inner-banner-img

Our Directorates

Our Directorates


⬅ Back to Directorate List
Indian Railway Board Lifeline to the Nation

2019

Extension Orders

2019

  2019E(GC)8-2(114) Extension of currency of one upgrade SAG workcharged post of IG-cum-PCSC/RPF for a period of 02 years beyond 30.06.18 i.e. upto 30.06.20 31.10.2019
  2015E(GC)1-2(81) Extension of currency of the HAG workcharged post of GM, Metro Railway/ Kolkata in level 16 of 7th CPC Pay matrix beyond 31.03.19 30.07.2019
  2019E(GC)1-1 (70) Extension of currency of GM, NFR (Con.) for a period of two years beyond 31.03.18. 25.06.2019
  2019E(GC)12-16(48) Operation of IRTS post 16.05.2019
  2019E(GC)12-16(49) Operation of IRTS post 16.05.2019
  2019E(GC)12-30(57) Operation of IRTS post 14.05.2019
  2019E(GC)12-27(55) Operation of IRTS & General Cadre posts. 08.05.2019
  2019E(GC)12-36 (Pt.I)(53) Operation of SAG post of CPM/Mechnical/WR as ADRM(operation)/ADI/WR 06.05.2019
  2019E(GC)12-46(62) Operation of IRAS posts 04.05.2019
  2019E(GC)12-30(61) Operation of IRTS & General Cadre posts 03.05.2019
  2015E(GC)1-2 (22) Extension of currency of HAG workcharged post of GM, Metro Rly./ Kolkata in level 16 of 7th CPC pay Matrix beyond 31.03.18 25.02.2019
  2017E(GC)3-15 (20) Extension of currency of the workcharged SAG post of CPO beyond 30.06.13. 15.02.2019

 

Extension of currency of GM, NFR (Con.) for a period of two years beyond 31.03.18.