2023/CE-II/Meeting/CTEs Conf. Manual execution of TSR & Deep screening 17.02.2026
2023/CE-II/TK/Inspection Focused Attention on Deep Screening and Maintenance of Turnouts. 27.01.2026
2024/CE-II/Genl/Misc Maintenance of ‘Rough Journal of Inspections’ for USFD testing of AT Welds and uploading of records on TMS. 27.01.2026
2025
2024/CE-II/Genl/Misc. 'Rough Journal of Inspections' for scheduled inspections of JE/SSE/P.Way. 26.12.2025
2025/CE-II/TK/IMC Super-check/audit of Points & Crossings by Track Analytics Cell. 26.12.2025
2024/CE-II/Genl/Misc. Uploading of inspection details of Points & Crossings from Rough Journal of of Inspections on TMS. 17.12.2025
2024/CE-II/Genl/Misc. Rough Journal of Inspections' for scheduled inspections of JE/SSE/P.Way 16.12.2025
     

2019/CE-II/TK/ROI

Inspection Schedule of Sr. DEN/DEN. 02.12.2025
2023/CE-II/TK/Inspection Inspection of Training Institutes/Centers/Schools in Zonal Railways. 05.12.2025
2019/CE-II/Perf./TMS Uploading of Track related letters/circulars in TMS. 25.09.2025
2025/CE-II/TK/IMC Introduction of new system of turnout maintenance – Inspection–Maintenance – Confirmation (IMC Model). 25.09.2025
 2019/CE-II/Perf./TMS Introduction of Scrap Disposal Modules in UDM (User Depot Module) 24.09.2025
2014/CE-II/TSC/1 Pt.-I Requirement of minimum track structure for speeds beyond 110 kmph of Passenger carrying train on BG IR 11.09.2025
2017/CE-II/TK/Policy-Part(1) Upgradation of Existing Bridges in Cut/Connection Sections During Doubling/Gauge Conversion Projects to Comply with Terms of Reference (TOR) 02.09.2025
No.2025/CE-II/TK/PCE/CTE/TSC Bi-monthly Presentation on Status of Items from PCE’s Seminar, CTE’s Seminar and TSC. 28.08.2025
No.2023/CE-II/Meeting/CTEs Conf. Manual execution of TSR & Deep Screening. 19.08.2025
2025/CE-II/TK/TACell Establishment of Track Analytics Cell 31.07.2025
2019/CE-II/WP/PBC  Revival of deleted works of LAW Book under PH-31 28.07.2025
2024/CE-II/Safety Working of Motor/Moped Trolley 07.07.2025
2023/CE-II/Safety/Instruction Instructions for maintenance of track on Ghat Sections and Sections having curve sharper than 5° on gradient steeper than 1 in 100. 14.06.2025
2022/CE-II/TK/Turnout/Renewal Preparation of ESP on Digital Platform. 14.05.2025
2025/CE-II/Meeting/CTE's Conf. Inclusion of progress of ISD (Increase in Sleeper Density) works in TSR(S). 06.06.2025
No.2023/CE-II/TK/FencingPolicy Policy guidelines for providing safety fencing along the track 23.04.2025
2009/CE-II/Accident/Policy Movement of container Flat Wagon (BLC) and loaded EUR rakes on second and subsequent loops. 24.03.2025
2009/CE-II/Accident/Policy Movement of container Flat Wagon (BLC) and loaded EUR rakes on second and subsequent loops. 18.03.2025
 2024
2023/CE-II/Safety/Instruction Annual Ballast Planning 19.12.2024
2023/CE-II/Safety/Instruction Important Aspects regarding Ballast DMT Unloading. 19.12.2024
2015/CE-II/TK/14 Yard Drainage Plan 11.12.2024
2024/CE-II/Genl/Misc Periodical meetings of SrDEN/Cs & ADENs. 29.11.2024
2016/CE-II/TS/2/CC+8+2t   Operation of CC+8+2t (22.9t) loaded trains 13.11.2024
2013/TMS/Netbooks/Policy

Replacement of Netbooks provided to P.way officials for implementation of TMS in lndian Railways.

03.11.2014
2024/CE-II/CRS/12810 CRS's recommendations in Preliminary Report on side collision of train no. 12810 (HWH-CSMT Mail) with Goods train no. N/JBCT in CKP Division of SECR on 30.07.2024. 18.10.2024
. 
2024/CE-II/TK/Track Tolerance Up-gradation of Track Maintenance Standards of Goods Loop Lines 30.10.2024
2024/CE-II/TK/Track Tolerance Up-gradation of Track Maintenance Standards of Passenger Loop Lines 28.10.2024
2019/CE-II/WP/Policy-UMB Procedure for processing of proposals in IRPSM and sanctioning of itemised works against Umbrela Works under Plan Head - 31(Track Renewals) for WP 2025-26 & onwards. 17.08.2024
2019/CE-II/TS/25t Operation of 25t axle load over selected routes of IR 23.07.2024
2024/CE-II/Safety Display of Single PSR Board 20.06.24
2023/CE-II/TK/Fencing Policy Safety Fencing Works Along the Track -Reg. 06.05.2024
2024/CE-II/Genl/Misc. Issue of uniform and other accessories to Trackmen Keymen Mates and Patrolmen 02.05.2024
2023/CE-II/TK/Fencing Policy Details of proposed subways in relation with safety fencing along the track 15.02.2024
2023
2022/CE-1I/Board Meeting Provision of Engineering Time Allowance(ETA) for Faster execution of capacity enhancement/asset maintenance work 11.08.23
2023/CE-II/TK/Fencing Policy Safety fencing along the track. 09.06.2023
2023/CE-II/TK/Fencing Policy Safety fencing along the track. 15.05.2023
2023/CE-II/TK/FencingPolicy Safety fencing along the track. 14.03.2023
2023/CE-II/TK/Fencing Policy Policy guidelines for providing safety fencing along the track. 16.02.2023
2017/CE-II/TK/HS/130 Raising of sectional Speed to 130 Kmph on BG Routes over Indian Railways.  07.02.2023
2023/CE-II/TS/Sidings Track structure for existing loop lines and sidings for operation of higher axle loads. 18.01.2023
2022
2021/CE-II/TSC/10th Extraordinary Provision of ballastless track at major important stations and stations identified under Major Upgradation/Redevelopment 29.09.2022
2019/CE-II/TS/25t Operation of 25t axle load on PSC (RT-2496) Sleepers upto 100 Kmph   22.08.2022
2022/CE-II/TK/Turnout/Renewal  Renewal of sleepers on Point and crossings.  05.08.2022
2022/CE-II/WP/TRP/23-24  Provision of PSC Sleepers in Through Rail Renewal (Primary) works. 04.08.2022
2022/CE-II/Board Meeting Faster execution of capacity enhancement/asset maintenance works. 16.06.2022
2022/CE-II/TK/M3000MT Mission 3000 MT.   09.06.2022
2021
2021/CE-II/TSC/10TH  Extraordinary Revised norms of track maintenance and criteria of track renewal 16.07.2021
2020
2019/CE-II/TK/ROI Inspection Schedule of Sr. DEN/DEN 23.12.2020
2019/CE-II/TS/25T Operation of 25 ton axle load over selected routes of IR and feeder routes of DFC 01.09.2020
2019/CE-II/TSC/88/Puri Track Structure for operation of CC+8+2t Loaded trains. 28.08.2020
2018/CE-II/TK/WIAST Speed of entry in 1st Loop to be enhanced from 30 kmph to 50 kmph 24.08.2020
2018/CE-II/TK/S&T/AGL&DH Improving performance of Track-Avoiding requirement of Glued Joints and Drilling of holes in rails for S&T and Traction Installation (TI) fixtures. 20.08.2020
2009/CE-II/Accident/Policy Negotiability of BLC/BCLC Container wagons on loops 20.08.2020
2020/CE-II/TS/22.9 Operation of 22.9 ton axle load wagons at 75 kmph 20.08.2020
2017/CE-II/TK/HS/130 Raising of sectional speed to 130 kmph on the routes of Golden Quadrilateral and the diagonals routes 03.06.2020
2017/CE-II/TK/HS/130 Rasing of Sectional Speed of sections having present speed less than 100 kmph. 12.03.2020
2019
2017/CE-II/TK/Policy Provision of GPS Trackers to Keymen and Patrolmen. 17.12.2019
2019/CE-II/TK/160/NDLS-Howrah Raising of sectional speed to 130 kmph on the routes of Golden Quadrilateral and the diagonal routes. 17.12.2019
2017/CE-II/Accd/Reporting by ZR Reporting of Accidents/Unusual incidents 25.07.2019
2017/CE-II/TK/Policy Obstructions in newly commissioned track 20.05.2019
2018
2018/CE-II/Meeting /1Pt. Construction of Ballastless Track on Run Through Main Lines at ‘A-1’ & ‘A’ category stations 31.10.2018
2012/CE-II/TRACKMEN REPORT/Pt. Provision of VHF based approaching Train Warning System for Track Maintenance on Golden Quadrilateral & its Diagonals on Indian railways 12.10.2018
2012/CE-II/TK/TRACKMEN REPORT/Pt Provision of VHF based approaching Train Warning System for Track Maintenance on Golden Quadrilateral & its Diagonals on Indian railways 11.10.2018
2018/CE-II/TK/HS/GQ-160 Speed Policy Frame work for Indian Railways 08.10.2018
2018/CE-II/TK/WIAST Order of priority for raising speed on Main line turnouts to 50 kmph12.09.2019 11.09.2018
2010/CE-II/TK/PSR Increase in Speed Turnouts 7.08.2018
2016/CE-II/TS /2(CC+8+2) Operation of CC+8+2/CC+6+2 trains 24.08.2018
2017/CE-II/TK/POLICY Construction of Ballastless Track on Run Through Main Lines at ‘A-1’ & ‘A’ category stations 03.08.2018
2013/CE-II/TS/DFC(Feeder Route) Track renewal on DFC Feeder and 25t axle load routes.  20.07.2018
2018/CE-II/TS/2(CC+2+2t) Delegation of powers to Zonal Railways for approval of running of CC+8+2t trains. 19.07.2018
2018/CE-II/TS/25T Running of 25 Tonne axle load freight train on Indian Railway – Rail Stress Calculation.  21.06.2018
2016/CE-II/TSC/1 Railway Board’s orders on Minutes of 9th Extra-ordinary meeting of Track Standard Committee held at IRICEN/Pune from 18.01.2018 and 19.01.2018. 14.06.2018
D.O.No.2017/CE-II/TK/HS/130 Raising maximum permissible speed of sections 21.03.2018
No.2018/CE-II/TS/25T Track Structure for Operation of 25T Axle Load Trains. 14.03.2018
No.2018/CE-II/TS/25T Operation of 25T Axle Load Trains. 14.03.2018
No.2018/CE-II/PCDO/Assistance Required Reporting Progress of Track Renewal items in PCDO 09.03.2018
No.2018/CE-II/PCDO/Assistance Required Revision of Proforma of Performance Progress Report Annexure-1 of PCDO to ME 06.02.2018
D.O.No.2015/CE-II/TK/KRCL Adoption of Konkan Railway System of Track Maintenance on Indian Railway. 09.01.2018
2017
No.2017/CE-II/TK/Policy/Pt Provision of GPS trackers to all patrolmen and outsourcing activity of patrolling   17.11.2017
No.2014/CE-II/Genl/DC/JCM DC/JCM Item No.24/2011 – Provision of accommodation to Trackmen in Accident Relief Trains. 26.10.2017
No./2016/CE-II/TK/1 Telemetry enablement and connecting with TMS for Continuous Rail Temperature (CRRT)Measurement Device. 12.09.2017
No.2009/CE-II/TK/1(Policy Measurement of Clean Track Ballast Cushion and Updation of details in Track Diagram 12.04.2017
D.O.No.2017/CE-II/Accd/Reporting by ZR Reporting of Accidents. 03.03.2017
No.2006/CE-II/TS/1Pt. Availability and working of Weighbridges 01.03.2017
2016
No.2016/CE-II/Genl./PNM/Matter Provision of protective Helmets with Miner’s Lights to patrolmen. 20.12.2016
No.2010/CE-II/TK/4/PSR Increase in Sectional Speed and Speed on Turnouts 20.09.2016
No.2014/CE-II/TSC/1 Pt.-1 Requirement of minimum track structure for speeds beyond 110 kmph of Passenger carrying train on BG IR 08.09.2016
No.2016/CE-II/Genl./Misc Objective evaluation of SSEs/P.Way by Zonal Railways 23.08.2016
No.2009/CE-II/TK/1(Policy) Recording of Track Parameters by TRC/OMS and monitoring of Track. 30.06.2016
No.2014/CE-II/Genl/PNM Tools and Equipments of P.Way Gang 17.06.2016
No.2007/EDC(P)/Insp. Note Inspection of Centralized Training institute 07.06.2016
No.2013/CE-II/TS/DFC(Feeder Routes) Specifications of PSC sleepers on 25t routes 27.05.2016
No.2014/CE-II/Genl/PNM Equipments of Keyman (Para 169 of IRPWM) 02.05.2016
No.2011/CE-II/Accident/ Policy Directed maintenance of major yards. 04.04.2016
2009/CE-II/Accident/Policy Prevention of Derailment of container flat wagons 09.02.2016
2015
No.2011/CE-II/SR/1 Removal/Relaxtion of Permanent Speed Restriction 27.08.2015
2006
No.2006/CE-II/WP/24 Pt Removal/Relaxtion of Permanent Speed Restriction 21.12.2006