��������������� �������
Correction
Slip No. 4 Dated 26.05.2003:
The following New Paragraph No. 4.6.8 (iv) is added under Para
4.6-�Precautions� of Chapter 4 of IRTMM-2000-Rules for movement and working
Track Machines as under.
����������� 4.6.8(iv)
����������� ��The vertical and lateral clearance for OHE, Signal post and any other structure ����������� should ����������� be checked and adjusted before clearing the block. It shall be insured by supervisor�� ����������� working with track machine that there should be no infringement to Signal post, OHE and ����������� any other Structure as per schedule of dimensions�
Authority: Board�s
office�s letter No. 2000/Track-III/TK/18 dated 26.5.2003.