Rear collision of Train no. 08504 (VSP-RGDA Passenger) with Train no. 08532 (VSK-PAS Passenger) between Kantakapalli and Alamananda of Waltair Division of East Coard Railway on 23.01.2023
Earthing, Bonding, Surge & Lightning Protection System for S&T Installation.
Technical System Application Approval (TSAA) of Digital Axle Counter system installations before commissioning
Minutes of Meeting held for review of performance of Ms Frauscher make Axle Counters held on 29.07.2025
Minutes of Meeting held for review of performance of Ms Eldyne make Axle Counters held on 29.07.2025
IRSEM (July 2021 Edition) Addendum and Corrigendum Slip No. 8 reg Chapter- 14 LC Gates
Designationof RDSO as the Nodal Agency for Standardization and Optimization of Parameters for OEM- Specific braking Algorithms in Kavach System
Process of initial survey for Kavach System Design Inputs
Signal failure due to frequent cable cut damages along the track
Provision of Raincoat and Overcoat to Supervisors of S&T Department.
Replacement of PanelRRI by Electronic Interlocking (EI).
Effectiveness of SMMS (Signalling Maintenance Management System)
Generation of Route Control Charts (RCCs) using Signalling Design Automation Tool SigDATE for Electronic Interlockings.
Streamlining of Maintenance activity for assets created under Kavach Project.
Empowering RVNL for approval of logic & Interface circuits