inner-banner-img
FOIS
Letter No. Subject Issue Date
2022
Policy Circular by Traffic Transportation Directorate 24.02.2022
2021
2015/TT-I/76/FOIS/1/TPMS Inclusion of Bathnaha (BTF)/NFR and Jankpur Raad (JNR/ECR terminals in e-ACT 17.01.2018
2015/TT-I/76/FOIS/1/TPMS Inclusion of Balrampur and Sardarnagar Terminal of NER in eACT  10.01.2018
2015/TT-I/76/FOIS/1/TPMS Inclusion of Balrampur and Sardarnagar Terminal of NER in eACT Terminals 02.01.2018
2015/TT-I/76/FOIS/1/TPMS Inclusion of Balrampur and Sardarnagar Terminal of NER in eACT Terminals 02.01.2018
  2016  
2015/TT-1/76/FOIS/1/TPMS Electronic Allotment for Congested Terminals (e-ACT) Corrigendum No.2) 22.02.2016
2015/TT-I/76/FOIS/1/TPMS Electronic Allotment for Congested Terminals (e-ACT) 08.02.2016
2015
2015/TT-1/76/FOIS/1/TPMS Extension of e-ACT to Cover two new stations on NER 04.06.2015
2015/TT-1/76/FOIS/1/TPMS E-ACT Master Circular 04.06.2015
2015/TT-I/76/FOIS/1/TPMS Extension of e-ACT. 27.04.2015
2014/TT-1/76/FOIS/1/TPMS Corrigendum e-Act-Inclusion of Raxaul and Siwan goods sheds. 25.03.2015
2014/TT-1/76/FOIS/1/TPMS e-ACT - inclusion of Raxaul and Siwan goods sheds. 25.03.2015
2014
2014/TT-I/76/FOIS/!/TPMS Electronic-Allotment for Congested Terminals(e-ACT) 03.02.2015
No.2014/TT-1/76/2/'FOIS Minutes of the meeting held in the chamber of AM/Traffic on 04.08.2014 to finalise the strategy for Field Implementation of the e-Demand Module. 06.08.2014
2013/TT-I/76/23 Minutes of the 3rd Meeting of theFOIS Imporvement Group held in 22.07.2014 in Railway Board 30.07.2014
  2013  
2012/TT-I/76/2/FOIS Minutes of the 2nd Meeting of theFOIS Imporvement Group Meeting held in Rail Bhawan on 27.11.2013 05.12.2013
ERB-I/2013/23/32 Nomination of ED(AIMS) as Member of FOIS Improvement Group 30.10.2013
2012/TT-I/76/2/FOIS Minutes of the Meeting of theFOIS Imporvement Group Meeting held in Railway Board on 18.09.2013 19.09.2013
ERB-1/2013/23/32 FOIS Imporvement Group 03.09.2013
2010/TT-I/76/4/RMS (pt.) TPMS implementation - Referential Data of Goods Sheds/Sidings in FOIS. 18.02.2013
CAO/FOIS/63/Main/Pt. V/10/Wigh bridge Changes in FOIS for Reporting of Loco Schedule for Electric locos in FOIS. 29.01.2013
2012/TT-II/1/SPM POL Loading - Capturing Expected Date of Loading in FOIS/TMS. 23.01.2013
  2012  
2010/TT-IV/9/2/FOIS Reporting of Loco Schedule for Electric locos in FOIS. 15.12.2012
2010/TT-IV/9/2/FOIS

Reporting of Loco Schedule for Electric Locos.

13.08.2012
No.2010/TT-I/76/4/FOIS/RMS/Pt. Corrigendum for Terminal Pipeline Management System (TPMS) 10.07.2012
No.2010/TT-I/76/4/FOIS/RMS/Pt. Terminal Pipeline Management System (TPMS) through FOIS - Covering all Goodsheds in NCR and SR. 02.07.2012
2010/TT-I/76/4/FOIS/RMS/Pt. Terminal Pipeline Management System (TPMS) through FOIS Covering all Goodsheds in NER, ECR and ER. 18.05.2012
2010/TT-I/76/4/FOIS/RMS/Pt. Terminal Pipeline Management System (TPMS) through FOIS - version 2.0 Trial from 14.03.2012 - reg 13.03.2012
2011
2010/TT-I/7/6/4/FOIS/RMS/Pt. Terminal Pipeline Management System (TPMS) through FOIS-Trial from 01.11.2011- amendment-reg 15.11.2011
2010/TT-1/76/4/FOIS/RMS/Pt. Terminal Pipeline Management System(TPMS) through FOIS - Trial from 01.11.2011 - reg. 12.10.2011
2011/TT-I/76/4/FOIS
Reporting of Loco Shed Outage - Modification in FOIS/COIS
09.03.2011
Source : Ministry of Railways (Railway Board) CMS Team Last Reviewed on: 25-02-2022