|
File No. & |
Subject |
Date |
|
|
IOH Overdue NMG type coaches .
|
01.05.24
|
|
|
Measures to prevent fire in coaches |
09.05.24
|
|
|
Corresponding PB No. (2024-25) for serial numbers mentioned against RSP Work allotment. |
14.05.24
|
|
|
Quality issues in MCF Coaches |
14.05.24
|
|
|
Improvement in water filling arrangements in coaches |
20.05.2024 |
|
|
Fire safety issues in coaches |
22.05.24
|
|
|
Provision of fire safety system in coaches |
24.05.24
|
|
|
Issues related to real timewater level indicators and QWS in coaches /stations. |
28.05.2024 |
|
|
IoT based water level monitoring |
29.05.2024 |
|
|
Standard installation of WSP junction box and sensor in LHB Coaches |
07.06.24
|
|
|
Readiness of ICF/LHB Coaching stock for kumbh mela jan 25 to feb 25 |
10.06.2024
|
|
|
Updation of unusual pertaining to coaches on CMM |
18.06.24
|
|
|
Lhb coaches with provisions of TPU rings in suspension arrangements. |
20.06.24
|
|
|
Action for improving passenger service |
24.06.24
|
|
|
Improvement in water filling arrangement in coaches |
24.06.2024 |
|
|
Introduction of Fire and smoke detection system (FSDS) and fire detection and suppression system (FDSS) in vendor directory |
25.06.24
|
|
Provision of CCTV Cameras in coaches and locos. |
04.07.24
|
|
|
2021/M(C)/58/1Mtg.& Conf |
MoM held with SER on 17/7/2024 |
04.07.24
|
|
|
Safety review held at Railway board on 08.05.24 |
09.07.24
|
|
|
Drive for bio tank in LHB and ICF coaches |
10.07.24
|
| 2024/M(C)/142/2 |
Commissioning of new coaches on CMM |
05.04.2024 |
| 2007/M(C)/141/1 |
Enhancing Passenger Experience in Coaches |
05.02.2024 |
| 2017/M(C)/138/2 |
Issues of Brake Binding, Brake block jamming, train parting in Rolling stock |
24.01.2024 |
|
|
Drive for checking bio digester tank & Bio- Vacuum toilets in Vande Bharat Coaches |
11.07.24 |
|
|
Lashing procedure for securing automobiles inside NMG Coach. |
18.07.24
|
|
|
Committee report on requirement of manpower for en-route watering of the trains |
22.07.24 |
|
MoM held with SER on 17.07.2024 |
23.07.24 |
|
|
|
MoM held on pressurized flushing system / Electro –Pneumatic pressurized flushing system fitted in coaches. |
26.07.2024
|
|
|
Introduction of pressurized flushing system /Electro-Pneumatic Pressurised Flushing system in vendor directory |
26.07.2024
|
|
|
Utilization of ICF SC &CBC WCB Coaches |
31.07.2024 |
|
|
Allotment of LHB Coaches for rake formation FY 24-25. |
31.07.2024 |
|
|
Liquidification of IOH and POH schedules of ICF Coaches |
05.08.2024
|
|
|
IOH Overdue NMG type coaches |
06.08.2024 |
|
|
Standard installation of WSP Junction box & sensor in LHB Coaches |
09.08.2024
|
|
|
Special inspections to water leakage in all AC Coaches |
09.08.2024 |
|
|
Comprehensive list of additional NTXR rejectable items during shop schedule attention of LHB Coaches 28.08.2024 (SS-II/SS-III) |
28.08.2024 |
|
|
Rsp WORKS REGARDING UPGRADATION OF icf RAKES UNDER pb No. 612/24-25 (Suppl/2-18-19) |
30.08.2024 |
|
|
Pit line infrastructure in coaching Depots. |
13.09.2024
|
|
|
MoM for technical seminar of coaching workshops held at RCNK/SNP on 21.08.2024 |
19.09.2024
|
|
|
Validity of BPC for NMG CC rakes |
19.09.2024
|
|
|
Provision of funds under Bulk order RSP M© Items (Coaches) RE 2024-25 AND BE 2025-26 |
25.09.2024
|
|
|
Allotment of LHB Coaches for rake formation FY 24-25. |
25.09.2024
|
|
Wheel profile measurement in LHB Coaching stock. |
27.09.2024 |
|
|
Development of module on wheel slip protection (WSP) maintenance on iGOT |
27.09.2024
|
|
|
Locking arrangement for isolating cock of FSDS and sealing of solenoid valve of FDSS. |
30.09.2024
|
|
|
Retro- fitment of revised wiring with modified junction boxes and connectors. |
01.10.2024
|
|
|
Conversion of 1000 Humsafar coaches from rake formation type FSDS to standalone type FSDS with braking feature |
01.10.2024
|
|
|
Modification in the air brake pipe line and associated fittings for 5500 coaches |
01.10.2024
|
|
Coach modifications issued by ICF and RDSO |
01.10.2024 |
|
|
Attention to Passenger amenity during SS-1 and IOH Schedules |
01.10.2024
|
|
|
Fire protection in coaches. |
03.10.2024 |
|
|
Fire protection in coaches. |
03.10.2024 |
|
|
Attention to passenger amenities item during SS1/IOH Schedules. |
03.10.2024
|
|
|
Introduction of Pressurised flushing system/Electro-Pneumatic pressurized flushing system in vendor directory |
09.10.2024 |
|
|
Provision of TPU rings in LHB Coaches |
10.10.2024 |
|
|
New updated in depot infrastructure on CMMS |
16.10.2024 |
|
|
Deletion of RSP Works |
21.10.2024 |
|
|
|
Calculation of validity of BPC of NMG premium rakes. |
23.10.2024 |
|
Minutes of VC held on 23.10.2024 reg. Coaching & Freight Unusuals |
24.10.24 |
|
|
|
Nomination of watering points in diverted trains. |
04.11.2024 |
|
Centralized procurement for spares of WSP system of LHB Coaches |
06.11.2024 |
|
|
|
Board meeting held on 30.10.2024-Issues related to derailment of NMG Coaches |
08.11.2024 |
|
Maintenance Dispensation for Kumbh Mela, 2025 at Prayagraj |
14.11.2024 |
|
Committee report on watering system of passenger coaches |
27.11.2024 |
|
|
|
Committee report on watering system of passenger coaches |
27.11.2024 |
|
Maintenance and operation of NMG Coaches |
04.12.2024 |
|
|
Minutes of VC Meeting regarding coaching Unusuals |
04.12.2024 |
|
|
|
Maintenance of NMG/NMGH/NMGHS Coaches over IR |
06.12.2024 |
|
|
Conversion of eligible ICF and NMG Coaches into NMGHS Coaches |
13.12.2024 |
|
Regarding checking of ICF rakes for Kumbh Mela 2025 |
17.12.2024 |
|
|
Maintenance of NMG/NMGH/NMGHS rakes |
27.12.2024 |
|
|
|
Updation of unusual pertaining to coaches on CMM |
30.12.2024 |