSSA, GC etc. which shall be exclusively downloaded from INFRACON portal
24.06.2025Seeking clarification on applicability of GCC Correction Slip No. 10
03.7.2025Adoption of CPWD Delhi Schedules of Rates-2023 (DSR Vol.-I, DSR Vol.-II), Analysis of Rates for DSR (AOR Vol.-I, AOR Vol. - II)
04.03.2025Â Indian Railways Standard General Conditions of Contract, April-2022 Advance Correction Slip No. 10 (ACS-10)
24.03.2025 Addendum & Corrigendum Slip ACS No. 05 to IRSOD (BG), Revised - 2022
Expediting the process of challenging the arbitration award
09.01.2025Indian Railways Standard General Conditions of Contract, April-2022 Advance Correction Slip No. 9 (ACS-9)
20.12.2024Indian Railways Standard General Conditions of Contract, April-2022 Advance Correction Slip No. 8 (ACS-8)
25.09.2024Indian Railways Standard General Conditions of Contract, April-2022 Advance Correction Slip No. 7 (ACS-7)
Processing for Works Programme 2025-26 on Indian Railways -Procedure of Works Programme in Board's Office
GuidelinesModel Document for the appointment of Design Consultants
Procedure order for Measurement, Test Check limit, Material passing & Payments etc. wherein PMSPSSA contracts are in place
References for changes amendments in existing instructions on GCC and EPC documents
28.06.2024 Modified MCNTM (Manpower and cost Norms for Track Maintainers) Formulae'2024 - NormsYardsticks for Track Maintainers
Clarification regarding submission of Annexure-V of GCC with Tenders