��������������� �������

CORRECTION SLIPS TO IRTMM MARCH 2000

 

Correction Slip No. 4 Dated 26.05.2003:

The following New Paragraph No. 4.6.8 (iv) is added under Para 4.6-�Precautions� of Chapter 4 of IRTMM-2000-Rules for movement and working Track Machines as under.

����������� 4.6.8(iv)

����������� ��The vertical and lateral clearance for OHE, Signal post and any other structure ����������� should ����������� be checked and adjusted before clearing the block. It shall be insured by supervisor�� ����������� working with track machine that there should be no infringement to Signal post, OHE and ����������� any other Structure as per schedule of dimensions�

Authority: Board�s office�s letter No. 2000/Track-III/TK/18 dated 26.5.2003.