| No. | Subject | Date of Issue |
| 2025 | ||
| 2023/CE-II/Meeting/CTEs Conf. | Manual execution of TSR & Deep screening | 17.02.2026 |
| 2023/CE-II/TK/Inspection | Focused Attention on Deep Screening and Maintenance of Turnouts. | 27.01.2026 |
| 2024/CE-II/Genl/Misc | Maintenance of ‘Rough Journal of Inspections’ for USFD testing of AT Welds and uploading of records on TMS. | 27.01.2026 |
| 2025 | ||
| 2024/CE-II/Genl/Misc. | 'Rough Journal of Inspections' for scheduled inspections of JE/SSE/P.Way. | 26.12.2025 |
| 2025/CE-II/TK/IMC | Super-check/audit of Points & Crossings by Track Analytics Cell. | 26.12.2025 |
| 2024/CE-II/Genl/Misc. | Uploading of inspection details of Points & Crossings from Rough Journal of of Inspections on TMS. | 17.12.2025 |
| 2024/CE-II/Genl/Misc. | Rough Journal of Inspections' for scheduled inspections of JE/SSE/P.Way | 16.12.2025 |
| Inspection Schedule of Sr. DEN/DEN. | 02.12.2025 | |
| 2023/CE-II/TK/Inspection | Inspection of Training Institutes/Centers/Schools in Zonal Railways. | 05.12.2025 |
| 2019/CE-II/Perf./TMS | Uploading of Track related letters/circulars in TMS. | 25.09.2025 |
| 2025/CE-II/TK/IMC | Introduction of new system of turnout maintenance – Inspection–Maintenance – Confirmation (IMC Model). | 25.09.2025 |
| 2019/CE-II/Perf./TMS | Introduction of Scrap Disposal Modules in UDM (User Depot Module) | 24.09.2025 |
| 2014/CE-II/TSC/1 Pt.-I | Requirement of minimum track structure for speeds beyond 110 kmph of Passenger carrying train on BG IR | 11.09.2025 |
| 2017/CE-II/TK/Policy-Part(1) | Upgradation of Existing Bridges in Cut/Connection Sections During Doubling/Gauge Conversion Projects to Comply with Terms of Reference (TOR) | 02.09.2025 |
| No.2025/CE-II/TK/PCE/CTE/TSC | Bi-monthly Presentation on Status of Items from PCE’s Seminar, CTE’s Seminar and TSC. | 28.08.2025 |
| No.2023/CE-II/Meeting/CTEs Conf. | Manual execution of TSR & Deep Screening. | 19.08.2025 |
| 2025/CE-II/TK/TACell | Establishment of Track Analytics Cell | 31.07.2025 |
| 2019/CE-II/WP/PBC | Revival of deleted works of LAW Book under PH-31 | 28.07.2025 |
| 2024/CE-II/Safety | Working of Motor/Moped Trolley | 07.07.2025 |
| 2023/CE-II/Safety/Instruction | Instructions for maintenance of track on Ghat Sections and Sections having curve sharper than 5° on gradient steeper than 1 in 100. | 14.06.2025 |
| 2022/CE-II/TK/Turnout/Renewal | Preparation of ESP on Digital Platform. | 14.05.2025 |
| 2025/CE-II/Meeting/CTE's Conf. | Inclusion of progress of ISD (Increase in Sleeper Density) works in TSR(S). | 06.06.2025 |
| No.2023/CE-II/TK/FencingPolicy | Policy guidelines for providing safety fencing along the track | 23.04.2025 |
| 2009/CE-II/Accident/Policy | Movement of container Flat Wagon (BLC) and loaded EUR rakes on second and subsequent loops. | 24.03.2025 |
| 2009/CE-II/Accident/Policy | Movement of container Flat Wagon (BLC) and loaded EUR rakes on second and subsequent loops. | 18.03.2025 |
| 2024 | ||
| 2023/CE-II/Safety/Instruction | Annual Ballast Planning | 19.12.2024 |
| 2023/CE-II/Safety/Instruction | Important Aspects regarding Ballast DMT Unloading. | 19.12.2024 |
| 2015/CE-II/TK/14 | Yard Drainage Plan | 11.12.2024 |
| 2024/CE-II/Genl/Misc | Periodical meetings of SrDEN/Cs & ADENs. | 29.11.2024 |
| 2016/CE-II/TS/2/CC+8+2t | Operation of CC+8+2t (22.9t) loaded trains | 13.11.2024 |
| 2013/TMS/Netbooks/Policy |
Replacement of Netbooks provided to P.way officials for implementation of TMS in lndian Railways. |
03.11.2014 |
| 2024/CE-II/CRS/12810 | CRS's recommendations in Preliminary Report on side collision of train no. 12810 (HWH-CSMT Mail) with Goods train no. N/JBCT in CKP Division of SECR on 30.07.2024. | 18.10.2024 |
| . | ||
| 2024/CE-II/TK/Track Tolerance | Up-gradation of Track Maintenance Standards of Goods Loop Lines | 30.10.2024 |
| 2024/CE-II/TK/Track Tolerance | Up-gradation of Track Maintenance Standards of Passenger Loop Lines | 28.10.2024 |
| 2019/CE-II/WP/Policy-UMB | Procedure for processing of proposals in IRPSM and sanctioning of itemised works against Umbrela Works under Plan Head - 31(Track Renewals) for WP 2025-26 & onwards. | 17.08.2024 |
| 2019/CE-II/TS/25t | Operation of 25t axle load over selected routes of IR | 23.07.2024 |
| 2024/CE-II/Safety | Display of Single PSR Board | 20.06.24 |
| 2023/CE-II/TK/Fencing Policy | Safety Fencing Works Along the Track -Reg. | 06.05.2024 |
| 2024/CE-II/Genl/Misc. | Issue of uniform and other accessories to Trackmen Keymen Mates and Patrolmen | 02.05.2024 |
| 2023/CE-II/TK/Fencing Policy | Details of proposed subways in relation with safety fencing along the track | 15.02.2024 |
| 2023 | ||
| 2022/CE-1I/Board Meeting | Provision of Engineering Time Allowance(ETA) for Faster execution of capacity enhancement/asset maintenance work | 11.08.23 |
| 2023/CE-II/TK/Fencing Policy | Safety fencing along the track. | 09.06.2023 |
| 2023/CE-II/TK/Fencing Policy | Safety fencing along the track. | 15.05.2023 |
| 2023/CE-II/TK/FencingPolicy | Safety fencing along the track. | 14.03.2023 |
| 2023/CE-II/TK/Fencing Policy | Policy guidelines for providing safety fencing along the track. | 16.02.2023 |
| 2017/CE-II/TK/HS/130 | Raising of sectional Speed to 130 Kmph on BG Routes over Indian Railways. | 07.02.2023 |
| 2023/CE-II/TS/Sidings | Track structure for existing loop lines and sidings for operation of higher axle loads. | 18.01.2023 |
| 2022 | ||
| 2021/CE-II/TSC/10th Extraordinary | Provision of ballastless track at major important stations and stations identified under Major Upgradation/Redevelopment | 29.09.2022 |
| 2019/CE-II/TS/25t | Operation of 25t axle load on PSC (RT-2496) Sleepers upto 100 Kmph | 22.08.2022 |
| 2022/CE-II/TK/Turnout/Renewal | Renewal of sleepers on Point and crossings. | 05.08.2022 |
| 2022/CE-II/WP/TRP/23-24 | Provision of PSC Sleepers in Through Rail Renewal (Primary) works. | 04.08.2022 |
| 2022/CE-II/Board Meeting | Faster execution of capacity enhancement/asset maintenance works. | 16.06.2022 |
| 2022/CE-II/TK/M3000MT | Mission 3000 MT. | 09.06.2022 |
| 2021 | ||
| 2021/CE-II/TSC/10TH Extraordinary | Revised norms of track maintenance and criteria of track renewal | 16.07.2021 |
| 2020 | ||
| 2019/CE-II/TK/ROI | Inspection Schedule of Sr. DEN/DEN | 23.12.2020 |
| 2019/CE-II/TS/25T | Operation of 25 ton axle load over selected routes of IR and feeder routes of DFC | 01.09.2020 |
| 2019/CE-II/TSC/88/Puri | Track Structure for operation of CC+8+2t Loaded trains. | 28.08.2020 |
| 2018/CE-II/TK/WIAST | Speed of entry in 1st Loop to be enhanced from 30 kmph to 50 kmph | 24.08.2020 |
| 2018/CE-II/TK/S&T/AGL&DH | Improving performance of Track-Avoiding requirement of Glued Joints and Drilling of holes in rails for S&T and Traction Installation (TI) fixtures. | 20.08.2020 |
| 2009/CE-II/Accident/Policy | Negotiability of BLC/BCLC Container wagons on loops | 20.08.2020 |
| 2020/CE-II/TS/22.9 | Operation of 22.9 ton axle load wagons at 75 kmph | 20.08.2020 |
| 2017/CE-II/TK/HS/130 | Raising of sectional speed to 130 kmph on the routes of Golden Quadrilateral and the diagonals routes | 03.06.2020 |
| 2017/CE-II/TK/HS/130 | Rasing of Sectional Speed of sections having present speed less than 100 kmph. | 12.03.2020 |
| 2019 | ||
| 2017/CE-II/TK/Policy | Provision of GPS Trackers to Keymen and Patrolmen. | 17.12.2019 |
| 2019/CE-II/TK/160/NDLS-Howrah | Raising of sectional speed to 130 kmph on the routes of Golden Quadrilateral and the diagonal routes. | 17.12.2019 |
| 2017/CE-II/Accd/Reporting by ZR | Reporting of Accidents/Unusual incidents | 25.07.2019 |
| 2017/CE-II/TK/Policy | Obstructions in newly commissioned track | 20.05.2019 |
| 2018 | ||
| 2018/CE-II/Meeting /1Pt. | Construction of Ballastless Track on Run Through Main Lines at ‘A-1’ & ‘A’ category stations | 31.10.2018 |
| 2012/CE-II/TRACKMEN REPORT/Pt. | Provision of VHF based approaching Train Warning System for Track Maintenance on Golden Quadrilateral & its Diagonals on Indian railways | 12.10.2018 |
| 2012/CE-II/TK/TRACKMEN REPORT/Pt | Provision of VHF based approaching Train Warning System for Track Maintenance on Golden Quadrilateral & its Diagonals on Indian railways | 11.10.2018 |
| 2018/CE-II/TK/HS/GQ-160 | Speed Policy Frame work for Indian Railways | 08.10.2018 |
| 2018/CE-II/TK/WIAST | Order of priority for raising speed on Main line turnouts to 50 kmph12.09.2019 | 11.09.2018 |
| 2010/CE-II/TK/PSR | Increase in Speed Turnouts | 7.08.2018 |
| 2016/CE-II/TS /2(CC+8+2) | Operation of CC+8+2/CC+6+2 trains | 24.08.2018 |
| 2017/CE-II/TK/POLICY | Construction of Ballastless Track on Run Through Main Lines at ‘A-1’ & ‘A’ category stations | 03.08.2018 |
| 2013/CE-II/TS/DFC(Feeder Route) | Track renewal on DFC Feeder and 25t axle load routes. | 20.07.2018 |
| 2018/CE-II/TS/2(CC+2+2t) | Delegation of powers to Zonal Railways for approval of running of CC+8+2t trains. | 19.07.2018 |
| 2018/CE-II/TS/25T | Running of 25 Tonne axle load freight train on Indian Railway – Rail Stress Calculation. | 21.06.2018 |
| 2016/CE-II/TSC/1 | Railway Board’s orders on Minutes of 9th Extra-ordinary meeting of Track Standard Committee held at IRICEN/Pune from 18.01.2018 and 19.01.2018. | 14.06.2018 |
| D.O.No.2017/CE-II/TK/HS/130 | Raising maximum permissible speed of sections | 21.03.2018 |
| No.2018/CE-II/TS/25T | Track Structure for Operation of 25T Axle Load Trains. | 14.03.2018 |
| No.2018/CE-II/TS/25T | Operation of 25T Axle Load Trains. | 14.03.2018 |
| No.2018/CE-II/PCDO/Assistance Required | Reporting Progress of Track Renewal items in PCDO | 09.03.2018 |
| No.2018/CE-II/PCDO/Assistance Required | Revision of Proforma of Performance Progress Report Annexure-1 of PCDO to ME | 06.02.2018 |
| D.O.No.2015/CE-II/TK/KRCL | Adoption of Konkan Railway System of Track Maintenance on Indian Railway. | 09.01.2018 |
| 2017 | ||
| No.2017/CE-II/TK/Policy/Pt | Provision of GPS trackers to all patrolmen and outsourcing activity of patrolling | 17.11.2017 |
| No.2014/CE-II/Genl/DC/JCM | DC/JCM Item No.24/2011 – Provision of accommodation to Trackmen in Accident Relief Trains. | 26.10.2017 |
| No./2016/CE-II/TK/1 | Telemetry enablement and connecting with TMS for Continuous Rail Temperature (CRRT)Measurement Device. | 12.09.2017 |
| No.2009/CE-II/TK/1(Policy | Measurement of Clean Track Ballast Cushion and Updation of details in Track Diagram | 12.04.2017 |
| D.O.No.2017/CE-II/Accd/Reporting by ZR | Reporting of Accidents. | 03.03.2017 |
| No.2006/CE-II/TS/1Pt. | Availability and working of Weighbridges | 01.03.2017 |
| 2016 | ||
| No.2016/CE-II/Genl./PNM/Matter | Provision of protective Helmets with Miner’s Lights to patrolmen. | 20.12.2016 |
| No.2010/CE-II/TK/4/PSR | Increase in Sectional Speed and Speed on Turnouts | 20.09.2016 |
| No.2014/CE-II/TSC/1 Pt.-1 | Requirement of minimum track structure for speeds beyond 110 kmph of Passenger carrying train on BG IR | 08.09.2016 |
| No.2016/CE-II/Genl./Misc | Objective evaluation of SSEs/P.Way by Zonal Railways | 23.08.2016 |
| No.2009/CE-II/TK/1(Policy) | Recording of Track Parameters by TRC/OMS and monitoring of Track. | 30.06.2016 |
| No.2014/CE-II/Genl/PNM | Tools and Equipments of P.Way Gang | 17.06.2016 |
| No.2007/EDC(P)/Insp. Note | Inspection of Centralized Training institute | 07.06.2016 |
| No.2013/CE-II/TS/DFC(Feeder Routes) | Specifications of PSC sleepers on 25t routes | 27.05.2016 |
| No.2014/CE-II/Genl/PNM | Equipments of Keyman (Para 169 of IRPWM) | 02.05.2016 |
| No.2011/CE-II/Accident/ Policy | Directed maintenance of major yards. | 04.04.2016 |
| 2009/CE-II/Accident/Policy | Prevention of Derailment of container flat wagons | 09.02.2016 |
| 2015 | ||
| No.2011/CE-II/SR/1 | Removal/Relaxtion of Permanent Speed Restriction | 27.08.2015 |
| 2006 | ||
| No.2006/CE-II/WP/24 Pt | Removal/Relaxtion of Permanent Speed Restriction | 21.12.2006 |