PART 'A' |
| 201 |
Responsibility of Engineering officials |
| 202 |
Classification of lines |
| 203 |
Systems of track maintenance |
| 204 |
Annual programme of track maintence |
| 205 |
Maintenance planning |
| 206 |
Record of gang work |
| 207 |
Attention to Inspection Notes |
| 208 |
Record of work of artisans and other workmen employed |
| 209 |
Special reports on the condition of Permanent way |
| 210 |
Permanent Way Inspector's section register |
| 211 |
Permanent way plans and diagrams |
| 212 |
Records of materials under trial |
| 213 |
Strength of gangs |
| 214 |
Musters |
| 215 |
Custody of gang tools |
| 216 |
Section Limit Board |
| 217 |
Kilometre and gradient posts |
| 218 |
Telegraph pole number |
| 219 |
Verification of land boundaries |
| 220 |
Trolly refuges |
| 221 |
Standard dimensions |
| 222 |
Felling of trees obstructing view |
| 223 |
Side drains, catch water drains and water-ways |
|
PART 'B' |
|
Regular Track Maintenance |
| 224 |
Through packing—Conventional maintenance by beater packing |
| 225 |
Maintenance by Measured shovel packing (deleted) |
| 226 |
Track maintenance by machines |
| 227 |
Systematic overhauling |
| 228 |
3-tier system of track maintenance |
| 229 |
Picking up slacks |
| 230 |
Observance of sleepers under passage traffic |
| 231 |
Sample of standard section off track |
| 232 |
Checking work of gangs by PWI |
| 233 |
Lifting of track |
| 234 |
Lowering of track |
| 235 |
Distance pieces to platform lines |
| 236 |
Fouling marks |
| 237 |
Inspection and maintenance of Points and Crossings |
|
PART 'C' |
|
Works incidental to regular track maintenance |
| 238 |
Deep screening of ballast |
| 239 |
Side and catch water drains and water-ways |
| 240 |
Drainage in station yards |
| 241 |
Lubrication of rail joints |
| 242 |
Counteraction and adjustment of creep |
| 243 |
Buckling of track |
|
PART 'D' |
|
Sleepers and Fastenings |
| 244 |
Laying of sleepers |
| 245 |
Wooden sleepers |
| 246 |
Cast iron sleepers |
| 247 |
Steel trough sleepers |
|
PART 'E' |
|
Rails and Fastenings |
| 248 |
Standard sections of rails |
| 249 |
Causes of rail deterioration |
| 250 |
Rail maintenance to reduce rail deterioration |
| 251 |
Maintenance of rail joints |
| 252 |
Inspection of rails in service |
| 253 |
Action to be taken in the case of rail fractures/weld failures |
| 254 |
Stacking of rails |
| 255 |
Handling of rails |
| 256 |
Rail closures |
| 257 |
Rail failures |
| 258 |
Careful usage of fish-plates |
| 259 |
Combination fish-plates |
| 260 |
Fish plate failures |
|
PART 'F' |
|
Ballast and Ballast Depots |
| 261 |
Type of ballast in use |
| 262 |
Size of ballast |
| 263 |
Ballast profiles/Sections/Depths of cushion |
| 264 |
Assessment of ballast requirements |
| 265 |
Collection and training out of ballast |
| 266 |
Depot collection of ballast |
| 267 |
Along side collections |
| 268 |
Handing over charge by AEN |
| 269 |
Unloading ballast along the line |
| 270 |
Surplus ballast along the line |
| 271 |
Ballasting new formation |
|
PART 'G' |
|
Track structure on Bridges |
| 272 |
Rail and rail joints on Bridges |
| 273 |
Bridge timbers |
| 274 |
Use of rail free fastenings in girder bridges |
| 275 |
Provision of guard rails on bridges |
| 276 |
Provision of walkways |
| 277 |
Inspection and maintenance of track on approaches of bridges |
| 278 |
Inspection and maintenance of Track on bridge proper |
|
Maintenance of Track in track circuited areas |
| 279 |
Precautions to be taken while working |
| 280 |
Insulated joints |
| 281 |
Glued insulated joints |
|
PART 'J' |
|
Maintenance in Electrified areas |
| 282 |
General instructions |
| 283 |
Special instructions |
| 284 |
Maintaining continuity of track |
| 285 |
Catch sidings |
| 286 |
Additional precautions in A. C. Traction area |
| 287 |
Fire in Electrified areas |
| 288 |
Permanent Way Tools |
| 289 |
Treatment of persons suffering from Electric shock |
| 290 |
Accident to power lines of outside bodies |
|
PART 'K' |
|
Treatment of Formation |
| 291 |
Classification of formation |
| 292 |
Nature of formation problems |
| 293 |
Site investigations |
| 294 |
Soil investigations and testing |
| 295 |
Remedial measures suggested |