inner-banner-img

 

 

 

 

 

File No. &

Subject

Date

2020/M(C)/650/2

 

IOH Overdue NMG type coaches .

 

01.05.24

 

2023/M(C)/141/6

 

Measures to prevent fire in coaches

09.05.24

 

2023/M(C)/142/4

 

Corresponding PB No. (2024-25) for serial numbers mentioned against RSP Work allotment.

14.05.24

 

2007/M(C)/137/16 Vol. VII

 

Quality issues in MCF Coaches

14.05.24

 

96/M(C)/141/77

 

 

Improvement in water filling arrangements in coaches

20.05.2024

2017/M(C)/138/2

 

Fire safety issues in coaches

22.05.24

 

2020/M(C)/142/4pt VI

 

Provision of fire safety system in coaches

24.05.24

 

96/M(C)/141/77

 

Issues related to real timewater level indicators and QWS in coaches /stations.

28.05.2024

96/M(C)/141/77

 

IoT based water level monitoring

29.05.2024

2007/M(C)/137/16 Vol. VII

 

Standard installation of WSP junction box and sensor in LHB Coaches

07.06.24

 

2006/M(C)/141/25

 

Readiness of ICF/LHB Coaching stock for kumbh mela jan 25 to feb 25

10.06.2024

 

2023/M(C)/165/5

 

Updation of unusual pertaining to coaches on CMM

18.06.24

 

2007/M(C)/137/16 Vol. VII

 

Lhb coaches with provisions of TPU rings in suspension arrangements.

20.06.24

 

2023/M(C)/141/6

 

Action for improving passenger service

24.06.24

 

96/M(C)/141/77

 

Improvement in water filling arrangement in coaches

24.06.2024

2020/M(C)/142/4pt VI

 

Introduction of Fire and smoke detection system (FSDS) and fire detection and suppression system (FDSS) in vendor directory

25.06.24

 

2021/M(C)/137/5pt II

Provision of CCTV Cameras in coaches and locos.

04.07.24

 

2021/M(C)/58/1Mtg.& Conf

MoM  held with SER on 17/7/2024

04.07.24

 

2023/M(C)/141/6

 

Safety review held at Railway board on 08.05.24

09.07.24

 

2023/M(C)/141/6

 

Drive for bio tank in LHB and ICF coaches

10.07.24

 

2024/M(C)/142/2

Commissioning of new coaches on CMM

05.04.2024
2007/M(C)/141/1

Enhancing Passenger Experience in Coaches

05.02.2024
2017/M(C)/138/2

Issues of Brake Binding, Brake block jamming, train parting in Rolling stock

24.01.2024

2023/M(C)/141/6

 

 

Drive for checking bio digester tank & Bio- Vacuum toilets in Vande Bharat Coaches

11.07.24

2020/M(C)/650/2

 

Lashing procedure for securing automobiles inside NMG Coach.

18.07.24

 

96/M(C)/141/77

 

Committee report on requirement of manpower for en-route watering of the trains

22.07.24

2021/M(C)/58/1Mtg.& Conf

MoM held with SER on 17.07.2024

23.07.24

2021/M(C)/142/(15)

 

MoM held on pressurized flushing system / Electro –Pneumatic pressurized flushing system fitted in coaches.

26.07.2024

 

2021/M(C)/142/4(15)

 

Introduction of pressurized flushing system /Electro-Pneumatic Pressurised Flushing system in vendor directory

26.07.2024

 

2020/M(C)/650/2

 

Utilization of ICF SC &CBC WCB Coaches

31.07.2024

2024/M(C)/142/2

 

Allotment of LHB Coaches for rake formation FY 24-25.

31.07.2024

2017/M(C)/138/2Pt1

 

Liquidification of IOH and POH schedules of ICF Coaches

05.08.2024

 

2020/M(C)/650/2

 

 

IOH Overdue NMG type coaches

06.08.2024

2007/M(C)/137/16 Vol. VII

 

Standard installation of WSP Junction box & sensor in LHB Coaches

09.08.2024

 

2023/M(C)/141/6

 

 

Special inspections to water leakage in all AC Coaches

09.08.2024

2007/M(C)/137/16 Vol. VII

 

Comprehensive list of additional NTXR rejectable items during shop schedule attention of LHB Coaches 28.08.2024

 (SS-II/SS-III)

28.08.2024

2020/M(C)/137/10

 

Rsp WORKS REGARDING UPGRADATION OF icf RAKES UNDER pb No. 612/24-25 (Suppl/2-18-19)

30.08.2024

2022/M(C)/141/6Safety

 

Pit line infrastructure in coaching Depots.

13.09.2024

 

2017/M(C)/138/2

 

MoM for technical seminar of coaching workshops held at RCNK/SNP on 21.08.2024

19.09.2024

 

2020/M(C)/650/2

 

Validity of BPC for NMG CC rakes

19.09.2024

 

2024/M(C)/142/2

 

Provision of funds under Bulk order RSP M© Items  (Coaches) RE 2024-25 AND BE 2025-26

25.09.2024

 

2024/M(C)/142/2

 

Allotment of LHB Coaches for rake formation FY 24-25.

25.09.2024

 

97/M(C)/137/1 Vol.XIV

Wheel profile measurement in LHB Coaching stock.

27.09.2024

2020/M(C)/141/2Pt

 

Development of module on wheel slip protection (WSP) maintenance on iGOT

27.09.2024

 

2023/M(C)/141/6

 

Locking arrangement for isolating cock of FSDS and sealing of solenoid valve of FDSS.

30.09.2024

 

2024/M(C)/142/4

 

Retro- fitment of revised wiring with modified junction boxes and connectors.

01.10.2024

 

2024/M(C)/142/2

 

Conversion of 1000 Humsafar coaches from rake formation type FSDS to standalone type FSDS with braking feature

01.10.2024

 

2024/M(C)/142/2

 

Modification in the air brake pipe line and associated fittings for 5500 coaches

01.10.2024

 

2007/M(C)/137/16 Vol. VII

Coach modifications issued by ICF and RDSO

01.10.2024

2017/M(C)/138/2Pt1-1

Attention to Passenger amenity during SS-1 and IOH Schedules

01.10.2024

 

76/M(C)/137/31 Vol.V

Fire protection in coaches.

03.10.2024

76/M(C)/137/31 Vol.V

Fire protection in coaches.

03.10.2024

2017/M(C)/138/2Pt1-1

Attention to passenger amenities item during SS1/IOH Schedules.

03.10.2024

 

2021/M(C)/142/4(15)

Introduction of  Pressurised flushing system/Electro-Pneumatic pressurized flushing system in vendor directory

09.10.2024

2007/M(C)/137/16 Vol. VII

Provision of TPU rings in LHB Coaches

10.10.2024

2014/M(C)/141/2-CMM

New updated in depot infrastructure on CMMS

16.10.2024

2024/M(C)/142/2

Deletion of RSP Works

21.10.2024

2020/M(C)/650/2

 

Calculation of validity of BPC of NMG premium rakes.

23.10.2024

2021/M(C)/58/1Mtg.& Conf

Minutes of VC held on 23.10.2024 reg. Coaching & Freight Unusuals

24.10.24

96/M(C)/141/77

 

Nomination of watering points in diverted trains.

04.11.2024

2020/M(C)/141/2Pt

Centralized procurement for spares of WSP system of LHB Coaches

06.11.2024

2020/M(C)/650/2

 

Board meeting held on 30.10.2024-Issues related to derailment of NMG Coaches

08.11.2024

2006/M(C)/141/25

Maintenance Dispensation for Kumbh Mela, 2025 at Prayagraj

14.11.2024

96/M(C)/141/77-II

Committee report on watering system of passenger coaches

27.11.2024

96/M(C)/141/77

 

Committee report on watering system of passenger coaches

27.11.2024

2020/M(C)/650/2Pt

Maintenance and operation of NMG Coaches

04.12.2024

2021/M(C)/58/1Mtg.& Conf

Minutes of VC Meeting regarding coaching  Unusuals

04.12.2024

2020/M(C)/650/2

 

Maintenance of NMG/NMGH/NMGHS Coaches over IR

06.12.2024

2020/M(C)/650/2

 

Conversion of  eligible ICF and NMG Coaches into NMGHS Coaches

13.12.2024

2006/M(C)/141/25

Regarding checking of ICF rakes for Kumbh Mela 2025

17.12.2024

2010/M(C)/650/2NMG

Maintenance of NMG/NMGH/NMGHS rakes

27.12.2024

2023/M(C)/165/5

 

Updation of unusual pertaining to coaches on CMM

30.12.2024